Main Content
Onglets principaux
Results
Displaying 8626 - 8650 of 12131
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Environment Canada's material submitted to the Board prior to the October 4, 2004 Pre Hearing conference.
Developer's Assessment Report Appendix 12 - Cost Benefit Analysis (REVISED September 2004)
Nichols Cost-Benefit Report, submitted as Appendix 12 for the DAR (Revised September 21, 2004). (DAR Vol# 1 )
Indian and Northern Affairs Canada's Technical Report on the Dehcho Bridge Corporation's proposed Mackenzie River Bridge.
Pre Hearing Conference Material (EA03-008)
(200.81 Ko)
Environment Canada Technical Report (Sept 10-04)
(696.65 Ko)
Final Response to Information Request 2.1.21 issued to the Dehcho Bridge Corporation
Dillon Consulting Ltd. report title: Phase I and II Environmental Site Assessment for Providence Ferry Landings, Ft. Providence, NWT.
Cameron Hills Extension Project - EA03-005 Go to Project
Environmental Assessment (EA) - Complete
Email Joe Acorn to MVEIRB
(88.13 Ko)
Comments on correspondance from the NEB regarding Paramount Resources' Cameron Hills Extension project, Dehcho region.
Letter details proposed modifications from the National Energy Board to recommendations made by the MVEIRB in the REA for Paramount Resources' Cameron Hills Extension project, South Slave region.
Paramount is requesting a 2 year extension on their current Land Use Permit and Water License.
Letter clarifies the role of Ka'a'gee Tu First Nation in consultations related to the decision-making process post-Report of Environmental Assessment for Paramount Resources' Cameron Hills Extension project, South Slave region.
Summit Creek Exploration Well - EA03-001 Go to Project
Environmental Assessment (EA) - Complete
Northrock would like to amend their LUP to allow for a winter airstrip to support construction.
MVEIRB thanks SLWB for bringing the proposed changes to their attention and confirms details of a phone conference earlier that week. MVEIRB also provided suggested measure and guidance for the amendment to the LUP
SDL 8 2-D Geophysical Program - EA0506-007 Go to Project
Environmental Assessment (EA) - Complete
Linear Disturbance ecodistricts
(859.02 Ko)
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
Information Requests
(211.47 Ko)
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
This is the original Land Use Permit application from Sidon to the MVLWB. It includes a contingency spill response, and a document titled "Modified Developer's Assessment Report".
Mackenzie Gas Project - EIR0405-001 Go to Project
Environmental Impact Review (EIR) - Complete
Terms of Reference
(391.42 Ko)
Agreement between the Minister of the Environment, MVEIRB and the Inuvialuit to conduct an environmental review of the Mackenzie Gas Project, including the creation of the joint review panel. Agreement gives effect to the Cooperation Plan (see Additional