Main Content
Onglets principaux
Results
Displaying 8826 - 8850 of 12191
Horn River Mineral Exploration - EA0405-001 Go to Project
Environmental Assessment (EA) - Withdrawn
Canadian Press article: Environmental protection concerns due to increased mineral exploration.
A Copy of the MVLWB's letter of decision the was distributed to the Dehcho, Dogrib and South Slave area.
Referral to Environmental Assessment
(16.04 Ko)
The MVLWB's decision to refer the Jane Lind mineral exploration to EIA and their preliminary screening report.
Deh Cho Prepare to Fight for Land
(184.94 Ko)
Letter from Northwest Territories Protected Areas Strategy highlighting concerns with the proposed Horn River LUP.
Cameron Hills Extension Project - EA03-005 Go to Project
Environmental Assessment (EA) - Complete
Report of Environmental Assessment
(1.95 Mo)
Cover Letter from MVEIRB for REA
(87.36 Ko)
Prairie Creek Phase III Drilling Program - EA0405-002 Go to Project
Environmental Assessment (EA) - Complete
Letter from MVLWB to Canadian Zinc regarding the board's decision and the amendment request. Preliminary Screening Report is attached.
Comments from the Nahanni Park regarding Canadian Zinc's LUP ammendment application for the phase II drilling at Prairie Creek, Dehcho region.
This letter contains recommendations by DIAND inspectors on the land use operating conditions and narrative for the proposed Can Zinc Prairie Creek surface exploration project.
Comments regarding the ammendment request for the proposed Can Zinc exploration project at Prairie Creek.
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
Note to File
(33.33 Ko)
Original of letter that states Imperial Oil's position on a proposed expansion of scope for the assessment of their proposed winter field geotechnical survey program, Dehcho region. See letter from May 14, 2004.
Terms of Reference
(1.05 Mo)
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
DAR Addendum 1
(681.67 Ko)
Letter confirms that the revised Developer's Assessment Report conforms with the terms of reference for the environmental assessment of the Mackenzie River Bridge project at Fort Providence, NWT
Revised version of the Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence, NWT
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
Letter from the Minister of the department of Resources, Wildlife and Economic Development regarding the signing of the Socio-Economic and Environmental Agreements with De Beers.
Mackenzie Gas Project - EA03-007 Go to Project
Environmental Assessment (EA) - Complete
Report outlines the decisions reached by the MVEIRB during Phase I of the environmental assessment. The MVEIRB recommended that the proposed project be subject to an environmental review.
Drybones Bay mineral exploration - EA03-006 Go to Project
Environmental Assessment (EA) - Complete
Letter provides clarification on the intent of the recommendations in the Report of Environmental Assessment for Snowfield Development Corp. diamond exploration.
Fortune Minerals Meridian Lake - EA0405-003 Go to Project
Environmental Assessment (EA) - Cancelled
Letter provides advice from both Environment Canada and the Canadian Wildlife Society regarding potential impacts of the proposed development at Meridian Lake, NWT
Letter expresses the high likelihood of significant archaeological sites within the development area.