Moose Property - EA1011-002 Go to Project
Environmental Assessment (EA) - Complete
Request for party status
(121.3 Ko)
Information Session-Lutsel'ke Sign-in Sheets
(171.03 Ko)
Prairie Creek Mine - EA0809-002 Go to Project
Environmental Assessment (EA) - Complete
Transport Canada - 2nd Round IRs
(68.89 Ko)
DFO - 2nd Round IRs
(46.93 Ko)
NRCan - 2nd Round IRs
(119.57 Ko)
Dehcho First Nations - 2nd Round IRs
(40.42 Ko)
INAC - 2nd Round IRs
(1.42 Mo)
Environment Canada - 2nd Round IRs
(51.52 Ko)
Parks Canada - 2nd Round IRs
(623.86 Ko)
IR from the Review Board to INAC
(803.13 Ko)
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
Notice from De Beers re: EIS filing
(44.48 Ko)
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
Giant DAR on Board's FTP site
(9.32 Ko)
This is a note to file about the distribution of the Developer's Assessment Report, the conformity check, and upcoming revisions of the workplan for the environmental assessment.
Giant DAR Figures (Chapters 1 through 5)
(3.75 Mo)
These are the figures from chapters 7 through 14 of the Developer's Assessment Report for the Giant Mine Remediation Project. Higher resolution versions were originally posted on the Review Board's FTP site, which is no longer available.
Giant DAR covering letter
(47.85 Ko)
Giant DAR
(4.04 Mo)
These are the figures from chapter 6 of the Developer's Assessment Report for the Giant Mine Remediation Project. Higher resolution versions were originally posted on the Review Board's FTP site, which is no longer available.
Giant Implementation Schedule
(1.05 Mo)
Nechalacho Rare Earth Element Project - EA1011-001 Go to Project
Environmental Assessment (EA) - Complete
The following document is the Katlodeeche First Nation's scoping submission for the environmental assessment of Avalon Rare Metals Inc.'s Nechalacho Rare Earth Element Project.
The following report lists the concerns that attendees raised at the Review Board's scoping session in Fort Resolution for Avalon Rare Metals Inc.'s Nechalacho Rare Earth Element Project.
The following report lists the concerns that attendees raised at the Review Board's scoping session in Lutsel K'e for Avalon Rare Metals Inc.'s Nechalacho Rare Earth Element Project.
The following document is an image of the area where Avalon proposes to locate their hydrometallurgical processing facility at the Pine Point site for the Nechalacho Rare Earth Element Project.
The following document is an image of the area where Avalon proposes to locate one of their tailings management facilities at the Pine Point site for the Nechalacho Rare Earth Element Project.
The following document is the Government of the Northwest Territories' scoping submission for the environmental assessment of Avalon Rare Metals Inc.'s Nechalacho Rare Earth Element Project.