Main Content
Primary tabs
Results
Displaying 7351 - 7375 of 12133
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
Drill logs for holes near the infiltration basin and some near the R190 deposit. This was designed to show consistency in the overburden depths between the two. Attachment 1 show the numbered locations of drill holes on a map; Attachment 2 has drill logs
Data on Water Discharge Levels
(677.35 KB)
After further investigation Tamerlane has committed to using injection wells.
A cover letter from Jesse Jasper of Environment Canada, explaining the reasons for putting the National Hydrological Research institute report by Udo Weyer (see in 6 parts on MVEIRB website - Technical Reports) and another study by Hocking, D. (1975).
Weyer, K.U. Salt dissolution, karsts geology, glacial events and groundwater flow in the Pine Point region, NWT. Vol (1). pgs 1-121.
Weyer, K.U. Salt dissolution, karsts geology, glacial events and groundwater flow in the Pine Point region, NWT. Vol (1). pgs 1-121.
Weyer, K.U. Salt dissolution, karsts geology, glacial events and groundwater flow in the Pine Point region, NWT. Vol (1). pgs 121-240.
Weyer, K.U. (1983). Salt dissolution, karst glacial, glacial events and groundwater flow in the Pine Point Region, NWT.
Weyer, K.U. Salt dissolution, karsts geology, glacial events and groundwater flow in the Pine Point region, NWT. Vol (1). pgs 1-121.
Weyer, K.U. Salt dissolution, karsts geology, glacial events and groundwater flow in the Pine Point region, NWT. Vol (1). pgs 1-121.
This document constitutes Appendix 3 (Chemical Analysis of Groundwater) from the Brown,Erdman and Associates pump test from 1980, and was confirmed by experts at the Technical Sessions held in Hay River to be an acceptable representation of likely groundw
Developer's Presentation at Technical Sessions
(757.02 KB)
An update from Tamerlane Ventures identifying changes to the power source plans for the PPPP, as of July 12, 2007, indicating a transition to hydro power from the Taltson Dam during the course of operations. Also included is correspondence between the dev
Great Bear Lake Exploration Project - OBD0708-001 Go to Project
Other Board Decision - Complete
July 21, 2007 letter from SLWB to Review Board
(587.32 KB)
MVEIRB July 13 2007 letter to HBR
(99.82 KB)
DRRC correspondence July 13 07
(30.57 KB)
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
The letter is a response to Deze Energy's Land Use permit application.
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
Developer workplan comments
(17.97 KB)
Developer ToR comments
(96.7 KB)
DKFN ToR comments
(27 KB)
YKDFN ToR comments
(171 KB)
Parks Canada ToR comments
(26.92 KB)
NRCan ToR comments
(415.96 KB)
INAC ToR Comments
(476.01 KB)