Main Content
Primary tabs
Results
Displaying 6101 - 6125 of 12133
NICO Project - EA0809-004 Go to Project
Environmental Assessment (EA) - Complete
This letter notifies the Distribution List that the Review Board will hold a scoping session in Wekweeti on November 2nd and 3rd for the environmental assessment of Fortune Minerals Ltd.'s proposed NICO cobalt-gold-copper-bismuth project.
Note to File for the environmental assessment of Fortune Minerals Ltd.'s NICO cobalt-gold-copper-bismuth project that summarizes an October 26, 2009 meeting between Review Board staff and a Fortune Minerals Ltd. representative regarding the draft workplan for the environmental assessment.
NSMA comments on draft ToR
(495.68 KB)
Transport Canada comments on draft TOR
(1.12 MB)
Tlicho Government comments on draft ToR
(609.64 KB)
INAC comments on draft ToR
(217.62 KB)
GNWT comments on draft ToR
(122.29 KB)
NRCan comments on NICO draft ToR
(228.07 KB)
Fortune Minerals comments on draft ToR
(1.23 MB)
DFO Comments on Draft ToR
(145.28 KB)
NICO draft Terms of Reference extension
(475.13 KB)
NICO draft Work Plan
(8.39 MB)
WRRB - comments on draft ToR
(1.2 MB)
EC comments on draft ToR
(41.24 KB)
Yellowknife Gold Project (2008) - EA0809-003 Go to Project
Environmental Assessment (EA) - Ongoing
This document is the Land Use Permit Extension for Mineral Exploration, Discovery Lake and Nicholas Lake, in support of advanced exploration for Tyhee NWT Corp.'s Yellowknife Gold Project. The new expiry date for this Land Use Permit is February 9, 2012. The Yellowknife Gold Project is in environmental assessment, and the Developer's Assessment Report is expected in 2010.
This document is the 2009 version of the geotechnical inspection report that Tyhee NWT Corp submits annually to the Mackenzie Valley Land and Water Board in accordance with the terms of Tyhee's Type "A" Land Use Permit MV2005C0001. The report covers the annual geotechnical inspection of the airstrip, apron and access road at the Yellowknife Gold Project.
Cameron Hills Gathering System - EA01-005 Go to Project
Environmental Assessment (EA) - Complete
Annual Report June 2008-May 2009
(3.92 MB)
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
This is the Review Board's response to the Oct. 9, 2009 letter from INAC regarding the Imperial Dehcho Geotechnical Program (EA 03-009).
This letter from INAC describes the Ministerial decision regarding the environmental assessment of the Imperial Dehcho Geotechnical Program (EA 03-009). It follows post-Report of Environmental Assessment consultations. Attachments include revised measures and a letter dated April 3, 2008 from Pehdzeh Ki First Nation.
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
Transcripts from Day 1 - Oct 1 2009 Yellowknife Deze EA technical session. These are also available in html format http://mail.tscript.com/trans/mac/oct_05_09/index.htm
Template for meeting report
(41.75 KB)
Transcripts from Day 2 - Oct 2 2009 Yellowknife Deze EA technical session. These are also available in html format http://mail.tscript.com/trans/mac/oct_02_09/index.htm
Transcripts from Day 1 - Oct 1 2009 Yellowknife Deze EA technical session. These are also available in html format http://mail.tscript.com/trans/mac/oct_01_09/index.htm
Transcripts from September 29th 2009 Lutselk'e technical session. These are also available in html format http://mail.tscript.com/trans/mac/sept_29_09/index.htm
Mineral Exploration at Howard's Pass (Selwyn Project) - EA0708-001 Go to Project
Environmental Assessment (EA) - Complete
Issuance of permit for Selwyn Project
(512.44 KB)