Main Content
Onglets principaux
Results
Displaying 12176 - 12200 of 12221
Ekati - Sable, Pigeon and Beartooth Pipes expansion - EA99-004 Go to Project
Environmental Assessment (EA) - Complete
Notes re. conversation with CBC reporter Lee Selleck in response to questions about EA process for proposed BHP expansion
Cameron Hills Exploratory Drilling Project - EA00-004 Go to Project
Environmental Assessment (EA) - Complete
Paramount Resources Project Description
(2.45 Mo)
MVLWB Preliminary Screening Report Form
(731.38 Ko)
Geographic Air Survey Ltd. map
(483.48 Ko)
Fuel Cache Retrieval and Clean-up development - EA00-002 Go to Project
Environmental Assessment (EA) - Complete
Submission by CPAWS
(4.54 Mo)
Submission by CPAWS
(3.27 Mo)
Note to File
(31.82 Ko)
Fax Cover Sheet
(33.57 Ko)
Fax Cover Sheet
(30.34 Ko)
Agenda Item
(30.38 Ko)
Wool Bay exploration drilling - EA03-003 Go to Project
Environmental Assessment (EA) - Complete
Notices for joint pre-hearing conference and public hearing for several developers planning diamond exploration programs in the Drybones/Wool Bay area, Akaitcho region. Includes North American General Resources.
Map, Wool Bay and Development Study Area
(774.82 Ko)
Map, Drybones and Wool Bay
(8.1 Mo)
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
Notification of EA Media Ad
(151.34 Ko)
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
Technical and Financial Report
(6.84 Mo)
Rough notes taken by MVEIRB's secretary during the De Beers Technical Sessions.
Appendices for the De Beers Snap Lake Diamond Project Technical Memo on Preliminary Mine Closure and Reclamation Plan. This is a large file - 10MB
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
This is the template for parties to follow when submitting proposed information requests to the Review Board.
Map of Sidon Site
(2.22 Mo)
Color Map of Approximate Drill Locations
(94.21 Ko)
CanTung Mine Water License Renewal - EA02-003 Go to Project
Environmental Assessment (EA) - Cancelled
Uranium Exploration Thelon Basin (Screech Lake) - EA0506-003 Go to Project
Environmental Assessment (EA) - Cancelled
Workplan for phase one of the environmental assessment of Ur Energy's proposed uranium exploration program at Screech Lake, Akaitcho region, NWT. Phase one will be a public hearing to determine the scope of the development and assessment, to guage public
Mackenzie River Bridge - EA03-008 Go to Project
Environmental Assessment (EA) - Complete
Dehcho Bridge - Developers Assessment Report
(566.2 Ko)
Yellowknife Gold Project - EA0506-004 Go to Project
Environmental Assessment (EA) - Withdrawn
Discovery Mine Reclamation Presentation
(1.75 Mo)