Results
Displaying 8726 - 8750 of 12131
Drybones Bay mineral exploration - EA03-006 Go to Project
Environmental Assessment (EA) - Complete
Meeting Summary
(78.21 Ko)
Letter regards resolution of the recommendations.
Request for consultations to modify the Review Board's recommendations.
Letter regards the decision on the recommendation contained in the REA and Reaons for Decision on the Snowfield Development Corporation's Diamond Exploration Program.
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
Cover letter introducing the DAR for Imperial Oil's proposed winter field geotechnical survey program, Dehcho region. This file includes an email that included the DAR as an attachment, which was sent to the Board before the paper copy arrived.
Email re: Aerial Photos
(36.25 Ko)
Developer's Assessment Report
(20.17 Ko)
Letter from MVEIRB re: Party Status
(142.23 Ko)
Horn River Mineral Exploration - EA0405-001 Go to Project
Environmental Assessment (EA) - Withdrawn
MVEIRB email re: deadline for comments
(90.2 Ko)
The Draft Terms of Reference for the Environmental Assessment of the proposed Horn River mineral exploration.
Distribution List
(649 Ko)
Joachim Bonnetrouge - Concerns about potential development in the Edezhie Protected Area
Cameron Hills Extension Project - EA03-005 Go to Project
Environmental Assessment (EA) - Complete
Paramount expresses concerns that delays in the regulatory process might cause no work to occur during winter 2004/05 and requests the expedient completion of the regulatory process.
Letter is in response to correspondance from Paramount Resources to the Minister regarding the Cameron Hills Extension project, South Slave region.
Letter states a correction to the Report of Environmental Assessment for Paramount Resources' Cameron Hills Extension project, South Slave region.
Response to Report of Environmental Assessment
(903.19 Ko)
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Letter states participants who have been granted party status to the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
Identification Form for EA role - EC advice
(118.62 Ko)
Identification Form for EA role - INAC
(228.32 Ko)
Dehcho Bridge Corporation Presentation
(315.14 Ko)
Prairie Creek Phase III Drilling Program - EA0405-002 Go to Project
Environmental Assessment (EA) - Complete
A detailed project description was requested for the Environment Assessment of CZN's drilling expansion.
Correction to the deadline for the distribution list conformation form.
Mackenzie River 2D Seismic Program - EA02-002 Go to Project
Environmental Assessment (EA) - Complete
DCFN express concerns and dissatisfaction with the level of consultation they received during the consult to modify process and review of the REA.
MVEIRB sets up a meeting to deal with the substance of the consultation requests.