Main Content
Primary tabs
Results
Displaying 9401 - 9425 of 12202
Drybones Bay mineral exploration - EA03-004 Go to Project
Environmental Assessment (EA) - Complete
Pre-hearing will now be on November 4, 2003 and the public hearing will be held on November 18/19, 2003
DFO Letter Re: NSV Response to IR
(445.65 KB)
Comments on the Draft Cumulative Effects Study
(174.78 KB)
Comments on the Draft Cumulative Effects Study
(174.78 KB)
Comments on the Draft Cumulative Effects Study
(174.78 KB)
YKDFN comments on the draft cumulative effects study
Pre-Hearing Conference Guide and Worksheet
(666.2 KB)
Draft CE Maps
(993.42 KB)
CanTung Mine Water License Renewal - EA02-003 Go to Project
Environmental Assessment (EA) - Cancelled
NATC Security Requirements
(1.5 MB)
Drybones Bay mineral exploration - EA03-006 Go to Project
Environmental Assessment (EA) - Complete
Request for additional time to prepare Information Requests considering the delay in finalizing the DAR for Snowfield Development's Drybones Bay exploration project.
Drybones Bay Preliminary Exploration - EA03-002 Go to Project
Environmental Assessment (EA) - Complete
Various Email Covers
(68.71 KB)
Letter from the Department of Fisheries and Oceans regarding the draft Cumulative Effects Report.
Letter provides the Canadian Arctic Resource Committee's comments on the draft Cumulative Effects Study.
Ice Road Document
(8.42 MB)
Pre-Hearing Conference Participation Form
(13.27 KB)
Pre-Hearing Conference Guide
(14.25 KB)
Letter attaches a pre-hearing conference guide and worksheet for the Consolidated Goldwin Ventures pre-hearing conference.
Email from NSMA to MVEIRB re: DRAFT CE Maps
(31.38 KB)
Email attaches draft maps of the environmental assessment area for distribution.
Correspondence between MVEIRB and Terra Firma Consultants regarding comment period.
Fax to Distribution List
(390.28 KB)
Fax Cover Sheet
(70.63 KB)
Distributes the comments on the Drybones/Wool Bay Area environmental assessments to parties.
Email forwards the CGV, NAGRC and NSV Issues Summary Table to the distribution list.
Summit Creek Exploration Well - EA03-001 Go to Project
Environmental Assessment (EA) - Complete
NEB as the designated regulatory agency has decided to adopt MVEIRB's recommendations.