Main Content
Primary tabs
Results
Displaying 12101 - 12125 of 12133
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
Rough notes taken by MVEIRB's secretary during the De Beers Technical Sessions.
Appendices for the De Beers Snap Lake Diamond Project Technical Memo on Preliminary Mine Closure and Reclamation Plan. This is a large file - 10MB
Notice of the Pre-Hearing Conference and the Public Hearing for the De Beers Snap Lake environmental assessment, published with Northern News Services.
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
This is the template for parties to follow when submitting proposed information requests to the Review Board.
Map of Sidon Site
(2.22 MB)
Color Map of Approximate Drill Locations
(94.21 KB)
Fuel Cache Retrieval and Clean-up development - EA00-002 Go to Project
Environmental Assessment (EA) - Complete
Fax Cover Sheet
(30.34 KB)
Agenda Item
(30.38 KB)
Wool Bay exploration drilling - EA03-003 Go to Project
Environmental Assessment (EA) - Complete
Map, Drybones and Wool Bay
(8.1 MB)
Map, Development Locations
(811 KB)
CanTung Mine Water License Renewal - EA02-003 Go to Project
Environmental Assessment (EA) - Cancelled
Uranium Exploration Thelon Basin (Screech Lake) - EA0506-003 Go to Project
Environmental Assessment (EA) - Cancelled
Workplan for phase one of the environmental assessment of Ur Energy's proposed uranium exploration program at Screech Lake, Akaitcho region, NWT. Phase one will be a public hearing to determine the scope of the development and assessment, to guage public
Map, Ur Energy Mineral Exploration Program
(930.91 KB)
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Dehcho Bridge - Developers Assessment Report
(566.2 KB)
Yellowknife Gold Project - EA0506-004 Go to Project
Environmental Assessment (EA) - Withdrawn
Discovery Mine Reclamation Presentation
(1.75 MB)
Mackenzie Gas Project - EA03-007 Go to Project
Environmental Assessment (EA) - Complete
Map showing Protected Areas in the Mackenzie Valley
Fortune Minerals Meridian Lake - EA0405-003 Go to Project
Environmental Assessment (EA) - Cancelled
Form for Distribution List
(209.5 KB)
Mineral Exploration north of Sachowia Point - EA0506-002 Go to Project
Environmental Assessment (EA) - Withdrawn
Map showing approximate location of proposed development in relation to other developments recently referred to EA.
Underground Decline and Pilot Plant - EA01-002 Go to Project
Environmental Assessment (EA) - Complete
Note to File
(22.73 KB)
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
An issues and position paper from SAMBAA K'E FIRST NATION to MVEIRB, dated Dec 1, 2004
Cameron Hills Exploratory Drilling Project - EA00-004 Go to Project
Environmental Assessment (EA) - Complete
General file information on screening
(533.72 KB)
Ekati - Sable, Pigeon and Beartooth Pipes expansion - EA99-004 Go to Project
Environmental Assessment (EA) - Complete
Map can be found in the public registry files at the Mackenzie Valley Environmental Impact Review Board office (Vol. 2, Doc. 15)
BHP application to Lands Division of DIAND and NWT Water Board for land lease amendments and water license for proposed Pigeon, Sable and Beartooth pipes expansion
Letter from BHP to NWT Water Board requesting a Type B Water License for the proposed development of Sable, Pigeon and Beartooth kimberlite pipes