Displaying 376 - 400 of 12131
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
Draft report of the Norman Wells community session held in October 2024. This item is up for review on the Online Review System until January 17, 2025.
Wrigley Community Session Draft Report
(1.86 Mo)
Summary of Engagement with communities
(312.2 Ko)
GNWT Responses to PKFN Questions from Technical Sessions (see PR289 for questions)
Updated draft workplan
(330.27 Ko)
MVH draft workplan updated on November 29, 2024.
Meeting with the developer about the time needed for the next steps of the EA.
NWT Climate Action Strategic Framework
(1.79 Mo)
NWT Oil and Gas Annual Report 2023
(1001.46 Ko)
Line 490 Replacement Project - EA2425-01 Go to Project
Environmental Assessment (EA) - Cancelled
Preceding referral to environmental assessment, the Line 490 Project was subject to a permitting process by the Canada Energy regulator. During this process the CER issued draft conditions. The draft conditions for the Line 490 project can be viewed in Appendix 2, Revised draft conditions for comment replacement activities application.
Preceding referral to environmental assessment, the Line 490 Project was subject to a permitting process by the Sahtu Land and Water Board for land use permit S24A-005. During this process the SLWB issued a draft land use permit for review by parties.
Preceding referral to environmental assessment, the Line 490 Project was subject to a permitting process by the Sahtu Land and Water Board for water licence S24L1-002. During this process the SLWB issued a draft water licence for review by parties.
Updated Workplan
(213.8 Ko)
Notice of Proceeding - Information Requests
(235.13 Ko)
This is the Review Board's Scope of Environmental Assessment and Reasons for Decision.
This Notice of Proceeding provides the updated workplan for this EA and describes the assessment steps.
The Review Board is requesting the developer provide a Summary Impact Statement. This document is to function as an organized, consolidated document of all relevant information to date, and as a basis for understanding the development and potential impacts on the environment including people.
This document is a compilation of the review of the Board's draft Scoping document and workplan including parties' comments, developer responses and supporting letters. This review was conducted using the Online Review System (ORS). Once the review is complete it mus be transferred to the Public Registry.
The Developer requested documents from the Canada Energy Regulator related to the review of the line 490 project and parties' information requests. The Review Board has transferred these documents to the Public Registry. This Notice of Proceeding provides a table with links to the documents.
Norman Wells Operations - EA2425-02 Go to Project
Environmental Assessment (EA) - Cancelled
The Sahtu Land and Water Board is considering granting an emergency renewal to the water license for the Norman Wells Operation. This renewal would allow for continued operations while the environmental assessment is completed.
Participant Funding Application Guide
(844.5 Ko)
Public Notice, participant funding available
(176.76 Ko)
Crown-Indigenous Relations and Northern Affairs Canada intends to provide participant funding. Applications are due Jan 12, 2025. Please see the application (PR#33) and guide (PR#34) for further information on participant funding.
Water Licence S13L1-007 Norman Wells Operation
Upcoming Expiry Date and Continuation of EA2425-02
Review Board Decision with reasons regarding Imperial Oil NWT Ltds Request for Ruling. Edited on December 6, 2024 to fix broken links.
Letter from the Review Board to Imperial Oil NWT Ltd. summarising the Review Board's decision with reasons the Request for Ruling.