Main Content
Primary tabs
Results
Displaying 12151 - 12175 of 12201
Ekati - Sable, Pigeon and Beartooth Pipes expansion - EA99-004 Go to Project
Environmental Assessment (EA) - Complete
Letter from INAC to NWT Water Board recommending the proposed development of Sable, Pigeon and Beartooth kimberlite pipes to Environmental Assessment
BHP Project Description
(3.93 MB)
Notes re. conversation with CBC reporter Lee Selleck in response to questions about EA process for proposed BHP expansion
Fort Providence/Cameron Hills Lumber Harvesting - EA99-001 Go to Project
Environmental Assessment (EA) - Withdrawn
EA Cancellation Notice
(33.17 KB)
Fort Providence/Cameron Hills Lumber Harvesting - EA99-002 Go to Project
Environmental Assessment (EA) - Withdrawn
EA Cancellation Notice
(33.17 KB)
Cameron Hills Exploratory Drilling Project - EA00-004 Go to Project
Environmental Assessment (EA) - Complete
granted by INAC and permit covers the access road from the border to the well site only. From January 15, 1999 to January 14, 2001.
Paramount Resources Project Description
(2.45 MB)
MVLWB Preliminary Screening Report Form
(731.38 KB)
Geographic Air Survey Ltd. map
(483.48 KB)
Fuel Cache Retrieval and Clean-up development - EA00-002 Go to Project
Environmental Assessment (EA) - Complete
Submission by CPAWS
(4.54 MB)
Submission by CPAWS
(3.27 MB)
Note to File
(31.82 KB)
Fax Cover Sheet
(33.57 KB)
Fax Cover Sheet
(30.34 KB)
Wool Bay exploration drilling - EA03-003 Go to Project
Environmental Assessment (EA) - Complete
Notices for joint pre-hearing conference and public hearing for several developers planning diamond exploration programs in the Drybones/Wool Bay area, Akaitcho region. Includes North American General Resources.
Map, Wool Bay and Development Study Area
(774.82 KB)
Map, Drybones and Wool Bay
(8.1 MB)
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
Notification of EA Media Ad
(151.34 KB)
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
Technical and Financial Report
(6.84 MB)
Rough notes taken by MVEIRB's secretary during the De Beers Technical Sessions.
Appendices for the De Beers Snap Lake Diamond Project Technical Memo on Preliminary Mine Closure and Reclamation Plan. This is a large file - 10MB
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
This is the template for parties to follow when submitting proposed information requests to the Review Board.
Map of Sidon Site
(2.22 MB)