This is a hydroelectric project that adds a new 36 megawatts of power generating capacity to the existing 18 megawatt Taltson Twin Gorges Plant and includes transmission lines through the Akaitcho region and Monfwi Gogha De Niitlee.
---
Preliminary screening public registry is available here:
MV2007L4-0029 and MV2007I0033 Deze Energy Corp. Ltd.
---
There are no documents at this time.
Letter re: Termination of EA
(42.64 KB)
NWT Energy Corp letter re: termination of EA
(58.92 KB)
EA Extension Letter Dec 27 2012
(66.38 KB)
Deze letter re: adjournment Nov 2012.PDF
(78.11 KB)
The following document is a letter from the Review Board to Deze Energy Corporation regarding a definitive prediction for further information on the Taltson Hydroelectric Expansion Project.
Taltson Hydro Expansion Project Update letter-August 30, 2012
Board letter to Deze re: project status
(265.88 KB)
A letter to the Review Board from Deze Energy regarding the on-going investigation of transmission routing. This is an update from the company .
Letter to Review Board from Deze Energy
(683.92 KB)
Note to File- Proposal extension
(121.67 KB)
Deze request for deadline extension
(723.73 KB)
Re-opening record w. instructions to Deze
(901.53 KB)
Review Board Letter to INAC Dec 22 2010
(272.27 KB)
Minister's response to Deze Report of EA
(1.32 MB)
Letter from LKDFN to INAC Minister Duncan
(25.17 KB)
Draft ToR- Deze Advisory Routing Committee
(158.32 KB)
These are two letters from INAC dated Aug. 10th and 17th, 2010, acknowledging receipt of the Report of EA for the Taltson project.
This is a Note to File correcting the coordinates used to describe the mouth of the Lockhart River in the Report of Environmental Assessment for the Taltson Hydroelectric Expansion Project.
The following document is a cover letter for the Review Board's Report of Environmental Assessment for Deze Energy Corp. Ltd.'s Taltson Hydroelectric Expansion Project.
The following document is the Review Board's Report of Environmental Assessment for Deze Energy Corp. Ltd.'s Taltson Hydroelectric Expansion Project.
| New | Total | Stage |
|---|---|---|
| 19 | Preliminary screening | |
| 4 | Assessment/review startup | |
| 15 | Scoping | |
| 18 | Terms of Reference and workplans | |
| 73 | Developer's Assessment Report/Environmental Impact Statement | |
| 22 | Information requests | |
| 39 | Technical or community sessions | |
| 13 | Technical reports | |
| 25 | Public hearings | |
| Hearing follow-up | ||
| 4 | Report of Environmental Assessment/Impact Review | |
| 16 | Post Report materials (current stage) | |
| Minister's decision and final measures | ||
| 163 | Other public registry materials | |
| 0 | 411 | Total Documents (See All) |