Main Content
Primary tabs
Results
Displaying 3926 - 3950 of 12199
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
Analysis and results of the summer 2009 air quality monitoring program to establish a baseline for fugitive emissions pertaining to the tailings areas and other sources at the Giant Mine site.
Analysis and results of the summer 2008 air quality monitoring program to establish a baseline for fugitive emissions pertaining to the tailings areas and other sources at the Giant Mine site.
Analysis and results of the 2006 summer air quality monitoring program to establish baseline fugitive emissions from the tailings areas and other disturbed areas at the Giant Mine site.
Analysis and results of the 2005 summer air quality monitoring program to establish a baseline for fugitive emissions from the tailings areas and other disturbed areas at the Giant Mine site.
Letter from the public, Mr. Craig Yeo, outlining concerns with the proposed Giant Mine Remediation Project, specifically public safety, the release of contaminated water into Yellowknife Bay, funding for perpetual care, and independent oversight.
Giant Mine EA Schedule Delays
(134.7 KB)
Yellowknife Gold Project (2008) - EA0809-003 Go to Project
Environmental Assessment (EA) - Ongoing
This letter explains the content and purpose of the Yellowknife Gold Project Feasibility Study and separates it from the DAR.
NICO Project - EA0809-004 Go to Project
Environmental Assessment (EA) - Complete
TG Access Road Presentation
(501.69 KB)
TG traditional knowledge presentation
(2.04 MB)
TG Closure Presentation
(745.95 KB)
TG Water Quality presentation
(1.25 MB)
TG Caribou Presentation
(1.38 MB)
TG Socio-Economic presentation
(711.28 KB)
This is the NRCan presentation for the NICO hearings - hydrogeology and geotech.
This is the presentation from NRCan for the NICO heairngs - access road.
This is a document submitted by Fortune Minerals Limited in response to NRCan techncial report recommendations.
This is a letter from the Tlicho Government to the Review Board regarding section 127.1 of the MVRMA in response to a letter from the Review Board dated July 31, 2012.
NRCan - Fortune July 26 meeting report
(627.64 KB)
Fortune presentation - WQ Operations
(553.54 KB)
This is the Fortune Minerals Limited presentation for the NICO hearings - Water quality conceptual model closure.
This is the Fortune Minerals Limited presentation for the NICO hearings - Wildlife Effects Monitoring Program.
This is the Fortune Mienrals presentation for the NICO hearings - Project Description.
Fortune presentation - Socio-Economics
(4.27 MB)
This is the Fortune Minerals Limited presentation for the NICO hearings - NICO Project Access Road.
This is the Fortune Minerals Limited presentation for the NICO hearings - Constructed Wetland Treatment System.