Main Content
Primary tabs
Results
Displaying 1901 - 1925 of 12133
Tłı̨chǫ All Season Road - EA-1617-01 Go to Project
Environmental Assessment (EA) - Complete
Draft Spill Contingency Plan
Draft Wildlife and Wildlife Habitat Protection Plan
Appendix N - draft Waste Management Plan
(829.1 KB)
Email correspondance confirming that the community of Whati will permit refuse from construction camps in the Whati landfill
All-season road alignment map and images prepared by Kavik-Stantec for GNWT-DOT
Field survey photos from argo trip along the proposed all-season route in June 2014, including summary table and cooridinates of observations
Hydrologic and hydraulic study prepared by Stantec for GNWT-DOT
Hydrological study progress report prepared by Stantec for the GNWT-DOT
DFO fisheries protection self-assessment record, prepared by GNWT-DOT
Archaeological impact assessment (AIA) prepared by Stantec for GNWT-DOT in 2014
Micro-economic analysis of the all-season road prepared by the Community Government of Whati in 2015
Erosion and sediment control manual (GNWT-DOT)
Draft fish and fish habitat protection plan (FFHPP)
Archaeological site chance find protocol (GNWT-DOT)
Appendix Z - draft Emergency Response Plan
(553.48 KB)
Prairie Creek All Season Road - EA1415-01 Go to Project
Environmental Assessment (EA) - Complete
Ecotype Map Report_Nahanni_FINAL
(10.23 MB)
GoC responses to technical session undertakings 10 and 15
GNWT response to undertaking #41
(685.68 KB)
Letter from NBDB Chief to Justin Trudeau re access road entrance on IAB lands and project co-management
Note to file for board staff contact July 8-15
Nahanni Butte Dene Band Council Resolution re: Traditional Land Use Agreement (TLUA) with Canadian Zinc Corporation. BCR # 07/05/2016-1
Detailed map of IAB lands near Nahanni Butte
MVEIRB presentation for Fort Simpson Cultural Impacts Technical Session_July 5, 2016
CanZinc presentation in Nahanni Butte and Fort Simpson.
MVEIRB presentation for Nahanni Butte Cultural Impacts Technical Session, July 4 2016