Information requests

Displaying 182 Document(s)

Joint letter providing an update on engagement between the Government of the Northwest Territories and Pehdzéh Kı̨́ First Nation.

A notice of proceeding granting the GNWT's extension request.

The developer (GNWT) answered all information requests from Round 2 on June 16, 2025. 

Most answers are in the table titled 'Reviewer Comments and Proponent Responses - June 16' (PR390).

Answers/Attachments are also posted on the registry under the following names:

And

  • IR responses to DRCC 1-3 (PR391)
  • IR responses to GTC 1-14 (PR392)
  • IR responses to SRRB IR 1-3 (PR393)
  • IR responses to MVEIRB 11-34 (PR394)
  • Attachments - answers to MVEIRB IRs 35-40 (PR335, posted in February)
  • IR responses to MVEIRB 52-65 (PR395)

Note: MVEIRB IRs 50, 51, and 58 will be answered in the DAR addendum. The GNWT is not responsible for MVEIRB IR 23. MVEIRB IRs 41-49 were directed to parties who were not legally required to answer. 

The developer (GNWT) answered all information requests from Round 2 on June 16, 2025. 

Most answers are in the table titled 'Reviewer Comments and Proponent Responses - June 16' (PR390).

Answers/Attachments are also posted on the registry under the following names:

And

  • IR responses to DRCC 1-3 (PR391)
  • IR responses to GTC 1-14 (PR392)
  • IR responses to SRRB IR 1-3 (PR393)
  • IR responses to MVEIRB 11-34 (PR394)
  • Attachments - answers to MVEIRB IRs 35-40 (PR335, posted in February)
  • IR responses to MVEIRB 52-65 (PR395)

Note: MVEIRB IRs 50, 51, and 58 will be answered in the DAR addendum. The GNWT is not responsible for MVEIRB IR 23. MVEIRB IRs 41-49 were directed to parties who were not legally required to answer. 

The developer (GNWT) answered all information requests from Round 2 on June 16, 2025. 

Most answers are in the table titled 'Reviewer Comments and Proponent Responses - June 16' (PR390).

Answers/Attachments are also posted on the registry under the following names:

And

  • IR responses to DRCC 1-3 (PR391)
  • IR responses to GTC 1-14 (PR392)
  • IR responses to SRRB IR 1-3 (PR393)
  • IR responses to MVEIRB 11-34 (PR394)
  • Attachments - answers to MVEIRB IRs 35-40 (PR335, posted in February)
  • IR responses to MVEIRB 52-65 (PR395)

The developer (GNWT) answered all information requests from Round 2 on June 16, 2025. 

Most answers are in the table titled 'Reviewer Comments and Proponent Responses - June 16' (PR390).

Answers/Attachments are also posted on the registry under the following names:

And

  • IR responses to DRCC 1-3 (PR391)
  • IR responses to GTC 1-14 (PR392)
  • IR responses to SRRB IR 1-3 (PR393)
  • IR responses to MVEIRB 11-34 (PR394)
  • Attachments - answers to MVEIRB IRs 35-40 (PR335, posted in February)
  • IR responses to MVEIRB 52-65 (PR395)

The developer (GNWT) answered all information requests from Round 2 on June 16, 2025. 

Most answers are in the table titled 'Reviewer Comments and Proponent Responses - June 16' (PR390).

Answers/Attachments are also posted on the registry under the following names:

And

  • IR responses to DRCC 1-3 (PR391)
  • IR responses to GTC 1-14 (PR392)
  • IR responses to SRRB IR 1-3 (PR393)
  • IR responses to MVEIRB 11-34 (PR394)
  • Attachments - answers to MVEIRB IRs 35-40 (PR335, posted in February)
  • IR responses to MVEIRB 52-65 (PR395)

The developer (GNWT) answered all information requests from Round 2 on June 16, 2025. 

Most answers are in the table titled 'Reviewer Comments and Proponent Responses - June 16 2025' (PR390).

Answers/Attachments are also posted on the registry under the following names:

And

  • IR responses to DRCC 1-3 (PR391)
  • IR responses to GTC 1-14 (PR392)
  • IR responses to SRRB IR 1-3 (PR393)
  • IR responses to MVEIRB 11-34 (PR394)
  • Attachments - answers to MVEIRB IRs 35-40 (PR335, posted in February)
  • IR responses to MVEIRB 52-65 (PR395)

The GNWT requests an extension to submit the DAR addendum in October 2025.

Public summaries of confidential Indigenous Knowledge documents submitted by the Pehdzéh Kı̨́ First Nation. The three documents are: 

  1. “Some PKFN Land Use and Occupancy along MVH Winter Road Route in the Dehcho”
  2. “Some PKFN Indigenous Knowledge about MVH Watercrossing Areas in the Dehcho”
  3. “Some PKFN Moose and Caribou Harvesting along MVH Winter Road Route in the Dehcho”.

Parties can view Pehdzeh Ki First Nations Confidential Information via an agreement with the Review Board. Non-confidential summaries of the Confidential Information are on the public registry. 

Letter with the Review Board's decision on Łı́ı́dlı̨ı̨ Kų́ę́ First Nation's Request for Ruling to accept confidential Indigenous Traditional Knowledge.

In response to the Mackenzie Valley Environmental Impact Review Board’s (the Review Board) January 23, 2025, ‘Directive to the GNWT to provide and analyse mitigation for the Mackenzie Valley Highway Project, Government of the Northwest Territories’ (PR318), which instructed the GNWT to “...clearly describe options for mitigating impacts…”, GNWT provided the Supplemental filing; Socio-Economic (Table 1) and Biophysical (Table 2) Mitigation Tables for the Mackenzie Valley Highway Project (EA1213-02).

Notification of Upcoming Extension Request for the DAR Addendum

 Meeting with developer about DAR Addendum and EA timelines

Correspondence: PKFN to MVEIRB: Updates Concerns

PKFN respects LKFN’s right and responsibilities to protect sensitive Dene knowledge, and understands the importance of providing information for the Review Board’s consideration

Letter from Enbridge supporting PKFN's Proposed Alternative Realignment.

The Review Board received a request for ruling to accept confidential Traditional Indigenous Knowledge from Liidlii Kue First Nation. Parties have until May 23 to provide any comments for the Review Board to consider when making its decision.

Liidlii Kue First Nation's Request for Ruling to accept confidential Indigenous Knowledge in written form. 

Comments on Proposed Realignment of MVH from Wrigley to Blackwater.

Information from PKFN on moose and caribou: Indigenous Knowledge, concerns, and recommendations.

Land management information from PKFN:

  • response to MVEIRB IR 44
  • response to MVEIRB IR 49
  • response to technical session request
  • map of areas to protect

IR round 2: GNWT responses to PKFN IRs 1-8. The responses can also be accessed on the Online Review System.

IR round 2: GNWT responses to LKFN 44 (additional maps). The responses can also be accessed on the Online Review System.

IR round 2: GNWT responses to LKFN 1-49. The responses can also be accessed on the Online Review System.

IR round 2: GNWT responses to CanNor IRs 1-12. The responses can also be accessed on the Online Review System.

Email attachment - LKFN comments to GNWT IR responses, in the Online Review System Table

LKFN comments to GNWT IR responses posted on the Online Review System.

PKFN suggests it would be helpful for parties to know what GNWT plans to do during the two-month extension.

A notice of proceeding granting the GNWT's extension request.

The Review Board's decision on PKFNs request for the Review Board to accept confidential TK information. 

Letter from GNWT to MVEIRB requesting a 2 month extension to submit the DAR Addendum and the remaining IR responses. 

Notice of Proceeding from the Review Board indicating that the Board will retain former Board member Brenda Gauthier as a special advisor for this environmental assessment. 

Note to file describing when the Review Board will release more information about the timeline, workplan, and public hearing phase of the MVH EA.

Letter from NPMO to the Review Board asking for clarification on the upcoming procedural matters for MVH.

Letter from the Review Board to TG asking about lessons learned from the Tłı̨chǫ Highway. 

GNWT Response to MVEIRB Directive: 'Directives to provide timely responses and a concordance table in the DAR Addendum’ (PR347)

DGG email re PKFN request for ruling. Todd Slack sent the email. DGG has no comment on the Request for Ruling.

GTC response to PKFN Request for Ruling. GTC has no concerns with the request.

Notice of Proceeding - MVH Community Session in Fort Good Hope on April 9, 2025.

PR348 GNWT Response to MVEIRB Notice of Proceeding regarding Pehdzeh Ki First Nation’s Request for Ruling to have the Review Board accept their confidential Indigenous Knowledge in written form. The Government of the Northwest Territories has no issue with the Request for Ruling.

Letter from the Review Board to GNWT with two directives regarding IR timelines and the DAR addendum.

The Review Board received a request for ruling to accept confidential Traditional Indigenous Knowledge from Pehdzeh Ki First Nation. Parties have until March 31 to provide any comments for the Review Board to consider when making its decision.

ECCC and GNWT met on February 5th and 7th, 2025, to discuss our IRs related to Caribou and Migratory Birds.

ECCC and GNWT met on February 5th and 7th, 2025, to discuss our IRs related to Caribou and Migratory Birds.

Pehdzeh Ki First Nation's Request for Ruling to accept confidential Indigenous Knowledge in written form. 

The Pehdzeh Ki First Nation (PKFN) is concerned that the current workplan timelines may prevent meaningful consultation and accommodation for PKFN.

Note to File - Discussion between PKFN and the Review Board about sharing confidential information (Traditional Land Use Study)

PR340 GNWT Response to February 14 Notice of Proceeding allowing the GNWT to respond to information request responses provided by Indigenous Governments and Indigenous organizations regarding the highway alignment.

PFKN and the Review Board discussed EA procedural matters, requests for rulings, and the confidential handling of Indigenous Traditional Knowledge.

The Mackenzie Valley Alternate Highway Route Alignment: A Study on Physical Viability. Prepared for Wrigley Community, Chief and Council, by Maskwa Engineering Ltd./Delta Engineering Ltd.
 

PR375 Correspondance PKFN to RB - Alternate Route Study cover letter - March 4, 2025. Linked to 
Correspondence from PKFN - MVH Alternate Route Alignment Study (PR338).

Sahtú Renewable Resource Board Information Request from January 17, 2025.

This information request is missing from the Information Request Table (PR329 GNWT cover letter with Reviewer IRs and Proponent Responses table), so it is posted as a separate document.

Letter from PKFN to the Review Board asking that a hearing be held at Pehdzeh Ki First Nation in Wrigley. 

Note to file about the meeting between the GNWT and Review Board staff on February 12, 2025, regarding the letter accompanying the Review Board's information requests (Round 2).

Government of Canada Cover Letter and responses to two information requests (Round 2):  GTC IR #15 (Project Benefits to National Security and Arctic Sovereignty) and SRRB IR #1 (Fish Passage and Fish Habitat).

 

 

Cover letter from the GNWT regarding the second round of information requests (IRs). The GNWT answered 49 IRs and is working on answering the remaining IRs “as soon as practicable.” 

Parties and the Review Board submitted a total of 153 IRs during Round 2. Of the 153 IRs, 138 answers were due on February 28, and 15 other answers are due on April 11, 2025.

The table contains the preamble and information requests from parties and the Review Board. Most of GNWT's answers were provided as attachments, which are grouped by parties on the Public Registry.

Attachments - answers to SRRB IR 1.

See PR329 GNWT cover letter with Reviewer IRs and Proponent Responses table for more information regarding the remaining answers to information requests.

Attachments - answers to MVEIRB IRs 35-40.

See PR329 GNWT cover letter with Reviewer IRs and Proponent Responses table for more information regarding the remaining answers to information requests.

Attachments - answers to LKFN IRs 1,3,4,6,7,13-16,18-25.

See PR329 GNWT cover letter with Reviewer IRs and Proponent Responses table for more information regarding the remaining answers to information requests.

Attachments - answers to GTC IRs 8, 10,13,14.

See PR329 GNWT cover letter with Reviewer IRs and Proponent Responses table for more information regarding the remaining answers to information requests.

Attachments - answers to CanNor IRs 1-3,6.

See PR329 GNWT cover letter with Reviewer IRs and Proponent Responses table for more information regarding the remaining answers to information requests.

Attachment - answer to MVEIRB IR 14.

See PR329 GNWT cover letter with Reviewer IRs and Proponent Responses table for more information regarding the remaining answers to information requests.

The DAR Addendum deadline has been moved from the end of March to April 11, 2025.

Correspondence between Pehdzéh Kį First Nation (PKFN) and the Review Board. The letter outlines that PKFN has not yet shared information regarding their land use, sensitive locations, and preferred alternative route because of confidentiality concerns.

This notice of proceeding provides notice that the GNWT has until March 7, 2025, to provide comment on Information requests directed to Indigenous Governments and organizations.  

 Response from Tulita Working Groups to MVEIRB-8 about routing.

PKFN's answer to the Review Board's IRs regarding routing issued to Indigenous parties in December 2024. 

The Review Board hired an expert advisor to advise on geotechnical issues. His resume is available in PR302 Notice of Proceeding - retention of expert advisor_2024_Oswell.

Some of the information requests submitted on the Online Review System on January 17, 2025 were updated during the week of January 20, 2025.

This letter accompanies Round 2 of information requests issued by the Review Board to GNWT on the Online Review System.

Technical sessions were held in November 2024. Outstanding questions were posted on the Online Review System in December 2024. Answers were provided by the GNWT in January 2025.

Case studies (answer to PKFN 1) are provided in a separate Registry document.

Attachments to outstanding questions and answers from the technical sessions (case studies provided by GNWT as the answer to PKFN 1)

A letter from the developer describing when they will submit the responses to outstanding questions from the technical sessions.
Note to file about the responses to the outstanding questions from the technical sessions.
Subject: Requirement for Crown Consultation and Accommodation – Anticipated Adverse Impacts from the Proposed Mackenzie Valley Highway Project to the Rights of Liidlii ́Kue First Nation
GNWT has compiled a summary of meetings that GNWT has had with communities on the proposed socio-economic mitigation strategy for the Mackenzie Valley Highway Project between May and December 2024
Notice of Proceeding regarding information requests to parties about routing. Parties have until January 30, 2025, to respond in writing to Catherine Fairbairn at cfairbairn@reviewboard.ca. Link to the Online Review System: https://new.onlinereviewsystem.ca//review/FC3124CC-28A8-EF11-88D0-6045B…
The Review Board plans to retain expert advisor Dr. Jim Oswell of Naviq Consulting Inc. His area of expertise is in infrastructure engineering on permafrost terrain. If any party has questions or concerns about the qualifications of the expert, or the potential for conflict(s) of interest or apprehension of bias, please let Review Board staff know by January 6, 2025.
Responses to information requests Fort Norman Metis Council
ORS table with comments and responses from information request round 1, submitted Oct 16, 2024. IR#12 from the Deline Got'ine Government to CIRNAC regarding Prices in Deline was updated on Oct 28, 2024. The updated response appears in blue.
Responses to information requests attachments
Responses to information requests from SRRB
Response to information request from PKFN
Responses to information requests DRC
Responses to information requests CanNor
Responses to information requests Deline Gotine Government
Responses to LKFN information requests
Responses to information requests MVRB 71-81
Responses to information requests MVRB 61-70
Response to information request 60
Response to information request 60-3
Response to information request MVRB 60-2
Response to information request MVRB 60-1
Responses to information requests MVRB 31-59
Responses to information requests MVRB #1-30
Letter from CANNOR about the IR round 1 responses. The letter provides the responses in full with links to external resources.
Supplemental filing from the GNWT with an assessment of the accelerated alternative construction schedule.
GNWT Letter to MVEIRB about its responses to IRs.
GNWT response to issues raised in Aug. 6 letter from Acho Dene Koe First Nation (PR 242).
Notice of proceeding regarding the upcoming community sessions in the Dehcho and Sahtu. Corrected to reflect the correct comment date of October 4th. Facilitators' CVs are attached.
A letter from the developer to MVEIRB indicating that it has submitted responses to LKFN IRs 2, 3, and 6-10.
Letter from Deline Renewable Resources Council to the Review Board, requesting that the Review Board hold a community session in Deline.
An updated draft workplan that includes proposed dates for the community and technical sessions. More details about the community and technical sessions will be released in future Notices of Proceeding.
CANNOR provided a cover letter with table attachment of all their IRs. This table includes references and hyperlinks that may not be present on the ORS. This document was reuploaded on August 22 to fix two copying errors in ECCC IRs 1 and 14.
Letter from Acho Dene Koe First Nation to the Review Board, following a June 18 meeting with GNWT and its consultants.
The Mackenzie Valley Review Board is offering virtual Online Review System (ORS) training in advance of the August 14th deadline for parties to submit their information requests for the Mackenzie Valley Highway project environmental assessment.
Notes from the meeting on information requests and the workplan.
Presentation slides and links for meetings about information requests and workplan on July 25 and 30, 2024.
NPMO's comment on the updated workplan and July meetings.
A letter from the GNWT with comments on the draft MVH workplan.
The Review Board will host two optional meetings to discuss information requests and the workplan.
A letter from the Review Board to accompany the information requests to the developer on the Online Review System.
This Notice of Proceeding describes the timing of upcoming information requests and asks parties to comment on the updated draft Workplan.
Developer responses to the Review Board's overarching IRs. It includes Topic 1, Construction Schedule (pdf p.1), Topic 2, Future Environmental Conditions (pdf p.6), and Topic 3, Lessons Learned Tlicho Highway (pdf p.116).
As part of its response to Review Board round 1 information request #2, the GNWT submitted this Climate Change and Health Vulnerability Assessment for the NWT.
At the request of Deline Got'ine Government (DGG), Review Board staff presented on the environmental assessment process in Deline, NT.
Letter from the developer informing the Review Board that answers to the first three overarching IRs have been submitted.
Reminder that the revised deadline for parties to submit information requests on the Online Review System for MVH has not yet been set by the Review Board.
Letter to Prime Minister Trudeau from NWT Member of Parliament requesting the federal government to prioritize the Mackenzie Valley Highway.
Hamlet of Tulita letter of support for MVH. The construction timeline proposed should be shortened.
The Northern Projects Management Office provides a response to Pehdzeh Ki First Nation's comments on the Mackenzie Valley Highway Project.
This document is the PR225 Attachment to Response-143-MVEIRB27 - Assessment of Prospective Borrow Sources 2021. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document is the Attachment to Response-140-MVEIRB24 - Mount Gaudet Access Road hydro-technical assessment 2021. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document is the Attachment to Response-134-MVEIRB18 - Renewable Resource Assessment of the Pehdzeh Ki Ndeh are of interest 2006. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document is the Attachment to Response-121-MVEIRB5 - Mackenzie Valley All-Weather Road Economic Analysis 2009. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document is the Attachment to Response-119-MVEIRB3 - Economic Study of the Mackenzie Valley All-Weather Highway 2017. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document is the Attachment to Response-54-DFO21 - Photographs of the MVWR Bridges and Arch Culverts from the public review of the Developer's Assessment Report. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document is the Attachment to Response-33-LKFN33B - MVH Sahtu South Segment Hydrotechnical Assessments 2022. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document is the Attachment to Response-33-LKFN33A - MVH Decho Segment Hydrotechnical Assessments 2021. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document contains the table of comments and recommendations from parties with responses from the developer, as well as all attachments to responses that are not stand-alone documents. It also contains the cover letter for responses from NPMO. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This document contains the cover letters and comments from ADKFN and NPMO from the public review of the DAR. Please see the Note to File - Transferred information from the public review of the Developer's Assessment Report (PR 215) for more information on how the documents were transferred from the Online Review System to the Public Registry.
This Note to File describes how the Mackenzie Valley Review Board transferred information from the Online Review System to the Public Registry for the Mackenzie Valley Highway environmental assessment. The information transferred includes comments, recommendations, answers, and attachments from the public review of the Developer's Assessment Report.
On May 8, 2024, there was for an impromptu meet and greet at the Mackenzie Valley Environmental Impact Review Board (Review Board) office with Pehdzeh Ki First Nation Chief and council, the Sahtu Member of Legislative Assembly and Review Board staff.
Support letter for Mackenzie Valley Highway, submitted by Carol A. McCauley, public member.
Support letter for Mackenzie Valley Highway, submitted by Herb McCauley, public member.
Letter from Town of Norman Wells to MVRB re support for accelerated construction of MVH.
Environment and Climate Change Canada response to the Review Boards notification letter dated March 28, 2024 (PR192), regarding S.79 of the Species at Risk Act for the Mackenzie Valley Highway Project.
Email from resident and beneficiary re. support for Mackenzie Valley Highway (MVH). Submitted to the Review Board by Todd McCauley.
Contact information for the Sahtu Secretariat Inc. (SSI) Special Projects Advisor and support the Mackenzie Valley Highway (MVH). Submitted to the Review Board by Todd McCauley.
Deadline for GNWT to respond to Review Boards overarching information request's will be extended from April 15, 2024, to June 19, 2024. Deadline for parties to submit information requests will be extended until after the GNWT responds to the Review Boards overarching information requests.
GNWT cover letter and submission of Aerial Moose Survey Report for the Mackenzie Valley Highway
Letter from the developer requesting the deadline for responding to the Review Board's first three information requests be extended to June 19, 2024.
NPMO letter to GTC (259.85 KB)
Northern Projects Management Office (NPMO) letter to the Gwich'in Tribal Council (GTC) regarding their involvement and funding for the environmental assessment of the Mackenzie Valley Highway Project.
SSI announces its efforts to support the Mackenzie Valley Highway. Submitted to the Review Board by Todd McCauley.
Meeting to discuss ECCC role in assessing aspects of climate change related the Mackenzie Valley Highway project
The Review Board will visit the Tulita District of the Sahtu Region in the week of April 22, 2024. The Government of the Northwest Territories (the developer) will also attend. The Review Board will meet with interested parties, and there will be public Meet & Greet Information Sharing sessions (in Norman Wells and Tulita), posters are attached.
Notice of Proceeding to extend the deadline for responding to comments on the Developer’s Assessment Report from March 29 to April 19, 2024.
Letter to Environment and Climate Change Canada and Fisheries and Oceans Canada regarding species at risk or of conservation concern considered during the Mackenzie Valley Highway environmental assessment.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
Lessons learned from the Tlicho All Season Road.
This cover letter describes the first three overarching IRs the Review Board requires more information about. It provides a link to the Online Review System.