Main Content
Onglets principaux
Results
Displaying 2901 - 2925 of 12221
Jay Project - EA1314-01 Go to Project
Environmental Assessment (EA) - Complete
Jay DAR Adequacy Review
(721.04 Ko)
Caribou advisor - Anne Gunn resume
(149.23 Ko)
This is the cover letter for the Jay Project Factual Reports Vol 1 Proposed Dikes and Volume 2 Proposed Jay Pit Area.
This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part D.
Jay Pit Factual Report - Volume 2, Part C
(21.93 Mo)
Jay Pit Factual Report - Volume 2, Part B
(21.32 Mo)
Jay Pit Factual Report - Volume 2, Part A
(22.98 Mo)
Jay Dike Factual Report - Volume 1 Part D
(16.87 Mo)
Jay Dike Factual Report - Volume 1 Part C
(38.54 Mo)
Jay Dike Factual Report - Volume 1 Part B
(38.46 Mo)
Jay Dike Factual Report - Volume 1 Part A
(28.84 Mo)
Dominion Information Sessions Dec 11-12
(252.5 Ko)
Geotech advisor CV_B Watts
(81.94 Ko)
This is a response letter from Dominion Diamond to Lutsel K'e Dene First Nation regarding traditional land use and traditional knowledge reports.
DAR Table of Contents with hyperlinks
(252.11 Ko)
Note to file - DAR submission and next steps
(359.22 Ko)
16B_Annex_XVI_App_B_Arky_BSA_Sites
(61.6 Ko)
16A_Annex_XVI_App_A_Arky_RSA_Sites
(141.78 Ko)
16_Annex XVI_Archaeology_Baseline
(5.27 Mo)
15_Annex XV_Socio_Economic_Baseline
(10.77 Mo)
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
GNWT's comments on the Terms of Reference
(539.47 Ko)
GNWT's comments on the Terms of Reference
(740.48 Ko)
A cover letter for the revised Terms of Reference.