Main Content
Onglets principaux
Results
Displaying 2801 - 2825 of 12131
Jay Project - EA1314-01 Go to Project
Environmental Assessment (EA) - Complete
DDEC regulator meeting Dec 11th and 12th 2014
DDEC regulator meeting Dec 11th and 12th 2014
Regulator meeting Dec 11th and 12th 2014
This is the Jay Developer's Assessment Report Addendum - Cumulative Effects including Sable Pit. It addresses item 5.1 of the Review Board's Adequacy Review.
This is a letter from the Northern Projects Management Office describing the participation and status of federal departments in the Jay Project EA.
Aquatics advisor - Neil Hutchinson resume
(240.82 Ko)
Water Quality advisor - Kathy Racher CV
(167.33 Ko)
Jay DAR Adequacy Review cover letter
(410.81 Ko)
Jay DAR Adequacy Review
(721.04 Ko)
Caribou advisor - Anne Gunn resume
(149.23 Ko)
This is the cover letter for the Jay Project Factual Reports Vol 1 Proposed Dikes and Volume 2 Proposed Jay Pit Area.
This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part D.
Jay Pit Factual Report - Volume 2, Part C
(21.93 Mo)
Jay Pit Factual Report - Volume 2, Part B
(21.32 Mo)
Jay Pit Factual Report - Volume 2, Part A
(22.98 Mo)
Jay Dike Factual Report - Volume 1 Part D
(16.87 Mo)
Jay Dike Factual Report - Volume 1 Part C
(38.54 Mo)
Jay Dike Factual Report - Volume 1 Part B
(38.46 Mo)
Jay Dike Factual Report - Volume 1 Part A
(28.84 Mo)
Dominion Information Sessions Dec 11-12
(252.5 Ko)
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
The GNWT is requesting an extension till Jan 23, 2015.
GNWT's comments on the Terms of Reference
(539.47 Ko)
GNWT's comments on the Terms of Reference
(740.48 Ko)
A cover letter for the revised Terms of Reference.
Prairie Creek All Season Road - EA1415-01 Go to Project
Environmental Assessment (EA) - Complete
Letter from Parks Canada to the Review Board requesting clarification on items in the "Reasons for Decision on the Scope of the EA"