Main Content
Primary tabs
Results
Displaying 6026 - 6050 of 12202
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
YKDFN Hearing Presentation Summary
(62.52 KB)
Comments from Marc Choyt supporting LKDFN
(43.18 KB)
This cover letter is related to three documents on transmission line routing alternatives, submitted by Deze as an undertaking from the hearing. (The supporting documents are posted separately on this page).
This is the third of three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
This is a summary of the first of the three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
This report is number two of three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
This report is one of three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
October 2009 Caribou Workshop Report
(6.87 MB)
This is the second of three attachments to the GNWT's Jan. 27, 2010 response to the information request issued January 21, 2010. It is a draft technical report on the Bathurst caribou herd decline.
GNWT Caribou Presentation
(4.08 MB)
This is the covering letter for the GNWT's Jan. 27, 2010 response to the information request issued January 21, 2010. (The three attachments are posted on this page as seperate documents due to their large file size).
BQCMB July 2009 Release re: Beverly Herd
(54.66 KB)
BQCMB Backgrounder- Beverly Herd
(51.09 KB)
Adjustment to Transmission Line Route
(359.09 KB)
This is one of the articles referenced by the developer in its commitment #51, in the document it submitted on November 2, 2009 following the EA technical sessions.
This request seeks information on caribou, as presented to the NWT Board Forum on November 29, 2009.
Comments by Dr. Brenda Parlee, Canada Research Chair, Faculty of Native Studies, University of Alberta. (The referenced 1998 paper by Chandler and Lalonde has been posted as a seperate document).
Updated Submission from Gordon Van Tigham
(184.71 KB)
Updated Presentation from Deze Energy
(1.87 MB)
Public Hearing Transcripts for Jan 15, 2010
(551.07 KB)
Public Hearing Transcripts for Jan 14, 2010
(465.29 KB)
Comments from Dr. Anne Kendrick
(62.92 KB)
Avalon Rare Mineral presentation
(829.24 KB)
Additional letters to Chief Nitah sharing comments and feelings of the students from Lutselk'e of the Taltson Project.
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
INAC request for meeting w YKDFN
(115.29 KB)