Main Content
2023 Annual Report of EA measures submitted by Burgundy Diamond Mines
2023 Annual Report of EA measures submitted by Burgundy Diamond Mines
Jay Project 2022 Annual Measures Report
(496.79 KB)
Jay Project 2022 Annual Measures Report
(496.79 KB)
Letter MVRB to GNWT re measures reporting
(167.74 KB)
Letter MVRB to GNWT re measures reporting
(167.74 KB)
Letter MVRB to Dominion re measures reporting
(106.93 KB)
Letter MVRB to Dominion re measures reporting
(106.93 KB)
Measure 13-3 Report of EA
Measure 13-3 Report of EA
Measure 13-4 Report of EA
Measure 13-4 Report of EA
Dust Suppression Pilot Study Report submitted by Dominion Diamond in fulfillment of measure 6-2(a) Jay Project Report of EA
Dust Suppression Pilot Study Report submitted by Dominion Diamond in fulfillment of measure 6-2(a) Jay Project Report of EA
2018 Annual Report of Report of EA measures implementation submitted by GNWT
2018 Annual Report of Report of EA measures implementation submitted by GNWT
2018 Annual Report of Report of EA measures implementation submitted by Dominion Diamonds.
2018 Annual Report of Report of EA measures implementation submitted by Dominion Diamonds.
Review Board letter to GNWT re 2017 annual measures reporting
Review Board letter to GNWT re 2017 annual measures reporting
Letter from Review Board to Dominion Diamond re annual measures reporting
Letter from Review Board to Dominion Diamond re annual measures reporting
Part 2 of the Summary reports and posters from the Traditional Knowledge-based Caribou Monitoring and Mitigation Reporting for the Jay Project (from Measure 6-5)
Part 2 of the Summary reports and posters from the Traditional Knowledge-based Caribou Monitoring and Mitigation Reporting for the Jay Project (from Measure 6-5)
Part 1 of the Summary reports and posters from the Traditional Knowledge-based Caribou Monitoring and Mitigation Reporting for the Jay Project (from Measure 6-5)
Part 1 of the Summary reports and posters from the Traditional Knowledge-based Caribou Monitoring and Mitigation Reporting for the Jay Project (from Measure 6-5)
2017 Annual Reporting of measures implementation from Report of EA submitted by Minister GNWT
2017 Annual Reporting of measures implementation from Report of EA submitted by Minister GNWT
2017 Annual Report of measures implementation from Report of EA submitted by Dominion Diamond
2017 Annual Report of measures implementation from Report of EA submitted by Dominion Diamond
This document is submitted by GNWT in accordance with measure 13-4 from the Report of EA.
This document is submitted by GNWT in accordance with measure 13-4 from the Report of EA.
2016 SEA Implementation Report_FINAL
(1.04 MB)
2016 SEA Implementation Report_FINAL
(1.04 MB)
Women in Mining Workshop Report - measure 8-2
(993.73 KB)
Women in Mining Workshop Report - measure 8-2
(993.73 KB)
This document is submitted by GNWT in accordance with measure 13-4 from the Report of EA.
This document is submitted by GNWT in accordance with measure 13-4 from the Report of EA.
Jay Dike Review Panel Meeting - measure 4-4
(557.98 KB)
Jay Dike Review Panel Meeting - measure 4-4
(557.98 KB)
This is the 2017 Annual Report of EA measures from Dominion Diamond. It is submitted in response to measrue 13-3 from the Report of EA..
This is the 2017 Annual Report of EA measures from Dominion Diamond. It is submitted in response to measrue 13-3 from the Report of EA..
This is GNWT's response to measure 6-4, dustfall standard, from the Report of EA.
This is GNWT's response to measure 6-4, dustfall standard, from the Report of EA.
This docuemnt submitted by GNWT approves the DDEC WEMP, measure 6-1 from the REport of EA.
This docuemnt submitted by GNWT approves the DDEC WEMP, measure 6-1 from the REport of EA.
GNWT - AQEMMP Measure 6-3
(3.8 MB)
GNWT - AQEMMP Measure 6-3
(3.8 MB)
DDEC Caribou Mitigation Plan measure 6-2a
(473.53 KB)
DDEC Caribou Mitigation Plan measure 6-2a
(473.53 KB)
DDEC Traditional Knowledge Framework measure 7-1
(503.24 KB)
DDEC Traditional Knowledge Framework measure 7-1
(503.24 KB)
This is the response from Dominion Diamond to measrue 6-5 from the Jay Project Report of EA regarding a Traditioinal Knoiwledge Elders Group.
This is the response from Dominion Diamond to measrue 6-5 from the Jay Project Report of EA regarding a Traditioinal Knoiwledge Elders Group.
GNWT-ENR caribou management plan measure 6-6
(318.21 KB)
GNWT-ENR caribou management plan measure 6-6
(318.21 KB)
A report in support of GNWT's responsibilities under measure 6-2(b)
A report in support of GNWT's responsibilities under measure 6-2(b)
A report in support of GNWT's responsibilities for measure 6-2(b) regarding evaluating the effectiveness of Dominion's caribou offsetting projects.
A report in support of GNWT's responsibilities for measure 6-2(b) regarding evaluating the effectiveness of Dominion's caribou offsetting projects.
GNWT's cover letter for its response to measure 6-2(b) regarding evaluating the effectiveness of Dominion's caribou offset projects.
GNWT's cover letter for its response to measure 6-2(b) regarding evaluating the effectiveness of Dominion's caribou offset projects.
Community newsletter Fall 2017
(4.7 MB)
Community newsletter Fall 2017
(4.7 MB)
This is the Alternative Energy Concept Study submitted by Dominion Diamond in response to commitment #52 from the Jay Project Report of EA.
This is the Alternative Energy Concept Study submitted by Dominion Diamond in response to commitment #52 from the Jay Project Report of EA.
This document is an update on the status of measures from the Jay Report of EA submitted by Dominion Diamond
This document is an update on the status of measures from the Jay Report of EA submitted by Dominion Diamond
Dominion Community Newsletter 2016 Winter
(889.12 KB)
Dominion Community Newsletter 2016 Winter
(889.12 KB)
This is a submission from Dominion Diamonds regarding activities to fulfill measure 4-4 of the Report of EA.
This is a submission from Dominion Diamonds regarding activities to fulfill measure 4-4 of the Report of EA.
This is a letter to WLWB from the MVRB re clarification of text in Measure 4-4 in Appendix A of the Report of Environmental Assessment
This is a letter to WLWB from the MVRB re clarification of text in Measure 4-4 in Appendix A of the Report of Environmental Assessment
Measure 13-3 Annual Reporting-30-June-2016
(319.67 KB)
Measure 13-3 Annual Reporting-30-June-2016
(319.67 KB)
Dominion Community Newsletter 2016 Apr-May
(634.37 KB)
Dominion Community Newsletter 2016 Apr-May
(634.37 KB)
NPMO letters to Indigenous Groups
(273.58 KB)
NPMO letters to Indigenous Groups
(273.58 KB)
GNWT response letter to TG
(1.33 MB)
GNWT response letter to TG
(1.33 MB)
GNWT response letter to NSMA
(1.26 MB)
GNWT response letter to NSMA
(1.26 MB)
GNWT response letter to LKDFN
(1.98 MB)
GNWT response letter to LKDFN
(1.98 MB)
GNWT response letter to YKDFN
(1.5 MB)
GNWT response letter to YKDFN
(1.5 MB)
GNWT response letter to KIA
(1 MB)
GNWT response letter to KIA
(1 MB)
GNWT response letter to FRMC
(1.01 MB)
GNWT response letter to FRMC
(1.01 MB)
GNWT response letter to DKFN
(1.72 MB)
GNWT response letter to DKFN
(1.72 MB)
This is an email from GNWT confirming responses to Jay REA from Aboriginal governments and organizations
This is an email from GNWT confirming responses to Jay REA from Aboriginal governments and organizations
NSMA Comments_Jay_REA to NPMO
(115.38 KB)
NSMA Comments_Jay_REA to NPMO
(115.38 KB)
NSMA_Comments_Jay_REA to GNWT
(116.53 KB)
NSMA_Comments_Jay_REA to GNWT
(116.53 KB)
YKDFN Response to GNWT-GoC re Jay REA
(184.96 KB)
YKDFN Response to GNWT-GoC re Jay REA
(184.96 KB)
KIA response to GNWT-GoC re Jay Project REA
(301.7 KB)
KIA response to GNWT-GoC re Jay Project REA
(301.7 KB)
LKDFN letter to NPMO-GNWT re Jay project REA
(709.78 KB)
LKDFN letter to NPMO-GNWT re Jay project REA
(709.78 KB)
This is the presentation on Report of EA measures and suggestions given to parties by Review Board staff on March 24, 2016.
This is the presentation on Report of EA measures and suggestions given to parties by Review Board staff on March 24, 2016.
This note to file advises of a meeting between Board staff and GNWT regarding Jay project measures directed at GNWT.
This note to file advises of a meeting between Board staff and GNWT regarding Jay project measures directed at GNWT.
Invitation to presentation on Jay REA
(129.15 KB)
Invitation to presentation on Jay REA
(129.15 KB)
This is a letter to Minister McLeod regarding rectification of a clerical error in the Jay Project Report of EA.
This is a letter to Minister McLeod regarding rectification of a clerical error in the Jay Project Report of EA.
Government of the Northwest Territories and Government of Canada letters of extension to advise on the Jay project REA to Aboriginal Governments.
Government of the Northwest Territories and Government of Canada letters of extension to advise on the Jay project REA to Aboriginal Governments.
Jay Project Report of EA with clerical error to measure 13-4 rectified. In addition, errors corrected in measure 4-4 Appendix A and suggestions in Section 5 as described in 15_Aug16 letter.
Jay Project Report of EA with clerical error to measure 13-4 rectified. In addition, errors corrected in measure 4-4 Appendix A and suggestions in Section 5 as described in 15_Aug16 letter.
Letters from the Government of Canada (NPMO) requesting comments on the Jay Report of EA from Aboriginal groups.
Letters from the Government of Canada (NPMO) requesting comments on the Jay Report of EA from Aboriginal groups.
Cover letter from Chair of MVEIRB to Minister of Lands GNWT.
Cover letter from Chair of MVEIRB to Minister of Lands GNWT.
Dominion Closing submission
(660.84 KB)
Dominion Closing submission
(660.84 KB)
GNWT letter in response to Mr. Henry Zoe's question regarding participant funding
GNWT letter in response to Mr. Henry Zoe's question regarding participant funding
LKDFN Closing submission
(348.4 KB)
LKDFN Closing submission
(348.4 KB)
KIA Closing submission
(198.72 KB)
KIA Closing submission
(198.72 KB)
NSMA Closing submission
(385.94 KB)
NSMA Closing submission
(385.94 KB)
Tlicho Government Closing submission
(343.25 KB)
Tlicho Government Closing submission
(343.25 KB)
GNWT Closing submission
(721.39 KB)
GNWT Closing submission
(721.39 KB)
YKDFN Closing submission
(770.03 KB)
YKDFN Closing submission
(770.03 KB)
Jay Engagement Registry submitted by Dominion
(585.17 KB)
Jay Engagement Registry submitted by Dominion
(585.17 KB)
Canada Closing submissions EC - DFO - TC
(391.5 KB)
Canada Closing submissions EC - DFO - TC
(391.5 KB)
GNWT Undertaking #4 adequacy response
(758.9 KB)
GNWT Undertaking #4 adequacy response
(758.9 KB)
Diavik Diamond Mine Inc. Closing submission
(128.39 KB)
Diavik Diamond Mine Inc. Closing submission
(128.39 KB)
DKFN Closing submission
(790.78 KB)
DKFN Closing submission
(790.78 KB)
IEMA Closing submission
(744.45 KB)
IEMA Closing submission
(744.45 KB)
Jay Project Final Commitments Table 101415
(854.07 KB)
Jay Project Final Commitments Table 101415
(854.07 KB)
Note to file -Dominion Community Newsletter
(704.64 KB)
Note to file -Dominion Community Newsletter
(704.64 KB)
GNWT - past EA measures response table
(292.5 KB)
GNWT - past EA measures response table
(292.5 KB)
Undertaking #10 - GNWT response
(426.81 KB)
Undertaking #10 - GNWT response
(426.81 KB)
NPMO_-_GOC_comments_Commitment_Table__EC_DFO
(273.27 KB)
NPMO_-_GOC_comments_Commitment_Table__EC_DFO
(273.27 KB)
Undertaking 15 Response - EC
(353.59 KB)
Undertaking 15 Response - EC
(353.59 KB)
Notice of proceeding- closing submissions
(509.22 KB)
Notice of proceeding- closing submissions
(509.22 KB)
Hearing homework response on security from GNWT
(619.24 KB)
Hearing homework response on security from GNWT
(619.24 KB)
Review Board information request to Dominion
Review Board information request to Dominion
Undertaking 9 - IEMA Response to Undertaking #9
(523.27 KB)
Undertaking 9 - IEMA Response to Undertaking #9
(523.27 KB)
This note to file identifies homework items from the public hearings and requests responses to these questions by September 30.
This note to file identifies homework items from the public hearings and requests responses to these questions by September 30.
Tom Hoefer comments
(7.1 MB)
Tom Hoefer comments
(7.1 MB)
Note to file Updated Commitments Table 092315
(827.91 KB)
Note to file Updated Commitments Table 092315
(827.91 KB)
Cory Vanthuyne Comments
(73.28 KB)
Cory Vanthuyne Comments
(73.28 KB)
Dan Wong Comments
(31.65 KB)
Dan Wong Comments
(31.65 KB)
Undertakings from Day 3
(71.26 KB)
Undertakings from Day 3
(71.26 KB)
Undertakings from Day 2
(301.04 KB)
Undertakings from Day 2
(301.04 KB)
Review Board response to IEMA request for ruling
(313.08 KB)
Review Board response to IEMA request for ruling
(313.08 KB)
Jay Project Commitments Table 082815
(748.59 KB)
Jay Project Commitments Table 082815
(748.59 KB)
Jay Project commitments and undertakings from September 14th
Jay Project commitments and undertakings from September 14th
GNWT letter to MVEIRB re IEMA late submission
(434.13 KB)
GNWT letter to MVEIRB re IEMA late submission
(434.13 KB)
Jay Hearing Presentations Timing
(131.96 KB)
Jay Hearing Presentations Timing
(131.96 KB)
This is a letter from AANDC to MVEIRB in response to the September 3 letterr regarding past measures from EAs.
This is a letter from AANDC to MVEIRB in response to the September 3 letterr regarding past measures from EAs.
Media Info Sheet Jay Project
(384.95 KB)
Media Info Sheet Jay Project
(384.95 KB)
01_Jay_Project_Round_2_IR_Responses
(36.47 MB)
01_Jay_Project_Round_2_IR_Responses
(36.47 MB)
This is a letter from the GNWT ENR to the Review Board regarding the 2015 Bathurst Caribou Herd survey results.
This is a letter from the GNWT ENR to the Review Board regarding the 2015 Bathurst Caribou Herd survey results.
the excel file attached to the IEMA correspondence for the late submission to the record
the excel file attached to the IEMA correspondence for the late submission to the record
Late submission request by IEMA_8Sept2015
(660.47 KB)
Late submission request by IEMA_8Sept2015
(660.47 KB)
Jay Project public hearing agenda FINAL
(358.27 KB)
Jay Project public hearing agenda FINAL
(358.27 KB)
Jay Project Notice of proceeding for hearings
(487.52 KB)
Jay Project Notice of proceeding for hearings
(487.52 KB)
Letter regarding a meeting between the YKDFN and the GNWT
Letter regarding a meeting between the YKDFN and the GNWT
Letter regarding a meeting between the LKDFN and the GNWT
Letter regarding a meeting between the LKDFN and the GNWT
Letter from the GNWT to the MVIERB regarding government represenation at community hearings
Letter from the GNWT to the MVIERB regarding government represenation at community hearings
Letter from the GNWT to the MVEIRB regarding government commitments
Letter from the GNWT to the MVEIRB regarding government commitments
Dominion Diamond's presentation for Day 3 of the Yellowknife public hearings
Dominion Diamond's presentation for Day 3 of the Yellowknife public hearings
Dominion Diamond's presentation for day 2 of the Yellowknife public hearing
Dominion Diamond's presentation for day 2 of the Yellowknife public hearing
Dominion Diamond's presentation for Day 1 of the Yellowknife public hearings
Dominion Diamond's presentation for Day 1 of the Yellowknife public hearings
Dominion Diamond's presentation for community hearings in Behchoko, Lutsel K'e and Kugluktuk
Dominion Diamond's presentation for community hearings in Behchoko, Lutsel K'e and Kugluktuk
This document is submitted by the GNWT.
This document is submitted by the GNWT.
This document is submitted by the GNWT.
This document is submitted by the GNWT.
This document is submitted by the WRRB.
This document is submitted by the WRRB.
This document is submitted by the WRRB.
This document is submitted by the WRRB.
This document is submitted by the WRRB.
This document is submitted by the WRRB.
Caribou Gathering Report FINAL 13-07-24
(1.63 MB)
Caribou Gathering Report FINAL 13-07-24
(1.63 MB)
KIA community hearing presentation - Sept 21
(193.54 KB)
KIA community hearing presentation - Sept 21
(193.54 KB)
YKDFN_TKReport_Response_28Aug2015_2
(282.26 KB)
YKDFN_TKReport_Response_28Aug2015_2
(282.26 KB)
Letter from the GNWT regarding the YKDFN traditional knowledge report
Letter from the GNWT regarding the YKDFN traditional knowledge report
explanation of the process for the late submission of community presentations by KIA and LKDFN
explanation of the process for the late submission of community presentations by KIA and LKDFN
description of the rules of procedure for submitting new evidence prior to the public hearing
description of the rules of procedure for submitting new evidence prior to the public hearing
Letter to GN re Kugluktuk community hearing
(994.57 KB)
Letter to GN re Kugluktuk community hearing
(994.57 KB)
The GNWT and NSMA met on August 17 and 20, 2015. This document includes the meeting minutes and a report titled, North Slave Metis Alliance Socio-Economic Baselne Report.
The GNWT and NSMA met on August 17 and 20, 2015. This document includes the meeting minutes and a report titled, North Slave Metis Alliance Socio-Economic Baselne Report.
NIRB Letter to MVEIRB Re Request for Cooperation
(150.67 KB)
NIRB Letter to MVEIRB Re Request for Cooperation
(150.67 KB)
This document is submitted by the GNWT.
This document is submitted by the GNWT.
Letter to NIRB re Cooperation
(621.47 KB)
Letter to NIRB re Cooperation
(621.47 KB)
YKDFN Traditional Knowledge presentation
(18.53 MB)
YKDFN Traditional Knowledge presentation
(18.53 MB)
YKDFN Jay Hearing Presentation - Water
(393.63 KB)
YKDFN Jay Hearing Presentation - Water
(393.63 KB)
YKDFN Jay Hearing Presentation - Caribou
(358.76 KB)
YKDFN Jay Hearing Presentation - Caribou
(358.76 KB)
NSMA Presentation Outline
(301.66 KB)
NSMA Presentation Outline
(301.66 KB)
NSMA Presentation cover letter
(257.59 KB)
NSMA Presentation cover letter
(257.59 KB)
IEMA Presentation--Water and Fish
(871.13 KB)
IEMA Presentation--Water and Fish
(871.13 KB)
IEMA Presentation--Caribou
(833.31 KB)
IEMA Presentation--Caribou
(833.31 KB)
Tlicho Presentation Caribou
(7.69 MB)
Tlicho Presentation Caribou
(7.69 MB)
TC Presentation
(375.97 KB)
TC Presentation
(375.97 KB)
EC presentation
(1.25 MB)
EC presentation
(1.25 MB)
DFO Presentation
(2.63 MB)
DFO Presentation
(2.63 MB)
This is a letter to GNWT requesting up to date information on the Bathurst caribou herd.
This is a letter to GNWT requesting up to date information on the Bathurst caribou herd.
GNWT hearing presentation cover letter
(478.24 KB)
GNWT hearing presentation cover letter
(478.24 KB)
GNWT AQ socio ec presentation Sept 14
(802.4 KB)
GNWT AQ socio ec presentation Sept 14
(802.4 KB)
DKFN presentation
(802.73 KB)
DKFN presentation
(802.73 KB)
LKDFN Presentation
(1.04 MB)
LKDFN Presentation
(1.04 MB)
This note accepts the YKDFN TK Report for the public record and asks parties and the developer to comment with a due date of August 28
This note accepts the YKDFN TK Report for the public record and asks parties and the developer to comment with a due date of August 28
DDMI Presentation - Water
(194.22 KB)
DDMI Presentation - Water
(194.22 KB)
DDMI Presentation - Caribou
(185.88 KB)
DDMI Presentation - Caribou
(185.88 KB)
This document is submitted to the Review Board by the Yellowknives Dene First Nation.
This document is submitted to the Review Board by the Yellowknives Dene First Nation.
this is a response email from GNWT re the barren ground caribou survey
this is a response email from GNWT re the barren ground caribou survey
This note asks parties if they have concerns with the acceptance of a traditinal knowledge report for the MVEIRB public record.
This note asks parties if they have concerns with the acceptance of a traditinal knowledge report for the MVEIRB public record.
This is an email copied to the Review Board regarding the barren ground caribou survey.
This is an email copied to the Review Board regarding the barren ground caribou survey.
YKDFN_TechReport_Response from Dominion
(161.22 KB)
YKDFN_TechReport_Response from Dominion
(161.22 KB)
TC_TechReport_Response from Dominion
(58.85 KB)
TC_TechReport_Response from Dominion
(58.85 KB)
Tlicho_TechReport_Response from Dominion
(261.72 KB)
Tlicho_TechReport_Response from Dominion
(261.72 KB)
NSMA_TechReport_Response from Dominion
(94.44 KB)
NSMA_TechReport_Response from Dominion
(94.44 KB)
LKDFN_TechReport_Response from Dominion
(195.92 KB)
LKDFN_TechReport_Response from Dominion
(195.92 KB)
IEMA_TechReport_Response from Dominion
(191.3 KB)
IEMA_TechReport_Response from Dominion
(191.3 KB)
GNWT_TechReport_Response from Dominion
(150.62 KB)
GNWT_TechReport_Response from Dominion
(150.62 KB)
EC_TechReport_Response from Dominion
(145.17 KB)
EC_TechReport_Response from Dominion
(145.17 KB)
DKFN_TechReport_Response from Dominion
(77.56 KB)
DKFN_TechReport_Response from Dominion
(77.56 KB)
DFO_TechReport_Response from Dominion
(138.92 KB)
DFO_TechReport_Response from Dominion
(138.92 KB)
DDMI_TechReport_Response from Dominion
(111.1 KB)
DDMI_TechReport_Response from Dominion
(111.1 KB)
This is an email regarding the timing of the public comment period portion of the Jay Project hearings in Yellowknife.
This is an email regarding the timing of the public comment period portion of the Jay Project hearings in Yellowknife.
This is a reference for the NSMA technical report.
This is a reference for the NSMA technical report.
Comments from Government of Canada on the draft July 9 commitments table.
Comments from Government of Canada on the draft July 9 commitments table.
Dominion Community Newsletter 2015 June-July
(515.15 KB)
Dominion Community Newsletter 2015 June-July
(515.15 KB)
Letter to parties re DKFN late submission
(562.16 KB)
Letter to parties re DKFN late submission
(562.16 KB)
Jay Hearing Questions planning table
(65.79 KB)
Jay Hearing Questions planning table
(65.79 KB)
Second draft of the Jay project public hearing agendas
Second draft of the Jay project public hearing agendas
Jay Project Pre-hearing_conference_summary
(158.18 KB)
Jay Project Pre-hearing_conference_summary
(158.18 KB)
Letter from the GNWT to MVEIRB regarding commitments table
Letter from the GNWT to MVEIRB regarding commitments table
Air Quality Workshop Minutes- July 20, 2015.
Air Quality Workshop Minutes- July 20, 2015.
DKFN Technical Report
DKFN Technical Report
Jay Project - upcoming due dates
(317.22 KB)
Jay Project - upcoming due dates
(317.22 KB)
Temporary change of Review Board staff contact
(302.35 KB)
Temporary change of Review Board staff contact
(302.35 KB)
Jay_Project_Water_Model_Inputs_and_Outputs
(444.15 KB)
Jay_Project_Water_Model_Inputs_and_Outputs
(444.15 KB)
Cumulative Effects presentation Mar 2013
(2.13 MB)
Cumulative Effects presentation Mar 2013
(2.13 MB)
Tlicho Tech Report reference TK report
(2.68 MB)
Tlicho Tech Report reference TK report
(2.68 MB)
Tlicho Government Technical Report
(1.19 MB)
Tlicho Government Technical Report
(1.19 MB)
NSMA Tech Report reference EIR0607-001_GK_NSMA
(716.51 KB)
NSMA Tech Report reference EIR0607-001_GK_NSMA
(716.51 KB)
NSMA Tech Report reference ELLIS (2005)
(396.69 KB)
NSMA Tech Report reference ELLIS (2005)
(396.69 KB)
NSMA Tech Report reference GAGNON (2009)
(978.93 KB)
NSMA Tech Report reference GAGNON (2009)
(978.93 KB)
NSMA Tech Report reference Gibson 2008
(1.56 MB)
NSMA Tech Report reference Gibson 2008
(1.56 MB)
NSMA Tech Report reference Gwynneth Jones
(789.28 KB)
NSMA Tech Report reference Gwynneth Jones
(789.28 KB)
NSMA Tech Report reference Lindsay A Bell
(35.82 MB)
NSMA Tech Report reference Lindsay A Bell
(35.82 MB)
NSMA Tech Report reference USHER (2000)
(51.58 KB)
NSMA Tech Report reference USHER (2000)
(51.58 KB)
NSMA Technical Report NSMA
(16.91 MB)
NSMA Technical Report NSMA
(16.91 MB)
LKDFN Technical Report
(743.33 KB)
LKDFN Technical Report
(743.33 KB)
YKDFN Technical Report
(736.92 KB)
YKDFN Technical Report
(736.92 KB)
DDMI - Technical Report
(151.32 KB)
DDMI - Technical Report
(151.32 KB)
Jay_Project_WEMP_and_CRMP July 31, 2015
(4.56 MB)
Jay_Project_WEMP_and_CRMP July 31, 2015
(4.56 MB)
Dominion cover letter July 31, 2015 submissions
(306.81 KB)
Dominion cover letter July 31, 2015 submissions
(306.81 KB)
GNWT Technical Report July 31 2015
(741.21 KB)
GNWT Technical Report July 31 2015
(741.21 KB)
GNWT cover letter for Technical Report
(306.89 KB)
GNWT cover letter for Technical Report
(306.89 KB)
Draft public hearing agenda for discussion at the August 5 pre-hearing conference.
Draft public hearing agenda for discussion at the August 5 pre-hearing conference.
IEMA Tech Report reference Nellemann_et_al
(263.52 KB)
IEMA Tech Report reference Nellemann_et_al
(263.52 KB)
IEMA Tech Report reference Graeb et al. 2011
(176.51 KB)
IEMA Tech Report reference Graeb et al. 2011
(176.51 KB)
IEMA Tech Report reference Fudge and Bodaly 1984
(583.68 KB)
IEMA Tech Report reference Fudge and Bodaly 1984
(583.68 KB)
IEMA Technical Report
(880.57 KB)
IEMA Technical Report
(880.57 KB)
This report is submitted by GNWT in support of its Technical Report.
This report is submitted by GNWT in support of its Technical Report.
This document is submitted by GNWT iin support of its technical report.
This document is submitted by GNWT iin support of its technical report.
Due date for technical reports extended to August 3. Responses from Dominion extended to August 17.
Due date for technical reports extended to August 3. Responses from Dominion extended to August 17.
This is a letter from LKDFN requesting an extension to the technical report due date.
This is a letter from LKDFN requesting an extension to the technical report due date.
This is a request from NSMA to the Review Baord re a due date extension for technical reports to August 3.
This is a request from NSMA to the Review Baord re a due date extension for technical reports to August 3.
This is a Dominion presentation from the July 20 workshop.
This is a Dominion presentation from the July 20 workshop.
Presentation from Air Quality workshop.
Presentation from Air Quality workshop.
Email from GNWT regarding threshold triggers shown at July 20 Air Quality workshop.
Email from GNWT regarding threshold triggers shown at July 20 Air Quality workshop.
This is a request for party status from the KIA.
This is a request for party status from the KIA.
ERM Rescan (ERM Rescan Environmental Ltd.). 2014. Water Balance and Water Quality Modelling related to the Jay Project. Yellowknife, NT, Canada: ERM Rescan. DAR reference document.
ERM Rescan (ERM Rescan Environmental Ltd.). 2014. Water Balance and Water Quality Modelling related to the Jay Project. Yellowknife, NT, Canada: ERM Rescan. DAR reference document.
This document contains information request responses and engagement plans submitted by Dominion.
This document contains information request responses and engagement plans submitted by Dominion.
This document is submitted by GNWT in support of its Technical Report.
This document is submitted by GNWT in support of its Technical Report.
Agenda - Pre-hearing conference - August 5
(168.5 KB)
Agenda - Pre-hearing conference - August 5
(168.5 KB)
Work Plan - Jay Project - updated July 22, 2015
(373.81 KB)
Work Plan - Jay Project - updated July 22, 2015
(373.81 KB)
This is a letter from the AANDC Minister re KIA request for a review by the Nunavut Impact Review Board.
This is a letter from the AANDC Minister re KIA request for a review by the Nunavut Impact Review Board.
Hydrogeology presentation - 20 July 2015
(494.94 KB)
Hydrogeology presentation - 20 July 2015
(494.94 KB)
This document is submitted by GNWT in support of its Technical Report.
This document is submitted by GNWT in support of its Technical Report.
This document is submitted by GNWT in support of its Technical Report.
This document is submitted by GNWT in support of its Technical Report.
This document is submitted by GNWT in support of its Technical Report.
This document is submitted by GNWT in support of its Technical Report.
This is the agenda for the Jay Project Air Quality Management Plan workshop, July 20, 2015.
This is the agenda for the Jay Project Air Quality Management Plan workshop, July 20, 2015.
This is a letter from the Review Board to Dominion Diamond re a technical session follow-up on industrial uses of water.
This is a letter from the Review Board to Dominion Diamond re a technical session follow-up on industrial uses of water.
This is an email from Diavik to the Review Board regarding assessment endpoints.
This is an email from Diavik to the Review Board regarding assessment endpoints.
email from Review Board staff to Dominion requesting a summary of the water balance data presented to date
email from Review Board staff to Dominion requesting a summary of the water balance data presented to date
This is a presentation on hydrodynamic modelling from Dominion shown at its workshop on July 6.
This is a presentation on hydrodynamic modelling from Dominion shown at its workshop on July 6.
This is a presentation from Dominion shown at its July 6 workshop on water quality modelling.
This is a presentation from Dominion shown at its July 6 workshop on water quality modelling.
This is a letter from Dominion describing its engagement with GNWT on water quality modelling.
This is a letter from Dominion describing its engagement with GNWT on water quality modelling.
Jay Project Koala Watershed Model July 10, 2015
(841.92 KB)
Jay Project Koala Watershed Model July 10, 2015
(841.92 KB)
Document transferred from ORS IR2 - GNWT attachment
Document transferred from ORS IR2 - GNWT attachment
Document transferred from ORS - GNWT attachment
Document transferred from ORS - GNWT attachment
Documents transferred from ORS IR2 - attachments
Documents transferred from ORS IR2 - attachments
Document transferred from ORS IR2 attachment
Document transferred from ORS IR2 attachment
ZOI Draft Guidance Document 10Mar15
(1.9 MB)
ZOI Draft Guidance Document 10Mar15
(1.9 MB)
document transferred from ORS IR2 - GNWT attachment
document transferred from ORS IR2 - GNWT attachment
document transferred from ORS - GNWT attachment
document transferred from ORS - GNWT attachment
document transferred from ORS IRS - GNWT attachment
document transferred from ORS IRS - GNWT attachment
document transferred from ORS for IR2, EC attachment
document transferred from ORS for IR2, EC attachment
Documents transferred from the ORS - IR2 phase
Documents transferred from the ORS - IR2 phase
Management plan workshop minutes from June 26.
Management plan workshop minutes from June 26.
Workshop minutes from the June 25 WEMP and Caribou Roads Mitigation Plan workshop.
Workshop minutes from the June 25 WEMP and Caribou Roads Mitigation Plan workshop.
This is the updated list of commitments for the Jay Project since submission of the DAR.
This is the updated list of commitments for the Jay Project since submission of the DAR.
Technical Report instructions - Jay Project
(560.6 KB)
Technical Report instructions - Jay Project
(560.6 KB)
This is joint a letter from Dominion Diamond and GNWT to the Review Board regarding the Socio-Economic Agreement.
This is joint a letter from Dominion Diamond and GNWT to the Review Board regarding the Socio-Economic Agreement.
GNWT round two IR responses
(208.22 KB)
GNWT round two IR responses
(208.22 KB)
GNWT round 2 IR responses - cover letter
(517.34 KB)
GNWT round 2 IR responses - cover letter
(517.34 KB)
DAR-GNWT-IR2-11(Supporting Excel File)
(315.19 KB)
DAR-GNWT-IR2-11(Supporting Excel File)
(315.19 KB)
04_Management_Plan_Worshop_Outcome_Letter
(152.04 KB)
04_Management_Plan_Worshop_Outcome_Letter
(152.04 KB)
IR2 responses document from Dominion Diamond
IR2 responses document from Dominion Diamond
IR2 responses document from Dominion Diamond
IR2 responses document from Dominion Diamond
01_Jay_Project_Round_2_IR_Responses
(36.47 MB)
01_Jay_Project_Round_2_IR_Responses
(36.47 MB)
Note to file - intervener status for Jay Project
(300.45 KB)
Note to file - intervener status for Jay Project
(300.45 KB)
AEMP Conceptual Design presentation_26June2015
(475.67 KB)
AEMP Conceptual Design presentation_26June2015
(475.67 KB)
Conceptual_AQEMMP_presentation_26June2015
(159.05 KB)
Conceptual_AQEMMP_presentation_26June2015
(159.05 KB)
WEMP and CRMP Workshop Presentations-25June2015
(1002.48 KB)
WEMP and CRMP Workshop Presentations-25June2015
(1002.48 KB)
Final agendas for Management Plan workshops, June 25 and 26.
Final agendas for Management Plan workshops, June 25 and 26.
W2013D0006 - Ekati Lynx - Caribou Crossings Plan - Wek'eezhii Land and Water Board Directive and Reasons for Decision - Apr 27_15
W2013D0006 - Ekati Lynx - Caribou Crossings Plan - Wek'eezhii Land and Water Board Directive and Reasons for Decision - Apr 27_15
W2013D0006 - Ekati Lynx - Caribou Crossings Plan - Lynx Access Road - Design and Locations - Mar 20_15
W2013D0006 - Ekati Lynx - Caribou Crossings Plan - Lynx Access Road - Design and Locations - Mar 20_15
IR2 responses from CanNor and DFO to MVRB
(226.9 KB)
IR2 responses from CanNor and DFO to MVRB
(226.9 KB)
IR2 responses from DFO to MVRB
(52.52 KB)
IR2 responses from DFO to MVRB
(52.52 KB)
Jay Project public hearing dates September 2015
(318.22 KB)
Jay Project public hearing dates September 2015
(318.22 KB)
Minutes from Wildlife Road Mitigation Plan workshop - May 22, 2015
Minutes from Wildlife Road Mitigation Plan workshop - May 22, 2015
Interim Closure and Reclamation Plan as referenced in DAR.
Interim Closure and Reclamation Plan as referenced in DAR.
Dominion Community Newsletter 2015 April-May
(551.07 KB)
Dominion Community Newsletter 2015 April-May
(551.07 KB)
This is the Caribou Road Mitigation Plan, Jay Project version 2, June 2015
This is the Caribou Road Mitigation Plan, Jay Project version 2, June 2015
Agenda WEMP and CRMP Workshop June 25 2015 DRAFT
(324.01 KB)
Agenda WEMP and CRMP Workshop June 25 2015 DRAFT
(324.01 KB)
Management Plan Workshop agenda
Management Plan Workshop agenda
This document is transferred from the WLWB public registry, Ekati Water Licence W2012L2-0001, as it is relevant to the Jay Project.
This document is transferred from the WLWB public registry, Ekati Water Licence W2012L2-0001, as it is relevant to the Jay Project.
This note to file lists second round IRs directed to parties other than the developer
This note to file lists second round IRs directed to parties other than the developer
IEMA cover letter on Jay second round IRs
(92.44 KB)
IEMA cover letter on Jay second round IRs
(92.44 KB)
06_Ekati_WROMP_Conceptual_Jay_Amendment
(1.94 MB)
06_Ekati_WROMP_Conceptual_Jay_Amendment
(1.94 MB)
05_Ekati_WPKMP_Conceptual_Jay_Amendment
(175.18 KB)
05_Ekati_WPKMP_Conceptual_Jay_Amendment
(175.18 KB)
04_Draft_Conceptual_WEMP_Jay
(1.61 MB)
04_Draft_Conceptual_WEMP_Jay
(1.61 MB)
03_Draft_Conceptual_AQEMMP_Jay
(3.25 MB)
03_Draft_Conceptual_AQEMMP_Jay
(3.25 MB)
02_Draft_Conceptual_AEMP_Design_Plan_Jay
(3.71 MB)
02_Draft_Conceptual_AEMP_Design_Plan_Jay
(3.71 MB)
01_Cover_Letter_Management_Plans
(120.42 KB)
01_Cover_Letter_Management_Plans
(120.42 KB)
Meeting notes from the Wildlife Road Mitigation Plan Workshop held May 22.
Meeting notes from the Wildlife Road Mitigation Plan Workshop held May 22.
This correspondence documents meetings between GNWT and Dominion Diamond on hydrogeology modeling.
This correspondence documents meetings between GNWT and Dominion Diamond on hydrogeology modeling.
This document contains air quality follow-up responses from the May 7 regulatory meeting.
This document contains air quality follow-up responses from the May 7 regulatory meeting.
Air Quality Meeting Notes - May 7, 2015
(48.16 KB)
Air Quality Meeting Notes - May 7, 2015
(48.16 KB)
Greenhouse Gas Strategy 2011-2015
(3.06 MB)
Greenhouse Gas Strategy 2011-2015
(3.06 MB)
This is the cover letter from GNWT ITI for the Community and Diamonds Report.
This is the cover letter from GNWT ITI for the Community and Diamonds Report.
This is the Community and Diamonds annual report submitted by GNWT.
This is the Community and Diamonds annual report submitted by GNWT.
Ekati Mine socio-economic agreement
(164.98 KB)
Ekati Mine socio-economic agreement
(164.98 KB)
This is the agenda for the Wildlife Road Mitigation Plan Workshop.
This is the agenda for the Wildlife Road Mitigation Plan Workshop.
BHP Environmental Agreement Implementation Protocol submitted by GNWT.
BHP Environmental Agreement Implementation Protocol submitted by GNWT.
This is the Environmental Agreement between Canada, GNWT and BHP Diamonds Inc. 1997 with 2003 Addendum. It is submitted by GNWT.
This is the Environmental Agreement between Canada, GNWT and BHP Diamonds Inc. 1997 with 2003 Addendum. It is submitted by GNWT.
Teleconference between Review Baord staff and Dominion on document submissions and next steps in the EA.
Teleconference between Review Baord staff and Dominion on document submissions and next steps in the EA.
Jay Project Commitments Table (draft) 15-05-2015
(475.77 KB)
Jay Project Commitments Table (draft) 15-05-2015
(475.77 KB)
This is the CCME CWS for Mercury submitted by GNWT. It was referenced as a waste incineration standard.
This is the CCME CWS for Mercury submitted by GNWT. It was referenced as a waste incineration standard.
This is the CCME CWS for Dioxins and Furans submitted by GNWT. It was referenced for waste incineration standards and frequency of stack testing at the technical session.
This is the CCME CWS for Dioxins and Furans submitted by GNWT. It was referenced for waste incineration standards and frequency of stack testing at the technical session.
This is the Snap Lake AQEMMP submitted by GNWT. It was referenced as a template for Dominion to use to develop a similar adaptive management framework for air emissions.
This is the Snap Lake AQEMMP submitted by GNWT. It was referenced as a template for Dominion to use to develop a similar adaptive management framework for air emissions.
NIRB letter to Minister re consent required for transboundary review of Jay Project.
NIRB letter to Minister re consent required for transboundary review of Jay Project.
KIA Letter to NIRB Re NLCA 12 11 1 transboundary review request for Jay Project
KIA Letter to NIRB Re NLCA 12 11 1 transboundary review request for Jay Project
Note to file - second round information requests
(358.36 KB)
Note to file - second round information requests
(358.36 KB)
Tech session undertaking submitted by Dominion.
Tech session undertaking submitted by Dominion.
Tech session undertaking submitted by Dominion.
Tech session undertaking submitted by Dominion.
Jay Wildlife Road Mitigation Plan_draft
(400.67 KB)
Jay Wildlife Road Mitigation Plan_draft
(400.67 KB)
Undertakings from technical session submitted by Dominion.
Undertakings from technical session submitted by Dominion.
Undertaking #17 from technical session, response from ENR, GNWT
Undertaking #17 from technical session, response from ENR, GNWT
Tech Session Undertaking #23 - NPMO response
(32.45 KB)
Tech Session Undertaking #23 - NPMO response
(32.45 KB)
Workplan - Jay Project revised May 2015
(376.26 KB)
Workplan - Jay Project revised May 2015
(376.26 KB)
GNWT CEAMM Framework 23 Apr 2015
(349.79 KB)
GNWT CEAMM Framework 23 Apr 2015
(349.79 KB)
GNWT letter to MVEIRB re CEAMMF
(443.69 KB)
GNWT letter to MVEIRB re CEAMMF
(443.69 KB)
This is a letter from GNWT to the MVEIRB regarding the Ekati Diamond Mine Environmental Agreement and applicability to the Jay Project.
This is a letter from GNWT to the MVEIRB regarding the Ekati Diamond Mine Environmental Agreement and applicability to the Jay Project.
Not to File on Dominion and board staff teleconference.
Not to File on Dominion and board staff teleconference.
Tech session homework #23 - shoal habitat
(45.72 KB)
Tech session homework #23 - shoal habitat
(45.72 KB)
Technical session homework #20 submitted by Dominion.
Technical session homework #20 submitted by Dominion.
Management Plan list with submission dates
(79.12 KB)
Management Plan list with submission dates
(79.12 KB)
GNWT-Dominion meeting summary April 22, 2015
(97.06 KB)
GNWT-Dominion meeting summary April 22, 2015
(97.06 KB)
Updated commitments list with minor modification to Undertaking #17
Updated commitments list with minor modification to Undertaking #17
Combined commitments list April 20-24, 2015.
Combined commitments list April 20-24, 2015.
This is a map prepared by the Review Board and was shown during the technical sessions on April 21, 2015.
This is a map prepared by the Review Board and was shown during the technical sessions on April 21, 2015.
Commitments table
Commitments table
List of homeowrk, commitments and undertakings from April 22 Jay technical session.
List of homeowrk, commitments and undertakings from April 22 Jay technical session.
IEMA 2014 workshop presentation on dust supression. Submitted in response to request during technical session April 21.
IEMA 2014 workshop presentation on dust supression. Submitted in response to request during technical session April 21.
Tech session, homeowrk, commitments and undertakings
Tech session, homeowrk, commitments and undertakings
Commitments and homework from April 20 tehcnical session.
Commitments and homework from April 20 tehcnical session.
Letter from IEMA to DDEC re: bear and camera monitoring reports
Letter from IEMA to DDEC re: bear and camera monitoring reports
USE THIS FOR TECH SESSION - Excel table with Jay IRs from February 23 and responses from April 2015.
USE THIS FOR TECH SESSION - Excel table with Jay IRs from February 23 and responses from April 2015.
This is the Diavik A21 Dike 2014 Design Report Update submitted by Dominion in respoinse to MVEIRB-IR-109 - April 10, 2015
This is the Diavik A21 Dike 2014 Design Report Update submitted by Dominion in respoinse to MVEIRB-IR-109 - April 10, 2015
This is a revised agenda. Small changes have been made within agenda topics. Major topiecs for each day arre the same.
This is a revised agenda. Small changes have been made within agenda topics. Major topiecs for each day arre the same.
Dominion responses to Apr10 Board IRs
(197.19 KB)
Dominion responses to Apr10 Board IRs
(197.19 KB)
This is a note to file regarding Board staff, Kate Mansfield
This is a note to file regarding Board staff, Kate Mansfield
Review Board Geochem advisor CV
(105.43 KB)
Review Board Geochem advisor CV
(105.43 KB)
W Klassen Resume - Technical Session Facilitator
(185.86 KB)
W Klassen Resume - Technical Session Facilitator
(185.86 KB)
08_Technical_Session-Air_Quality
(1.36 MB)
08_Technical_Session-Air_Quality
(1.36 MB)
07_Technical_Session-Socio-Economics
(2.52 MB)
07_Technical_Session-Socio-Economics
(2.52 MB)
This is a presentation for the technical session.
This is a presentation for the technical session.
05_Technical_Session-Hydrology_WQ
(3.14 MB)
05_Technical_Session-Hydrology_WQ
(3.14 MB)
04_Technical_Session-Hydrogeology
(1.74 MB)
04_Technical_Session-Hydrogeology
(1.74 MB)
03_Technical_Session-Caribou
(973.23 KB)
03_Technical_Session-Caribou
(973.23 KB)
02_Technical_Session-Wildlife
(503.98 KB)
02_Technical_Session-Wildlife
(503.98 KB)
01_Technical_Session-Project_Description
(5.78 MB)
01_Technical_Session-Project_Description
(5.78 MB)
This Note to File provides information for the technical session incluing hyperlinks for the agenda and
This Note to File provides information for the technical session incluing hyperlinks for the agenda and
JayIRs_with responses_8Apr2015_Registry
(439.23 KB)
JayIRs_with responses_8Apr2015_Registry
(439.23 KB)
This is the presentation from the Cultural Workshop Report, Appendix A.
This is the presentation from the Cultural Workshop Report, Appendix A.
Cultural Workshop Report
(216.2 KB)
Cultural Workshop Report
(216.2 KB)
Bio for Gaeleen MacPherson with Dominion Diamond.
Bio for Gaeleen MacPherson with Dominion Diamond.
This Note to File advises parties on responses to IRs and scope of development questions.
This Note to File advises parties on responses to IRs and scope of development questions.
Document transfer WLWB registry to MVRB registry
(306.68 KB)
Document transfer WLWB registry to MVRB registry
(306.68 KB)
This is a response letter from the Yellowknives Dene to a reminder regarding comments on the Ekati Engagement Plan.
This is a response letter from the Yellowknives Dene to a reminder regarding comments on the Ekati Engagement Plan.
Bios and CVs of Dominion employes and consultants participating in the technical sessions.
Bios and CVs of Dominion employes and consultants participating in the technical sessions.
Additional Board information requests to Dominion.
Additional Board information requests to Dominion.
IR responses TOC with hyperlinks
(93.34 KB)
IR responses TOC with hyperlinks
(93.34 KB)
Appendix G Diavik Stakeholder Engagement IR responses Dominion 7 April 2015
Appendix G Diavik Stakeholder Engagement IR responses Dominion 7 April 2015
Baseline_water and sediment quality_2014
(9.29 MB)
Baseline_water and sediment quality_2014
(9.29 MB)
Baseline_Plankton_Report_2014
(4.12 MB)
Baseline_Plankton_Report_2014
(4.12 MB)
Baseline_Hydrology_2014
(38.57 MB)
Baseline_Hydrology_2014
(38.57 MB)
Baseline_Fish_and_Fish_Habitat
(31.16 MB)
Baseline_Fish_and_Fish_Habitat
(31.16 MB)
App F Power Supply IR responses Dominion
(100.45 KB)
App F Power Supply IR responses Dominion
(100.45 KB)
Baseline_Benthic_Invertebrates
(9.26 MB)
Baseline_Benthic_Invertebrates
(9.26 MB)
Baseline_Aquatic_Health_Memo
(3.83 MB)
Baseline_Aquatic_Health_Memo
(3.83 MB)
Appendix E Pre-feasibility Dile Design IR response from Dominion 7 April 2015
Appendix E Pre-feasibility Dile Design IR response from Dominion 7 April 2015
Appendix D Post Closure Caribou Habitat IR Responses from Dominion 7 April 2015
Appendix D Post Closure Caribou Habitat IR Responses from Dominion 7 April 2015
Apendix C Traffic Caribou IR responses from Dominion 7 April 2015
Apendix C Traffic Caribou IR responses from Dominion 7 April 2015
App B Modeling Compendium IR responses
(46.32 MB)
App B Modeling Compendium IR responses
(46.32 MB)
App A Socio-Ec Model IR responses
(568.48 KB)
App A Socio-Ec Model IR responses
(568.48 KB)
Dominion responses to IRs_7April2015
(78.91 MB)
Dominion responses to IRs_7April2015
(78.91 MB)
GNWT responses to information requests
(678.72 KB)
GNWT responses to information requests
(678.72 KB)
Federal Department responses to IRs
(524.9 KB)
Federal Department responses to IRs
(524.9 KB)
Davik Diamond Mine response to Board IR #77
Davik Diamond Mine response to Board IR #77
DKFN technical advisors - CVs
(727.69 KB)
DKFN technical advisors - CVs
(727.69 KB)
GNWT technical advisor CVs combined
(975.6 KB)
GNWT technical advisor CVs combined
(975.6 KB)
KIA technical advisors - CVs
(1.18 MB)
KIA technical advisors - CVs
(1.18 MB)
Response to IRs directed to IEMA
(242.31 KB)
Response to IRs directed to IEMA
(242.31 KB)
IEMA technical advisor - Poole CV
(470.25 KB)
IEMA technical advisor - Poole CV
(470.25 KB)
Emails from Dominion to Aboriginal groups re IRs
(148.53 KB)
Emails from Dominion to Aboriginal groups re IRs
(148.53 KB)
Technical Session Agenda
(492.65 KB)
Technical Session Agenda
(492.65 KB)
Dominion letter re Diavik Engagement
(44.95 KB)
Dominion letter re Diavik Engagement
(44.95 KB)
This Note to File requests parties to submit technical advisor CVs by April 7 prior to the technical session.
This Note to File requests parties to submit technical advisor CVs by April 7 prior to the technical session.
Information request responses from Dominion
(15.19 MB)
Information request responses from Dominion
(15.19 MB)
DRAFT Agenda for Jay Technical Sessions
(157.72 KB)
DRAFT Agenda for Jay Technical Sessions
(157.72 KB)
GNWT response to DKFN letter
(70.05 KB)
GNWT response to DKFN letter
(70.05 KB)
Follow up responses from Dominion to GNWT on questions raised at their 3 Feb 2015 meeting
Follow up responses from Dominion to GNWT on questions raised at their 3 Feb 2015 meeting
Meeting notes from Dominion's meeting with the GNWT on 3 Feb 2015
Meeting notes from Dominion's meeting with the GNWT on 3 Feb 2015
2015 Annual Work Plan
(3.72 MB)
2015 Annual Work Plan
(3.72 MB)
Note to file - Summary table of IRs
(101.17 KB)
Note to file - Summary table of IRs
(101.17 KB)
Summary of Feb2015 Jay IRs
(813.19 KB)
Summary of Feb2015 Jay IRs
(813.19 KB)
Meeting on IRs and technical session dates
(102.04 KB)
Meeting on IRs and technical session dates
(102.04 KB)
This is a list of information requests directed to parties other than the developer.
This is a list of information requests directed to parties other than the developer.
DKFN letter to MVEIRB re consultation
(2.66 MB)
DKFN letter to MVEIRB re consultation
(2.66 MB)
DDEC Aboriginal Cultural Workshop Agenda
(303.11 KB)
DDEC Aboriginal Cultural Workshop Agenda
(303.11 KB)
This is the 2013 Ekati WEMP Addendum Wildlife Camera Monitoring Report Summary
This is the 2013 Ekati WEMP Addendum Wildlife Camera Monitoring Report Summary
This is the 2012 Ekati WEMP Addendum Wildlife Camera Monitoring Summary Report
This is the 2012 Ekati WEMP Addendum Wildlife Camera Monitoring Summary Report
Te following is Rescan (ERM Rescan Environmental Services Ltd.). 2012. Ekati Diamond Mine 2012 Environmental Impact Report, prepared by Billiton Canada Inc., Yellowknife, NWT
Te following is Rescan (ERM Rescan Environmental Services Ltd.). 2012. Ekati Diamond Mine 2012 Environmental Impact Report, prepared by Billiton Canada Inc., Yellowknife, NWT
Reasons for Decision - Adequacy for Jay DAR
(596.13 KB)
Reasons for Decision - Adequacy for Jay DAR
(596.13 KB)
IR due date extended to Feb 23
(345.04 KB)
IR due date extended to Feb 23
(345.04 KB)
Letter from DKFN re IR deadline extension
(32.52 KB)
Letter from DKFN re IR deadline extension
(32.52 KB)
Letter from Tlicho Gov re IR deadline extension
(216.89 KB)
Letter from Tlicho Gov re IR deadline extension
(216.89 KB)
This is a letter from LKDFN requesting an extension to the IR due date.
This is a letter from LKDFN requesting an extension to the IR due date.
This is a letter from YKDFN requesting an extension to the IR due date.
This is a letter from YKDFN requesting an extension to the IR due date.
This Note to File informs parties that information requests have been submitted by the Review Board to Dominion along with one information request directed at parties.
This Note to File informs parties that information requests have been submitted by the Review Board to Dominion along with one information request directed at parties.
This is a reminder that information requests are due on February 16 and the Technical Sessions are confirmed for April 21-23.
This is a reminder that information requests are due on February 16 and the Technical Sessions are confirmed for April 21-23.
December Engagement Meeting Commitments
(1.83 MB)
December Engagement Meeting Commitments
(1.83 MB)
This is the Human and Health Risk Assessment Appendices Report submitted by Dominion Diamond in response to the Adequacy Review.
This is the Human and Health Risk Assessment Appendices Report submitted by Dominion Diamond in response to the Adequacy Review.
This is the Human and Health Risk Assessment Report submitted by Dominion Diamond in response to the Adequacy Review.
This is the Human and Health Risk Assessment Report submitted by Dominion Diamond in response to the Adequacy Review.
Adequacy Review Responses 02Feb2015
(286.6 KB)
Adequacy Review Responses 02Feb2015
(286.6 KB)
This is a letter from the Review Board to Dominion re Adequacy of caribou modeling.
This is a letter from the Review Board to Dominion re Adequacy of caribou modeling.
MVEIRB response to Dominion letter of Jan 22
(479.88 KB)
MVEIRB response to Dominion letter of Jan 22
(479.88 KB)
This is the Russell energy-protein model presentation shown by Don Russell at the January 19, 2015 caribou technical meeting.
This is the Russell energy-protein model presentation shown by Don Russell at the January 19, 2015 caribou technical meeting.
This is the DAR energy model presentation shown by Dominion at the January 19, 2015 caribou technical meeting.
This is the DAR energy model presentation shown by Dominion at the January 19, 2015 caribou technical meeting.
This document contains summary notes from the caribou technical meeting on January 19, 2015.
This document contains summary notes from the caribou technical meeting on January 19, 2015.
This is a letter from Dominion to the Review Board re the Jay Project timeline.
This is a letter from Dominion to the Review Board re the Jay Project timeline.
Adequacy Review responses from Dominion Vol 6 of 6 Thermal Assessment for Misery Pit Lake.
Adequacy Review responses from Dominion Vol 6 of 6 Thermal Assessment for Misery Pit Lake.
Adequacy Review responses submitted by Dominion Vol 5 of 6 Accidents and Malfunctions Risk Assessment.
Adequacy Review responses submitted by Dominion Vol 5 of 6 Accidents and Malfunctions Risk Assessment.
Adequacy Review responses from Dominion Vol 4 of 6 Lac De Gras Hydrodynamic Model updates.
Adequacy Review responses from Dominion Vol 4 of 6 Lac De Gras Hydrodynamic Model updates.
Adequacy Review responses submitted by Dominion Vol 3 of 6 Air quality assessment update.
Adequacy Review responses submitted by Dominion Vol 3 of 6 Air quality assessment update.
Adequacy Review responses Vol 2 Socio-Ec
(273.04 KB)
Adequacy Review responses Vol 2 Socio-Ec
(273.04 KB)
Adequacy Review responses Vol 1
(5.15 MB)
Adequacy Review responses Vol 1
(5.15 MB)
Rangifer volume 34, 2014 - Special Issue No. 22 White et al, submitted by an independent consultant, Don Russell.
Rangifer volume 34, 2014 - Special Issue No. 22 White et al, submitted by an independent consultant, Don Russell.
This is the energy-protein and population modeling for the Kiggavik Project (NIRB review) submitted by an independent consultant, Don Russell.
This is the energy-protein and population modeling for the Kiggavik Project (NIRB review) submitted by an independent consultant, Don Russell.
This is the CV for Don Russel who will participate in the modeling technical meeting as an independent consultant.
This is the CV for Don Russel who will participate in the modeling technical meeting as an independent consultant.
This is the agenda for a technical meeting on protein-energy modeling.
This is the agenda for a technical meeting on protein-energy modeling.
This Note to File describes the differences between an Adequacy Review and a Conformity Check.
This Note to File describes the differences between an Adequacy Review and a Conformity Check.
Information Request Phase instructions
(449.25 KB)
Information Request Phase instructions
(449.25 KB)
Work Plan - Jay Project revised Dec 2014
(372.11 KB)
Work Plan - Jay Project revised Dec 2014
(372.11 KB)
Adequacy Review responses from Dominion
(2.87 MB)
Adequacy Review responses from Dominion
(2.87 MB)
This is a letter from the GNWT to the Review Board regarding the departmental participation of the GNWT.
This is a letter from the GNWT to the Review Board regarding the departmental participation of the GNWT.
This is a letter from Dominion Diamond to the Review Board regarding timing of reponses to the Developer's Assessment Report adequacy review.
This is a letter from Dominion Diamond to the Review Board regarding timing of reponses to the Developer's Assessment Report adequacy review.
08 - DAR - REGULATOR MEETING - FISH
(4.18 MB)
08 - DAR - REGULATOR MEETING - FISH
(4.18 MB)
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
07 - DAR - REGULATOR MEETING-WQ
(2.69 MB)
07 - DAR - REGULATOR MEETING-WQ
(2.69 MB)
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
Regulator meeting Dec 11th and 12th 2014
Regulator meeting Dec 11th and 12th 2014
This is the Jay Developer's Assessment Report Addendum - Cumulative Effects including Sable Pit. It addresses item 5.1 of the Review Board's Adequacy Review.
This is the Jay Developer's Assessment Report Addendum - Cumulative Effects including Sable Pit. It addresses item 5.1 of the Review Board's Adequacy Review.
This is a letter from the Northern Projects Management Office describing the participation and status of federal departments in the Jay Project EA.
This is a letter from the Northern Projects Management Office describing the participation and status of federal departments in the Jay Project EA.
This is the cover letter for the Jay Project Factual Reports Vol 1 Proposed Dikes and Volume 2 Proposed Jay Pit Area.
This is the cover letter for the Jay Project Factual Reports Vol 1 Proposed Dikes and Volume 2 Proposed Jay Pit Area.
This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part D.
This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part D.
Jay Pit Factual Report - Volume 2, Part C
(21.93 MB)
Jay Pit Factual Report - Volume 2, Part C
(21.93 MB)
Jay Pit Factual Report - Volume 2, Part B
(21.32 MB)
Jay Pit Factual Report - Volume 2, Part B
(21.32 MB)
Jay Pit Factual Report - Volume 2, Part A
(22.98 MB)
Jay Pit Factual Report - Volume 2, Part A
(22.98 MB)
Jay Dike Factual Report - Volume 1 Part D
(16.87 MB)
Jay Dike Factual Report - Volume 1 Part D
(16.87 MB)
Jay Dike Factual Report - Volume 1 Part C
(38.54 MB)
Jay Dike Factual Report - Volume 1 Part C
(38.54 MB)
Jay Dike Factual Report - Volume 1 Part B
(38.46 MB)
Jay Dike Factual Report - Volume 1 Part B
(38.46 MB)
Jay Dike Factual Report - Volume 1 Part A
(28.84 MB)
Jay Dike Factual Report - Volume 1 Part A
(28.84 MB)
Aquatics advisor - Neil Hutchinson resume
(240.82 KB)
Aquatics advisor - Neil Hutchinson resume
(240.82 KB)
Water Quality advisor - Kathy Racher CV
(167.33 KB)
Water Quality advisor - Kathy Racher CV
(167.33 KB)
Jay DAR Adequacy Review cover letter
(410.81 KB)
Jay DAR Adequacy Review cover letter
(410.81 KB)
Jay DAR Adequacy Review
(721.04 KB)
Jay DAR Adequacy Review
(721.04 KB)
Dominion Information Sessions Dec 11-12
(252.5 KB)
Dominion Information Sessions Dec 11-12
(252.5 KB)
Caribou advisor - Anne Gunn resume
(149.23 KB)
Caribou advisor - Anne Gunn resume
(149.23 KB)
Geotech advisor CV_B Watts
(81.94 KB)
Geotech advisor CV_B Watts
(81.94 KB)
This is a response letter from Dominion Diamond to Lutsel K'e Dene First Nation regarding traditional land use and traditional knowledge reports.
This is a response letter from Dominion Diamond to Lutsel K'e Dene First Nation regarding traditional land use and traditional knowledge reports.
DAR Table of Contents with hyperlinks
(252.11 KB)
DAR Table of Contents with hyperlinks
(252.11 KB)
Note to file - DAR submission and next steps
(359.22 KB)
Note to file - DAR submission and next steps
(359.22 KB)
16B_Annex_XVI_App_B_Arky_BSA_Sites
(61.6 KB)
16B_Annex_XVI_App_B_Arky_BSA_Sites
(61.6 KB)
16A_Annex_XVI_App_A_Arky_RSA_Sites
(141.78 KB)
16A_Annex_XVI_App_A_Arky_RSA_Sites
(141.78 KB)
16_Annex XVI_Archaeology_Baseline
(5.27 MB)
16_Annex XVI_Archaeology_Baseline
(5.27 MB)
15_Annex XV_Socio_Economic_Baseline
(10.77 MB)
15_Annex XV_Socio_Economic_Baseline
(10.77 MB)
14F_Annex_XIV_App_F_FishLife
(251.61 KB)
14F_Annex_XIV_App_F_FishLife
(251.61 KB)
14E_Annex_XIV_App_E_CPUE
(317.93 KB)
14E_Annex_XIV_App_E_CPUE
(317.93 KB)
14D_Annex_XIV_App_D_Limno
(58.7 KB)
14D_Annex_XIV_App_D_Limno
(58.7 KB)
14C_Annex_XIV_App_C_HydroAcoustic
(12.72 MB)
14C_Annex_XIV_App_C_HydroAcoustic
(12.72 MB)
14B_Annex_XIV_App_B_Photos
(3.48 MB)
14B_Annex_XIV_App_B_Photos
(3.48 MB)
14A_Annex_XIV_App_A_Historical
(1.72 MB)
14A_Annex_XIV_App_A_Historical
(1.72 MB)
14_Annex XIV_Fish_and_Fish_Habitat_Baseline
(36.22 MB)
14_Annex XIV_Fish_and_Fish_Habitat_Baseline
(36.22 MB)
13F_Annex_XIII_App_F_Taxa
(132.04 KB)
13F_Annex_XIII_App_F_Taxa
(132.04 KB)
13E-2_Annex_XIII_App_E-2_EcoAnalystRefs
(53.38 KB)
13E-2_Annex_XIII_App_E-2_EcoAnalystRefs
(53.38 KB)
13E-1_Annex_XIII_App_E-1_Taxonomy
(1.24 MB)
13E-1_Annex_XIII_App_E-1_Taxonomy
(1.24 MB)
13D_Annex_XIII_App_D_FieldWaterData
(39.74 KB)
13D_Annex_XIII_App_D_FieldWaterData
(39.74 KB)
13C_Annex_XIII_App_C_QAQC
(121.55 KB)
13C_Annex_XIII_App_C_QAQC
(121.55 KB)
13B_Annex_XIII_App_B_MeshSize
(54.25 KB)
13B_Annex_XIII_App_B_MeshSize
(54.25 KB)
13A_Annex_XIII_App_A_Historical
(597.69 KB)
13A_Annex_XIII_App_A_Historical
(597.69 KB)
12B_Annex_XII_App_B_Taxonomy
(691.55 KB)
12B_Annex_XII_App_B_Taxonomy
(691.55 KB)
12A_Annex_XII_App_A_HistoricalData
(291.36 KB)
12A_Annex_XII_App_A_HistoricalData
(291.36 KB)
12_Annex XII_Plankton_Baseline
(7.97 MB)
12_Annex XII_Plankton_Baseline
(7.97 MB)
11F_Annex_XI_App_F_SedData
(139.8 KB)
11F_Annex_XI_App_F_SedData
(139.8 KB)
11E_Annex_XI_App_E_WaterData
(661.18 KB)
11E_Annex_XI_App_E_WaterData
(661.18 KB)
11D_Annex_XI_App_D_LightData
(604.81 KB)
11D_Annex_XI_App_D_LightData
(604.81 KB)
11C_Annex_XI_App_C_FieldProfiles
(706.18 KB)
11C_Annex_XI_App_C_FieldProfiles
(706.18 KB)
11B_Annex_XI_App_B_QAQC
(189.43 KB)
11B_Annex_XI_App_B_QAQC
(189.43 KB)
11A_Annex_XI_App_A_DataReview
(2.24 MB)
11A_Annex_XI_App_A_DataReview
(2.24 MB)
10F_Annex_X_App_F_ModelCalibration
(2.47 MB)
10F_Annex_X_App_F_ModelCalibration
(2.47 MB)
10E_Annex_X_App_E_FieldData
(30.56 MB)
10E_Annex_X_App_E_FieldData
(30.56 MB)
10D_Annex_X_App_D_BasinCharacter
(2.66 MB)
10D_Annex_X_App_D_BasinCharacter
(2.66 MB)
10C_Annex_X_App_C_HistoricalData
(528.67 KB)
10C_Annex_X_App_C_HistoricalData
(528.67 KB)
10B_Annex_X_App_B_ClimateData
(116.03 KB)
10B_Annex_X_App_B_ClimateData
(116.03 KB)
10A_Annex_X_App_A_AnnotatedBiblio
(196.95 KB)
10A_Annex_X_App_A_AnnotatedBiblio
(196.95 KB)
09F_Annex_IX_App_F_DiavkGroundPlot_Data
(2.66 MB)
09F_Annex_IX_App_F_DiavkGroundPlot_Data
(2.66 MB)
09E_Annex_IX_App_E_EkatiGroundPlot_Data
(876.03 KB)
09E_Annex_IX_App_E_EkatiGroundPlot_Data
(876.03 KB)
09D_Annex_IX_App_D_EkatiGroundQ_Data
(127.77 KB)
09D_Annex_IX_App_D_EkatiGroundQ_Data
(127.77 KB)
09C_Annex_IX_App_C_DiavkGroundQ_Data
(309.53 KB)
09C_Annex_IX_App_C_DiavkGroundQ_Data
(309.53 KB)
09B_Annex_IX_Hydrogeological_Testing_Memo
(16.47 MB)
09B_Annex_IX_Hydrogeological_Testing_Memo
(16.47 MB)
09A_Annex_IX_Westbay_Factual_Report
(29.59 MB)
09A_Annex_IX_Westbay_Factual_Report
(29.59 MB)
09_Annex IX_Hydrogeology_Baseline
(8.77 MB)
09_Annex IX_Hydrogeology_Baseline
(8.77 MB)
08H_Annex_VIII_App_H_Sulphide_Calculations
(110.25 KB)
08H_Annex_VIII_App_H_Sulphide_Calculations
(110.25 KB)
08E_Annex_VIII_App_E_Mineralogy
(79 KB)
08E_Annex_VIII_App_E_Mineralogy
(79 KB)
08C_Annex_VIII_App_C_Bulk_Metal_Results
(2.26 MB)
08C_Annex_VIII_App_C_Bulk_Metal_Results
(2.26 MB)
08B_Annex_VIII_App_B_Acid_Base_Accounting
(865.49 KB)
08B_Annex_VIII_App_B_Acid_Base_Accounting
(865.49 KB)
08A_Annex_VIII_App_A_Geochemical_Statistics
(976.01 KB)
08A_Annex_VIII_App_A_Geochemical_Statistics
(976.01 KB)
08_Annex VIII_Geochemistry_Baseline
(10.23 MB)
08_Annex VIII_Geochemistry_Baseline
(10.23 MB)
07_Annex VII_Wildlife_Baseline
(17.92 MB)
07_Annex VII_Wildlife_Baseline
(17.92 MB)
06C_Annex_VI_App_C_Vegetation_Photos
(561.98 KB)
06C_Annex_VI_App_C_Vegetation_Photos
(561.98 KB)
06A_Annex_VI_App_A_Plant_Species_List
(55.17 KB)
06A_Annex_VI_App_A_Plant_Species_List
(55.17 KB)
06_Annex VI_Vegetation_Baseline
(36.92 MB)
06_Annex VI_Vegetation_Baseline
(36.92 MB)
05A_Annex_V_App_A_Soils_Data
(143.71 KB)
05A_Annex_V_App_A_Soils_Data
(143.71 KB)
05_Annex V_Soils_Baseline
(10.67 MB)
05_Annex V_Soils_Baseline
(10.67 MB)
04A_Annex_IV_App_A_Thermistor_Data
(727.87 KB)
04A_Annex_IV_App_A_Thermistor_Data
(727.87 KB)
04_Annex IV_Permafrost_Baseline
(8.82 MB)
04_Annex IV_Permafrost_Baseline
(8.82 MB)
03_Annex III_Geology_Baseline
(12.5 MB)
03_Annex III_Geology_Baseline
(12.5 MB)
02A_Annex_II_App_A_Calibration_Record
(615.74 KB)
02A_Annex_II_App_A_Calibration_Record
(615.74 KB)
02_Annex II_Noise_Baseline
(6.52 MB)
02_Annex II_Noise_Baseline
(6.52 MB)
S_18_Summary_and_Conclusions
(229.95 KB)
S_18_Summary_and_Conclusions
(229.95 KB)
S_17_Cumulative_Effects_Summary
(244.77 KB)
S_17_Cumulative_Effects_Summary
(244.77 KB)
S_16_Environmental_Effects_on_Project
(2.44 MB)
S_16_Environmental_Effects_on_Project
(2.44 MB)
S_15_Culture
(2.64 MB)
S_15_Culture
(2.64 MB)
S_14A_Economic_Impact_Report
(1.38 MB)
S_14A_Economic_Impact_Report
(1.38 MB)
S_14_Socio-Economics
(6.13 MB)
S_14_Socio-Economics
(6.13 MB)
S_13D_Noise_Assess_and_Wildlife_Zones
(1.14 MB)
S_13D_Noise_Assess_and_Wildlife_Zones
(1.14 MB)
S_13B_Noise
(2.7 MB)
S_13B_Noise
(2.7 MB)
S_13A_Landscape_Metrics
(46.76 KB)
S_13A_Landscape_Metrics
(46.76 KB)
S_13_Wildlife_and_Wildlife_Habitat
(25.53 MB)
S_13_Wildlife_and_Wildlife_Habitat
(25.53 MB)
S_12B_Area_and_Configuration_of_Habitat_Types
(113.55 KB)
S_12B_Area_and_Configuration_of_Habitat_Types
(113.55 KB)
S_12_Barren-Ground_Caribou
(16.94 MB)
S_12_Barren-Ground_Caribou
(16.94 MB)
S_11B_Plant_Species_List
(79.15 KB)
S_11B_Plant_Species_List
(79.15 KB)
S_11A_Soils
(10.03 MB)
S_11A_Soils
(10.03 MB)
S_11_Vegetation
(34.56 MB)
S_11_Vegetation
(34.56 MB)
S_10_Terrain
(21.03 MB)
S_10_Terrain
(21.03 MB)
S_09C_Conceptual_AEMP_Plan
(109.64 KB)
S_09C_Conceptual_AEMP_Plan
(109.64 KB)
S_09B_Conceptual_Fish_Out_Plan
(3.58 MB)
S_09B_Conceptual_Fish_Out_Plan
(3.58 MB)
S_09A_Conceptual_Offsetting_Plan
(13.82 MB)
S_09A_Conceptual_Offsetting_Plan
(13.82 MB)
S_09_Fish_and_Fish_Habitat
(26.91 MB)
S_09_Fish_and_Fish_Habitat
(26.91 MB)
S_08H_Acute_Toxicity_for_Effluent
(1.64 MB)
S_08H_Acute_Toxicity_for_Effluent
(1.64 MB)
S_08G_Jay_and_Misery_Pit_Hydrodynamic_Modelling
(693.53 KB)
S_08G_Jay_and_Misery_Pit_Hydrodynamic_Modelling
(693.53 KB)
S_08F-5_LacDeGras_Predictions
(29.91 MB)
S_08F-5_LacDeGras_Predictions
(29.91 MB)
S_08F-4_LacduSauvage_Predictions_Part_2
(36.13 MB)
S_08F-4_LacduSauvage_Predictions_Part_2
(36.13 MB)
S_08F-4_LacduSauvage_Predictions_Part_1
(27.54 MB)
S_08F-4_LacduSauvage_Predictions_Part_1
(27.54 MB)
S_08F-3_Slipper_Lake_Predictions
(270.29 KB)
S_08F-3_Slipper_Lake_Predictions
(270.29 KB)
S_08F-2_Christine_Lake_Predictions
(50.78 KB)
S_08F-2_Christine_Lake_Predictions
(50.78 KB)
S_08F-1_Near_Field_Model
(108.22 KB)
S_08F-1_Near_Field_Model
(108.22 KB)
S_08F_LDS_LDG_Hydrodynamic_Modelling
(7.55 MB)
S_08F_LDS_LDG_Hydrodynamic_Modelling
(7.55 MB)
S_08E-1_Projected_Misery_Pit_Concentrations_Mean
(410.35 KB)
S_08E-1_Projected_Misery_Pit_Concentrations_Mean
(410.35 KB)
S_08E_Water_Quality_Modelling
(2.58 MB)
S_08E_Water_Quality_Modelling
(2.58 MB)
S_08D_Regional_Water_Balance_Model
(4.94 MB)
S_08D_Regional_Water_Balance_Model
(4.94 MB)
S_08C_Misery_Hydrogeological_Model
(1.53 MB)
S_08C_Misery_Hydrogeological_Model
(1.53 MB)
S_08B_Jay_Post_Closure_Hydrogeological_Model
(907.43 KB)
S_08B_Jay_Post_Closure_Hydrogeological_Model
(907.43 KB)
S_08A_Hydrogeological_Model
(12.39 MB)
S_08A_Hydrogeological_Model
(12.39 MB)
S_08_Water_Quality_and_Quantity
(32.36 MB)
S_08_Water_Quality_and_Quantity
(32.36 MB)
S_07C_Dispersion_Modelling_Approach
(11.52 MB)
S_07C_Dispersion_Modelling_Approach
(11.52 MB)
S_07B_Air_Emission_Details
(604.91 KB)
S_07B_Air_Emission_Details
(604.91 KB)
S_07A_Summary_Results
(471.14 KB)
S_07A_Summary_Results
(471.14 KB)
S_07_Air_Quality_Assessment
(31.62 MB)
S_07_Air_Quality_Assessment
(31.62 MB)
S_06_Environmental_Assessment_Approach
(402.74 KB)
S_06_Environmental_Assessment_Approach
(402.74 KB)
S_05_Traditional_Knowledge
(767.67 KB)
S_05_Traditional_Knowledge
(767.67 KB)
S_04B_Engagement_Registry
(203.88 KB)
S_04B_Engagement_Registry
(203.88 KB)
S_04A_Ekati_Engagement_Plan
(2.75 MB)
S_04A_Ekati_Engagement_Plan
(2.75 MB)
S_04_Community_Engagement
(871.89 KB)
S_04_Community_Engagement
(871.89 KB)
S_03A_Minewater_Management_Plan
(28.73 MB)
S_03A_Minewater_Management_Plan
(28.73 MB)
S_03_Project_Description
(25.08 MB)
S_03_Project_Description
(25.08 MB)
S_02_Project_Alternatives
(11.25 MB)
S_02_Project_Alternatives
(11.25 MB)
S_01E_Commitments_Table
(456.98 KB)
S_01E_Commitments_Table
(456.98 KB)
S_01D_Concordance_Table
(203.07 KB)
S_01D_Concordance_Table
(203.07 KB)
S_01C_Sustainable_Development_Policy
(166.89 KB)
S_01C_Sustainable_Development_Policy
(166.89 KB)
S_01B_Code_of_Ethics_and_Business_Conduct
(63.45 KB)
S_01B_Code_of_Ethics_and_Business_Conduct
(63.45 KB)
S_01A_Terms_of_Reference
(1.4 MB)
S_01A_Terms_of_Reference
(1.4 MB)
S_01_Introduction
(4.36 MB)
S_01_Introduction
(4.36 MB)
S_00_Overall_TOC
(35.82 KB)
S_00_Overall_TOC
(35.82 KB)
00_PlainLanguageSummary_5_Inuinnaqtun
(9.83 MB)
00_PlainLanguageSummary_5_Inuinnaqtun
(9.83 MB)
00_PlainLanguageSummary_4_Wiiliideh
(12.38 MB)
00_PlainLanguageSummary_4_Wiiliideh
(12.38 MB)
00_PlainLanguageSummary_3_Tlicho
(8.75 MB)
00_PlainLanguageSummary_3_Tlicho
(8.75 MB)
00_PlainLanguageSummary_2_Dene_Suline
(12.28 MB)
00_PlainLanguageSummary_2_Dene_Suline
(12.28 MB)
00_PlainLanguageSummary_1_English
(12.12 MB)
00_PlainLanguageSummary_1_English
(12.12 MB)
000_Cover_Letter
(27.05 KB)
000_Cover_Letter
(27.05 KB)
Letter from DDEC to GNWT regarding the extension of the socio-economic agreement
Letter from DDEC to GNWT regarding the extension of the socio-economic agreement
This is a letter from LKDFN to DDEC in response to the TLU/TK Baseline Report.
This is a letter from LKDFN to DDEC in response to the TLU/TK Baseline Report.
Jay Project update - Note to File
(259.65 KB)
Jay Project update - Note to File
(259.65 KB)
This is a letter from IEMA to Dominion Diamond re plans for the design of a dust suppression study.
This is a letter from IEMA to Dominion Diamond re plans for the design of a dust suppression study.
GNWT letter to DDEC re Socio-Ec Agreement
(33.57 KB)
GNWT letter to DDEC re Socio-Ec Agreement
(33.57 KB)
This is the Review Comment table for the Revised Terms of Reference for the Jay Project with attachments from the ORS.
This is the Review Comment table for the Revised Terms of Reference for the Jay Project with attachments from the ORS.
Revised Terms of Reference - Jay Project
(1.41 MB)
Revised Terms of Reference - Jay Project
(1.41 MB)
Notice of timeline requirements under 2014 MVRMA
(404.53 KB)
Notice of timeline requirements under 2014 MVRMA
(404.53 KB)
This Note to File advises parties that the review of the revised draft Terms of Reference for the Jay Project will occur on the Online Review System.
This Note to File advises parties that the review of the revised draft Terms of Reference for the Jay Project will occur on the Online Review System.
This is the Ekati Engagement Plan for the Jay Project.
This is the Ekati Engagement Plan for the Jay Project.
Jay Project Description Report Addendum
(40.99 MB)
Jay Project Description Report Addendum
(40.99 MB)
This is the Revised draft Terms of Reference for the Jay Project - clean copy.
This is the Revised draft Terms of Reference for the Jay Project - clean copy.
Revised draft Terms of Reference - track changes
(871.65 KB)
Revised draft Terms of Reference - track changes
(871.65 KB)
This is the cover letter for the revised draft Terms of Reference for the Jay Project.
This is the cover letter for the revised draft Terms of Reference for the Jay Project.
This is a letter from the Fort Resolution Metis Council to Dominion Diamond re: engagement
This is a letter from the Fort Resolution Metis Council to Dominion Diamond re: engagement
This is a letter from Dominion to the Review Board regarding an update and notice of change for the Jay Project.
This is a letter from Dominion to the Review Board regarding an update and notice of change for the Jay Project.
This is a letter from the Canadian Northern Economic Development Agency and the Government of the Northwest Teritories regarding participation in this EA.
This is a letter from the Canadian Northern Economic Development Agency and the Government of the Northwest Teritories regarding participation in this EA.
Letters from CanNor and GNWT re participation
(654.58 KB)
Letters from CanNor and GNWT re participation
(654.58 KB)
This is a letter from Dominion Diamond to Deninu Kue First Nation in response to the DKFN letter dated February 17, 2014.
This is a letter from Dominion Diamond to Deninu Kue First Nation in response to the DKFN letter dated February 17, 2014.
This Note to File documents a meeting between Review Board staff and representatives of Dominion Diamond to discuss the Terms of Reference.
This Note to File documents a meeting between Review Board staff and representatives of Dominion Diamond to discuss the Terms of Reference.
Alternatives Analysis Methodology
(616.42 KB)
Alternatives Analysis Methodology
(616.42 KB)
Party status applications (compiled)
(1.45 MB)
Party status applications (compiled)
(1.45 MB)
This is the Review Summary table for the review of the Terms of Reference transferred from the WLWB's Online Review System.
This is the Review Summary table for the review of the Terms of Reference transferred from the WLWB's Online Review System.
DDEC response to DKFN comments on the draft ToR
(189.76 KB)
DDEC response to DKFN comments on the draft ToR
(189.76 KB)
DDEC cover letter for LKDFN TOR responses
(118.47 KB)
DDEC cover letter for LKDFN TOR responses
(118.47 KB)
DKFN comments on draft Terms of Reference
(78.76 KB)
DKFN comments on draft Terms of Reference
(78.76 KB)
This is the cover letter for the Terms of Reference and Work Plan.
This is the cover letter for the Terms of Reference and Work Plan.
Terms of Reference
(872.37 KB)
Terms of Reference
(872.37 KB)
Interim draft Work Plan
(744.03 KB)
Interim draft Work Plan
(744.03 KB)
Party status for Jay-Cardinal Project
(313.36 KB)
Party status for Jay-Cardinal Project
(313.36 KB)
Note to File - documents uploaded to ORS
(276.24 KB)
Note to File - documents uploaded to ORS
(276.24 KB)
LKDFN Comments on Draft ToR
(511.35 KB)
LKDFN Comments on Draft ToR
(511.35 KB)
ToR comments and party status reminder
(266.45 KB)
ToR comments and party status reminder
(266.45 KB)
GNWT comments on Draft Terms of Reference
(293.74 KB)
GNWT comments on Draft Terms of Reference
(293.74 KB)
AANDC Comments on draft Terms of Reference
(317.36 KB)
AANDC Comments on draft Terms of Reference
(317.36 KB)
This document is titled "Scenario Analysis, Best practices in assessing cumulative effects from the MGP" and is submitted by AANDC as a follow-up to the Jan 8 technical meeting.
This document is titled "Scenario Analysis, Best practices in assessing cumulative effects from the MGP" and is submitted by AANDC as a follow-up to the Jan 8 technical meeting.
This is the Review Comment Summary table that indicates how the Review Board incorporated comments on the draft DDEC ToR into its own Jan 24 draft Review Board Terms of Reference.
This is the Review Comment Summary table that indicates how the Review Board incorporated comments on the draft DDEC ToR into its own Jan 24 draft Review Board Terms of Reference.
"Strategic approaches to regional cumulative effects assessmet: a case study of the Great Sand Hills, Canada, Noble, 2008" submitted during technical scoping meeting Jan 8, 2014. Canada
"Strategic approaches to regional cumulative effects assessmet: a case study of the Great Sand Hills, Canada, Noble, 2008" submitted during technical scoping meeting Jan 8, 2014. Canada
Scoping sessions - Collected summary notes Jan 2014
(1013.57 KB)
Scoping sessions - Collected summary notes Jan 2014
(1013.57 KB)
This is an example of potential Future Development Senarios prepared by Conoco Phillips. Recemmended for the registry from Jan 8 Technical Meeting.
This is an example of potential Future Development Senarios prepared by Conoco Phillips. Recemmended for the registry from Jan 8 Technical Meeting.
Letter requesting applications for party status
(507.22 KB)
Letter requesting applications for party status
(507.22 KB)
Comments requested on draft Terms of Reference
(305.64 KB)
Comments requested on draft Terms of Reference
(305.64 KB)
draft Terms of Reference Jay-Cardinal Project
(866.36 KB)
draft Terms of Reference Jay-Cardinal Project
(866.36 KB)
This is a letter from Ecology North with comments on the draft Terms of Reference.
This is a letter from Ecology North with comments on the draft Terms of Reference.
This is the issues scoping meeting agenda for Lutsel K'e, January 16, 2014.
This is the issues scoping meeting agenda for Lutsel K'e, January 16, 2014.
This is the agenda for the Issues scoping meeting in Behchoko January 14, 2014
This is the agenda for the Issues scoping meeting in Behchoko January 14, 2014
DDEC Scoping session presentation
(4.3 MB)
DDEC Scoping session presentation
(4.3 MB)
Technical scoping session agenda
(60.43 KB)
Technical scoping session agenda
(60.43 KB)
Comments summary table - DDEC draft ToR
(226.55 KB)
Comments summary table - DDEC draft ToR
(226.55 KB)
Summary table - comments on draft DDEC ToR
(260.52 KB)
Summary table - comments on draft DDEC ToR
(260.52 KB)
This is the agenda for the community issues scoping session for the Jay-Cardinal Project to be held in Yellowknife at the Tree of Peace on January 7, 2014.
This is the agenda for the community issues scoping session for the Jay-Cardinal Project to be held in Yellowknife at the Tree of Peace on January 7, 2014.
EC comments on DDEC draft ToR
(290.69 KB)
EC comments on DDEC draft ToR
(290.69 KB)
Federal department comments on DDEC draft ToR
(180.25 KB)
Federal department comments on DDEC draft ToR
(180.25 KB)
GNWT comments on DDEC ToR
(148.95 KB)
GNWT comments on DDEC ToR
(148.95 KB)
YKDFN comments on DDEC ToR
(169.05 KB)
YKDFN comments on DDEC ToR
(169.05 KB)
IEMA comments on DDEC draft TOR
(236.85 KB)
IEMA comments on DDEC draft TOR
(236.85 KB)
DDEC engagement session summaries Aug/Nov 2013
(513.96 KB)
DDEC engagement session summaries Aug/Nov 2013
(513.96 KB)
Notification letter to NIRB
(315.12 KB)
Notification letter to NIRB
(315.12 KB)
This is a notification from the Review Board of community scoping sesions and a technical scoping session scheduled for January 2014.
This is a notification from the Review Board of community scoping sesions and a technical scoping session scheduled for January 2014.
This is an Excel template to be used for comments and recommendations on the Review Board's proposed Terms of Reference. It can also be found on the WLWB's Online Review System.
This is an Excel template to be used for comments and recommendations on the Review Board's proposed Terms of Reference. It can also be found on the WLWB's Online Review System.
Request for comments on developer's proposed ToR
(474.48 KB)
Request for comments on developer's proposed ToR
(474.48 KB)
Letter from EC re SARA notification
(736.01 KB)
Letter from EC re SARA notification
(736.01 KB)
Letter from IEMA to WLWB - preliminary screening
(226.37 KB)
Letter from IEMA to WLWB - preliminary screening
(226.37 KB)
SARA notification letter to EC
(565.61 KB)
SARA notification letter to EC
(565.61 KB)
This is the Water Licence application - Mining Questionnaire submitted to the WLWB for preliminary screening.
This is the Water Licence application - Mining Questionnaire submitted to the WLWB for preliminary screening.
This is the Water Licence application Form submitted to the WLWB for preliminary screening.
This is the Water Licence application Form submitted to the WLWB for preliminary screening.
Spill Contingency Plan - Oct 18, 2013
(8.13 MB)
Spill Contingency Plan - Oct 18, 2013
(8.13 MB)
Engagement Record - Oct 18, 2013
(166.85 KB)
Engagement Record - Oct 18, 2013
(166.85 KB)
Land Use Permit Application - Map - Oct 18, 2013
(421.56 KB)
Land Use Permit Application - Map - Oct 18, 2013
(421.56 KB)
This is the Land Use Permit application form submitted to the WLWB for preliminary screening.
This is the Land Use Permit application form submitted to the WLWB for preliminary screening.
This is the Project Description Appendix 4C - Report on Drawdown Alternatives
This is the Project Description Appendix 4C - Report on Drawdown Alternatives
This is the Project Description Appendix 4B - Civil Engineering Components.
This is the Project Description Appendix 4B - Civil Engineering Components.
This is the Project Description Appendix 4A - Underground Mining Concept.
This is the Project Description Appendix 4A - Underground Mining Concept.
This is Appendix 3A of the Project Description - Aquatic Baseline Report.
This is Appendix 3A of the Project Description - Aquatic Baseline Report.
This is Appendix 2A of the Project Description - a draft Terms of Reference for the EA of the Project prepared by Dominion Diamond Ekati Corporation.
This is Appendix 2A of the Project Description - a draft Terms of Reference for the EA of the Project prepared by Dominion Diamond Ekati Corporation.
Project Description Jay-Cardinal Project
(18.36 MB)
Project Description Jay-Cardinal Project
(18.36 MB)
Notification to developer of referral to EA
(402.24 KB)
Notification to developer of referral to EA
(402.24 KB)
Notification of EA referral to distribution list
(471.19 KB)
Notification of EA referral to distribution list
(471.19 KB)
This is the letter from Aboriginal Affairs and Northern Development that refers the Jay-Cardinal Project to environmental assessment.
This is the letter from Aboriginal Affairs and Northern Development that refers the Jay-Cardinal Project to environmental assessment.