Main Content
Onglets principaux
Results
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
Norman Wells Operations - EA2425-02 Go to Project
Environmental Assessment (EA) - Cancelled
Line 490 Replacement Project - EA2425-01 Go to Project
Environmental Assessment (EA) - Cancelled
Requested material from CER process - C30690-2 (C30794). Imperial Response to IR Q6.3-Q6.5, filed on November 1, 2023 and February 6, 2024. Update engagement with the Tulit'a Renewable Resources Council, access to Bear island and Goose island, pip and cable specifications/cathodic projections/and tie-in, pipe pullback forces, update engineering design work, incident history, spill response equipment availability/response times, tank fire preparedness, supply to the community. Attachment 1: (Part 1) Final Event Reports. Attachment 2: (Part 2) Final Event Reports.
Requested material from CER process - C30035-1 (C30094). Imperial Response to Sahtu Renewable Resources Board Motion to compel, Q9c, with attachments. Attachment 1: Artificial Island Engagement Summary. Attachment 2: Engagement - Line 490 Timeline - October 2023. Attachment 3: Engagement - Line 490 Timeline - Updated Feb 2024. Attachment 4: Engagement - Line 490 Flowline Replacement Project - August and October 2023. Attachment 5: Engagement - Line 490 Flowline Replacement Project - 2024 Update
Requested material from CER process - C29771-2 (C29933). Imperials response to Sahtu Renewable Resources Board (SRRB) Motion to compel, Q10a-Q12b with attachment. Contains information regarding motion to compel and copy of donations and sponsorships from 2015-2018.
Requested material from CER process - C29771-2 (C29876). Imperial Response to CER IR Q4.5-4.7, filed on November 1, 2023 and February 6, 2024. Contains information on update on engagement, well status, version of engineering standard, alter the condition of a well - blanket approval, pipe and cable bundle and pullback, existing lines abandonment and decommissioning, annular pressure and frac out, Mackenzie river spill response tactics, shoreline cleanup techniques, emergency response scenarios, safety plan - hazards and risk evaluation, and financial responsibility. Attachment 1: Updated Issue Summary Log. Attachment 2: Summary of Recent NWO Risk Assessments. Norman Wells Operation Emergency Response Plan (NWO ERP) - Final - May 2024. Imperial Upstream Core Emergency Response Plan - December 2023. Norman Wells Operation Spill Contingency and Response Plan (NW SCARP) - Final - May 2024. Norman Wells Operations Mackenzie River Tactical Response Plan (MRTRP) - Final - April 2024
Requested material from CER process - C-29542-1 (C29632). Imperial Response to K'ahsho Got'ine Committee IR Q3.1-3.3, filed on May 6, 2024. Contains information regarding Aquatic Effects Monitoring Program, flowline failure and prevention, Horizontal Direction Drilling for Line 490 Replacement Activities (planning for riverbed erosion, frac out contingencies, K'ahsho Got'ine Monitoring), progressive reclamation of the operations, environmental impact of operations, and K'asho Got'ine Engagement.
Pagination
- Première page
- Page précédente
- …
- 13
- 14
- 15
- 16
- 17
- 18
- 19
- 20
- 21
- …
- Page suivante
- Dernière page