Main Content
Onglets principaux
Results
Displaying 2826 - 2850 of 12191
Jay Project - EA1314-01 Go to Project
Environmental Assessment (EA) - Complete
December Engagement Meeting Commitments
(1.83 Mo)
This is the Human and Health Risk Assessment Appendices Report submitted by Dominion Diamond in response to the Adequacy Review.
This is the Human and Health Risk Assessment Report submitted by Dominion Diamond in response to the Adequacy Review.
Adequacy Review Responses 02Feb2015
(286.6 Ko)
This is a letter from the Review Board to Dominion re Adequacy of caribou modeling.
MVEIRB response to Dominion letter of Jan 22
(479.88 Ko)
This is the Russell energy-protein model presentation shown by Don Russell at the January 19, 2015 caribou technical meeting.
This is the DAR energy model presentation shown by Dominion at the January 19, 2015 caribou technical meeting.
This document contains summary notes from the caribou technical meeting on January 19, 2015.
This is a letter from Dominion to the Review Board re the Jay Project timeline.
Adequacy Review responses from Dominion Vol 6 of 6 Thermal Assessment for Misery Pit Lake.
Adequacy Review responses submitted by Dominion Vol 5 of 6 Accidents and Malfunctions Risk Assessment.
Adequacy Review responses from Dominion Vol 4 of 6 Lac De Gras Hydrodynamic Model updates.
Adequacy Review responses submitted by Dominion Vol 3 of 6 Air quality assessment update.
Adequacy Review responses Vol 2 Socio-Ec
(273.04 Ko)
Adequacy Review responses Vol 1
(5.15 Mo)
Rangifer volume 34, 2014 - Special Issue No. 22 White et al, submitted by an independent consultant, Don Russell.
This is the energy-protein and population modeling for the Kiggavik Project (NIRB review) submitted by an independent consultant, Don Russell.
This is the CV for Don Russel who will participate in the modeling technical meeting as an independent consultant.
This is the agenda for a technical meeting on protein-energy modeling.
This Note to File describes the differences between an Adequacy Review and a Conformity Check.
Information Request Phase instructions
(449.25 Ko)
Prairie Creek All Season Road - EA1415-01 Go to Project
Environmental Assessment (EA) - Complete
This is a letter from Canadian Znc Corporation to the Review Board re projected DAR submission date.
Review Board response to PC letter
(70.98 Ko)
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
Reviewer comments on the revised TOR
(66.32 Ko)