Main Content
Primary tabs
Results
Displaying 1951 - 1975 of 12199
Tłı̨chǫ All Season Road - EA-1617-01 Go to Project
Environmental Assessment (EA) - Complete
WLWB Application Cover Letter
(89.38 KB)
Appendix A to the Project Description Report. Joint letter to acknowledge access through an agreement between the Tlicho Government and the Government of the Northwest Territories.
Description of water sampling procedure at SNP sites.
Scoping study of potential social, economic and cultural benefits and risks of a proposed all-weather road in the community of Whati.
TASR figures including road alignment, road cross section, alternative routes, borrow areas, surficial geology. soils, ecozones, burn areas and land uses.
An economic cost benefit analysis quantifying community and industry costs and benefits associated with the Tlicho All-season Road project.
Appendix D - Motion 2015-018
(56.09 KB)
Introduction to Appendix E of the Project Description Report, including affected parties, engagement goals and methods, engagement plan, and engagement summary and log templates.
Appendix E - Engagement Record (Log)
(276.4 KB)
Appendix E - Engagement Record (Summary)
(105.84 MB)
A letter from Tlicho Grand Chief Eddie Erasmus to the Minister of DOT regarding collaboration with DOT on preparing studies for an application for an all-season road
A map and route plan and profile (by route section) prepared by DOT of the proposed all-season road to Whati
Powerpoint photo presentation of existing conditions along the proposed all-season road route
Conceptual designs of the major bridge and culverts along the all-season road, prepared by GNWT-DOT
Table characterizing granular and bedrock features (with recommendations for future work) by section along the all-season road
Draft Quarry operations plan, prepared by GNWT-DOT
Draft Spill Contingency Plan
Draft Wildlife and Wildlife Habitat Protection Plan
Appendix N - draft Waste Management Plan
(829.1 KB)
Email correspondance confirming that the community of Whati will permit refuse from construction camps in the Whati landfill
All-season road alignment map and images prepared by Kavik-Stantec for GNWT-DOT
Field survey photos from argo trip along the proposed all-season route in June 2014, including summary table and cooridinates of observations
Hydrologic and hydraulic study prepared by Stantec for GNWT-DOT
Hydrological study progress report prepared by Stantec for the GNWT-DOT
DFO fisheries protection self-assessment record, prepared by GNWT-DOT