Main Content
Onglets principaux
Results
Displaying 8851 - 8875 of 12131
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT (DAR Volume# 2)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT (DAR Volume # 2)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT (DAR Volume # 2)
Appendix 1A - Plans & Drawings April 2004
(19.78 Mo)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT. (DAR Vol# 1 )
Appendix 2 - Correspondence: May 1,2003
(3.88 Mo)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT. (DAR Vol#1)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT. (DAR Vol#1)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT. (DAR Vol#1)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT. (DAR Vol# 1)
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT (DAR Vol# 1 )
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT. (DAR Vol# 1 )
Developer's Assessment Report for the Mackenzie River Bridge project at Fort Providence NWT. (DAR Vol# 1)
Letter asks for comments on the proposed project at Fort Providence and it's conformity to the Navigable Waters Protection Act requirements.
Mackenzie Gas Project - EA03-007 Go to Project
Environmental Assessment (EA) - Complete
Town of Inuvik presentation
(108.4 Ko)
Inuvik public hearing board attendance
(317.52 Ko)
Re: Town of Hay River request for public hearing.
Dehcho Geotechnical Survey - EA03-009 Go to Project
Environmental Assessment (EA) - Complete
Letter details local concerns from Sambaa K'e (Trout Lake) regarding Imperial Oil's winter field geotechnical investigation program, Dehcho region. Includes fax cover for distribution to the distribution list and two large maps.
Drybones Bay Preliminary Exploration - EA03-002 Go to Project
Environmental Assessment (EA) - Complete
Letter stating Indian and Northern Affairs acceptance of the report and the relevant recommendations contained within the report.
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
Letter forwards the draft Land Use Permit for the De Beers Canada Mining Inc. Snap Lake Diamond Project to the distribution list for comment.
Drybones Bay mineral exploration - EA03-004 Go to Project
Environmental Assessment (EA) - Complete
YKDFN do not believe that MVEIRB and MVLWB are adequate sources to inform the Federal Government on the possible impacts the development will have on the YKDFN.
Drybones Bay mineral exploration - EA03-006 Go to Project
Environmental Assessment (EA) - Complete
Letter regards the Federal and Responsible Minister considerations and responses to the decisions and reasons for decision of the environmental assessment reports prepared by MVEIRB for the North American General Resources Corporation, Consolidate Goldwin