Main Content
Primary tabs
Results
Displaying 7701 - 7725 of 12133
Screech Lake - EA0607-003 Go to Project
Environmental Assessment (EA) - Complete
Submitted to MVEIRB for the community hearing on UR Energy's proposed uranium exploration project, held in Lutsel K'e, NWT on Jan 16 & 17, 2007. Baker Lake was unable to attend the hearing.
Athabasca Denesuline Presentation
(431.47 KB)
Arctic Ecoventures Presentation
(4.03 MB)
developer IR responses
(73.85 KB)
Jim Storey submission
(11.46 KB)
Draft Hearing Agenda
(28.96 KB)
Mineral Exploration Program - EA0506-005 Go to Project
Environmental Assessment (EA) - Cancelled
YKDFN response to draft Work Plan
(8.34 KB)
Letter from INAC to MVEIRB that provides comments on the YKDFN's request for ruling, as well as comments on the proposed Work Plan.
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
YKDFN response to draft work plan
(8.34 KB)
Letter from INAC to MVEIRB that provides comments on the YKDFN's request for ruling, as well as comments on the proposed Work Plan.
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
Traditional Knowledge Study Report - Hay River
Traditional Knowledge Study Summary Report - Fort Resolution
DAR Appendix B - Rare plant survey
(8.39 MB)
DAR Appendix B - Vegetation baseline
(4.07 MB)
DAR Appendix B - Water Sampling Report
(17.83 MB)
DAR Appendix B - Wildlife surveys
(10.99 MB)
DAR Appendix C - Feasibility study
(780.51 KB)
DAR Appendix C - Groundwater flow evaluation
(299.2 KB)
DAR Appendix D - GNWT community statistics 2006
(398.08 KB)
DAR Appendix F - Hazardous materials plan
(97.83 KB)
DAR Appendix F - Material Safety Data Sheets
(125.12 KB)
Developer's Assessment Report
(29.54 MB)