Displaying 8801 - 8825 of 12221
Cameron Hills Extension Project - EA03-005 Go to Project
Environmental Assessment (EA) - Complete
Letter asserts that the Dehcho First Nations should be included in any consultations related to the decision-making process post-Report of Environmental Assessment for Paramount Resources' Cameron Hills Extension project, South Slave region.
Paramount expresses concerns that delays in the regulatory process might cause no work to occur during winter 2004/05 and requests the expedient completion of the regulatory process.
Letter is in response to correspondance from Paramount Resources to the Minister regarding the Cameron Hills Extension project, South Slave region.
Drybones Bay mineral exploration - EA03-006 Go to Project
Environmental Assessment (EA) - Complete
Fax re: Consultation Results
(22.09 Ko)
Re: Report of Environmental Assessment for Snowfield Development Corporation diamond exploration program.
Response from Mr. Tom Andrews
(64.83 Ko)
Letter requests Mr. Andrews to define and clarify the term "Archeaological Impact Assessment".
Meeting Summary
(78.21 Ko)
Letter regards resolution of the recommendations.
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Dehcho Bridge Corporations responses to the first round of information requests issued by the MVEIRB regarding the Mackenzie River Bridge at Fort Providence, NWT
Information Requests related to the Mackenzie River Bridge project at Fort Providence, NWT
Standard Format for Information Requests
(54.51 Ko)
Fortune Minerals Meridian Lake - EA0405-003 Go to Project
Environmental Assessment (EA) - Cancelled
Distribution List
(124.08 Ko)
Notification that the proposed development has been submitted for environmental assessment.
The preliminary screening report and subsequent referral to environmental assessment by the Mackenzie Valley Land and Water Board of the proposed Mineral Exploration at Meridian Lake by Fortune Minerals. Project was referred due to potential conflicts wi
Revision of the distribution list
(599.24 Ko)
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
For Imperial Oil's winter field geotechnical investigation program, Dehcho region.
Cover letter introducing the DAR for Imperial Oil's proposed winter field geotechnical survey program, Dehcho region. This file includes an email that included the DAR as an attachment, which was sent to the Board before the paper copy arrived.
Email re: Aerial Photos
(36.25 Ko)
Developer's Assessment Report
(20.17 Ko)
Horn River Mineral Exploration - EA0405-001 Go to Project
Environmental Assessment (EA) - Withdrawn
Dene Nation's comments on the draft Terms of Reference and Workplan for the proposed Horn River Mineral Exploration project.
MVEIRB email re: deadline for comments
(90.2 Ko)
The Draft Terms of Reference for the Environmental Assessment of the proposed Horn River mineral exploration.
Distribution List
(649 Ko)
Underground Decline and Pilot Plant - EA01-002 Go to Project
Environmental Assessment (EA) - Complete
Letter further clarifies what is required of Canadian Zinc by Appendix 1 of Water License MV2001L2-0003 and Land Use Permit MV2001C0023.