Displaying 8526 - 8550 of 12191
Cameron Hills Extension Project - EA03-005 Go to Project
Environmental Assessment (EA) - Complete
INAC informs MVEIRB that the responsible minister has reviewed their proposed changes to the EA
Email informing NEB and INAC of MVEIRB's proposed changes to EA03-005.
NEB's response to MVEIRB's proposed wording for recommended measure 4.
Email - MVIERB response to NEB
(336.76 Ko)
Letter from NEB to MVEIRB
(104.37 Ko)
INAC thanks MVEIRB for the summary of the consult to modify meeting and provides some comments and revisions to the review board on its report of EA
Letter from INAC Re: Paramount EA R13 and R16
(104.22 Ko)
Notification that the GNWT has provided MVEIRB with the requested information concerning caribou.
Letter from MVEIRB to NEB
(102.19 Ko)
Letter from NEB to MVEIRB
(104.37 Ko)
Letter from INAC to MVEIRB
(84.6 Ko)
Letter from MVEIRB to INAC and NEB
(1.43 Mo)
Letter from MVEIRB to INAC
(1.88 Mo)
INAC - Northern Benefits
(110.22 Ko)
Prairie Creek Phase III Drilling Program - EA0405-002 Go to Project
Environmental Assessment (EA) - Complete
Emails Regarding Proposed Scoping Sessions
(190.02 Ko)
(1.29 Ko)
Notice of time conflict from interested parties and request for an alternative date for the scoping sessions.
Email correspondance between MVEIRB and Can Zinc about having a Can Zinc representative present for scooping meetings.
Notice of Scoping Sessions
(162.2 Ko)
Report describing the population distributions of grizzly bears in the Prairie Creek Area, Nahanni Region, Dehcho, NWT
A letter providing an overview of Dr. Weaver's research into grizzly bears in the greater Nahanni ecosystem
DCFN request to be added to the distribution list.
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Letter response to several questions raised by DIAND inquiring about mitigation commmitments by the developer.
Fortune Minerals Meridian Lake - EA0405-003 Go to Project
Environmental Assessment (EA) - Cancelled
Letter states that the environmental assessment of the Meridian Lake project has been cancelled.
Mineral Exploration Program - EA0506-005 Go to Project
Environmental Assessment (EA) - Cancelled
INAC to MVLWB - Shoreline Clarification
(134.98 Ko)