Main Content
Onglets principaux
Results
Displaying 8676 - 8700 of 12191
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Attendance list for the Dehcho Bridge Pre Hearing Conference held October 4, 2004.
Indian and Northern Affairs' Pre Hearing Conference worksheets (October 1, 2004)
Further response to Information Request 2.1.1 regarding the status of the Peer Review Report (September 30, 2004)
GNWT Pre Hearing Conference materials submitted to the Review Board in anticipation of the October 4, 2004 PRE-HEARING CONFERENCE.
Environment Canada's material submitted to the Board prior to the October 4, 2004 Pre Hearing conference.
Developer's Assessment Report Appendix 12 - Cost Benefit Analysis (REVISED September 2004)
Nichols Cost-Benefit Report, submitted as Appendix 12 for the DAR (Revised September 21, 2004). (DAR Vol# 1 )
Indian and Northern Affairs Canada's Technical Report on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge.
Pre Hearing Conference Material (EA03-008)
(200.81 Ko)
Environment Canada Technical Report (Sept 10-04)
(696.65 Ko)
Cameron Hills Extension Project - EA03-005 Go to Project
Environmental Assessment (EA) - Complete
Comments regarding the Report of Environmental Assessment for Paramount Resources' Cameron Hills Extension project, Dehcho region.
Comments regarding the Report of Environmental Assessment for Paramount Resources' Cameron Hills Extension project, Dehcho region.
Comments regarding the Report of Environmental Assessment for Paramount Resources' Cameron Hills Extension project, Dehcho region.
Comments on correspondance from the NEB regarding the Report of Environmental Assessment for Paramount Resources' Cameron Hills Extension project, Dehcho region.
Email Joe Acorn to MVEIRB
(88.13 Ko)
Comments on correspondance from the NEB regarding Paramount Resources' Cameron Hills Extension project, Dehcho region.
Letter details proposed modifications from the National Energy Board to recommendations made by the MVEIRB in the REA for Paramount Resources' Cameron Hills Extension project, South Slave region.
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
Response to first round of IRs issued in the environmental assessment of Imperial Oil Ventures' Geotechnical program, Dehcho region.
Information Requests
(211.47 Ko)
Summit Creek Exploration Well - EA03-001 Go to Project
Environmental Assessment (EA) - Complete
Northrock would like to amend their LUP to allow for a winter airstrip to support construction.
MVEIRB thanks SLWB for bringing the proposed changes to their attention and confirms details of a phone conference earlier that week. MVEIRB also provided suggested measure and guidance for the amendment to the LUP
SDL 8 2-D Geophysical Program - EA0506-007 Go to Project
Environmental Assessment (EA) - Complete
Linear Disturbance ecodistricts
(859.02 Ko)
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
This is the original Land Use Permit application from Sidon to the MVLWB. It includes a contingency spill response, and a document titled "Modified Developer's Assessment Report".