Displaying 6401 - 6425 of 12202
NICO Project - EA0809-004 Go to Project
Environmental Assessment (EA) - Complete
NICO Project Summary- Figure 2- Drainage Areas
(372.62 KB)
This is Figure 1 from the summary description of the NICO Project. It shows the project study area.
NICO Project Summary April 2 09
(245.87 KB)
NICO Scoping Letter- April 2 09
(287.69 KB)
Mineral Exploration at Howard's Pass (Selwyn Project) - EA0708-001 Go to Project
Environmental Assessment (EA) - Complete
A brief presentation by the developer outlining the main issues to address in the Tulita Community Hearing.
Parks Canada Presentation for Tulita Hearing
(368.11 KB)
INAC Presentation for Selwyn Hearing in Tulita
(116.06 KB)
Submission cover letter preceding the presentation for the Tulita Hearing.
YESAB Recommendations March 2009
(272.18 KB)
PWNHC Evidence - Selwyn EA Hearing - Tulita
(55.15 KB)
GNWT Presentation - Selwyn EA Hearing - Tulita
(385.85 KB)
A note to file regarding the pre-hearing conference that was held at the Review Board office on March 23, 2009. Document contains a list of attendees and information for the upcoming Hearing in Tulita.
A map indicating locations of the Naats'ihch'oh National Park Reserve Interim Withdrawal Area, Nahanni National park Reserve and its Expansion Interim Withdrawal, in the NWT and Yukon Region. This Map was submitted to the Review Board by Parks Canada.
Some additional information to prepare parties for the pre-hearing conference taking place March 23, 2009 at the Board Room of the Mackenzie Valley Review Board.
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
A letter notifying the distribution list of the Taltson Expansion Project that the Developers Assessment Report has been found in conformity with the final Terms of Reference for this EA.
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
CV of Dr. Franco Oboni
(171.53 KB)
CV of Jerome Nriagu
(155.41 KB)
CVs of BGC Engineering's team
(2.15 MB)
Notification of expert advisory services
(112.23 KB)
Draft Work Plan
(183.83 KB)
Draft Terms of Reference
(314.63 KB)
Prairie Creek Mine - EA0809-002 Go to Project
Environmental Assessment (EA) - Complete
Note to file - discussion with BC EAO
(28.28 KB)
An initial response letter from Canadian Zinc Corporation to the Review Board's March 5, 2009 ruling on scope of development issues, reserving a final response until after the final terms of reference and work plan for the environmental assessment have be
Yellowknife Gold Project (2008) - EA0809-003 Go to Project
Environmental Assessment (EA) - Ongoing
This document contains comments from Transport Canada regarding the draft Terms of Reference for the environmental assessment of Tyhee NWT Corp.'s 2008 Yellowknife Gold Project.
This letter from Indian and Northern Affairs Canada (INAC) to the Review Board outlines INAC's position on the status of Darryl Bohnet in the environmental assessment of Tyhee NWT Corp.'s Yellowknife Gold Project, as well as for the Working Plan for the e