Main Content
Onglets principaux
Results
Displaying 5501 - 5525 of 12131
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
EIS Section 14: Summary and Conclusions
(54.95 Ko)
Gahcho Kue EIS Plain Language Summary
(2.58 Mo)
EIS Submission Covering Letter
(462.63 Ko)
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
Review Board Letter to INAC Dec 22 2010
(272.27 Ko)
Minister's response to Deze Report of EA
(1.32 Mo)
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
Conformity Letter
(438.1 Ko)
Alternatives North Party Status
(179 Ko)
Giant geotechnical study 2011
(1.38 Mo)
This is Tier 2 risk assessment, submitted as a supporting document attached to deficiency response item 1.
Deficiency response item 4
(161.2 Ko)
Deficiency response item 3
(117.64 Ko)
Deficiency response item 2
(73.79 Ko)
Deficiency response item 1
(300.59 Ko)
Deficiency response covering letter
(34.96 Ko)
Nechalacho Rare Earth Element Project - EA1011-001 Go to Project
Environmental Assessment (EA) - Complete
Avalon representatives gave the following presentation on the Nechalacho Rare Earth Element Project at the Review Board's scoping session on the Hay River Reserve.
The following document is an updated development description for Avalon's proposed Hydrometallurgical Plant Tailings Management Facility at Pine Point for the processing of Nechalacho Mine concentrate.
The following document is a letter from the Review Board to Avalon Rare Metals Inc. regarding the development description for the environmental assessment of Avalon's Nechalacho Project.
The following document is a letter from the Review Board to the Distribution List for Avalon's Nechalacho project. The letter notifies parties that the Review Board has granted requests for extension to the comment period for the draft Terms of Reference for Avalon's Nechalacho Project.
Moose Property - EA1011-002 Go to Project
Environmental Assessment (EA) - Complete
Note to file-closure of record and status
(62.33 Ko)
Mackenzie Gas Project - EIR0405-001 Go to Project
Environmental Impact Review (EIR) - Complete
Volume 2: Technical considerations: Implementing the decision.Chapter 5: Routing and land matters, Chapter 6: Facilities, Chapter 7: Economic feasibility, Chapter 8: Toll, tariff and access provisions, Chapter 9: Consultation, Chapter 10: National Energy Board lifespan regulation, Chapter 11: Disposition, and Appendices
Volume 1: Respecting all voices: Our journey to a decision. Part 3: Production, The transmission pipelines and Part 4: Our decision
Volume 1: Respecting all voices: Our journey to a decision. Part 1: The project as a whole and Part 2: Production, gathering and processing systems
Volume 2: Technical considerations: Implementing the decision. Chapter 1: Introduction, Chapter 2: Regulatory review process, Chapter 3: Environmental and socio-economic matters, and Chapter 4: Development fields
Mineral Exploration Program - EA0506-006 Go to Project
Environmental Assessment (EA) - Cancelled
This letter from INAC to the NWT Metis Nation proposes modifications to measures from the Sidon Report of Environmental Assessment. (Note: This document has been re-posted in 2011 due to a technical problem with the original posting)
This letter from INAC to Akaitcho communities proposes modifications to measures from the Sidon Report of Environmental Assessment. (Note: This document has been re-posted in 2011 due to a technical problem with the original posting)