Displaying 3851 - 3875 of 12133
NICO Project - EA0809-004 Go to Project
Environmental Assessment (EA) - Complete
This is a report titled "Evalutation of the Effectiveness of Biological Treatment of Mine Waters, MPERG 2010-4" provided by Fortune Minerals in response to a request from WLWB during the hearings for references to in-pit treatment of ope pit lakes.
GNWT - Fortune Meeting Minutes - August 28 2012
(764.82 KB)
TG Access Road Presentation
(501.69 KB)
TG traditional knowledge presentation
(2.04 MB)
TG Closure Presentation
(745.95 KB)
TG Water Quality presentation
(1.25 MB)
TG Caribou Presentation
(1.38 MB)
TG Socio-Economic presentation
(711.28 KB)
This is the NRCan presentation for the NICO hearings - hydrogeology and geotech.
This is the presentation from NRCan for the NICO heairngs - access road.
This is a document submitted by Fortune Minerals Limited in response to NRCan techncial report recommendations.
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
A letter from the public, Mr. Robert Wilson, expressing concerns with the Giant Mine Remediation Project, specifically regarding water quality and public safety.
This correspondence from the Review Board specifies that the developer has until 5:00 pm on Friday August 31st, 2012 to submit its hearing presentations.
Giant Mine Brochure
(2.04 MB)
Collection of Giant Mine Media Coverage
(2.65 MB)
YKDFN Note on Giant Public Hearing Submissions
(604.41 KB)
Analysis and results of the summer 2009 air quality monitoring program to establish a baseline for fugitive emissions pertaining to the tailings areas and other sources at the Giant Mine site.
Analysis and results of the summer 2008 air quality monitoring program to establish a baseline for fugitive emissions pertaining to the tailings areas and other sources at the Giant Mine site.
Analysis and results of the 2006 summer air quality monitoring program to establish baseline fugitive emissions from the tailings areas and other disturbed areas at the Giant Mine site.
Analysis and results of the 2005 summer air quality monitoring program to establish a baseline for fugitive emissions from the tailings areas and other disturbed areas at the Giant Mine site.
Letter from the public, Mr. Craig Yeo, outlining concerns with the proposed Giant Mine Remediation Project, specifically public safety, the release of contaminated water into Yellowknife Bay, funding for perpetual care, and independent oversight.
Giant Mine EA Schedule Delays
(134.7 KB)
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
This is a letter from De Beers Canada regarding agendas and meeting notes between DFO and De Beers on a draft compensation plan.
Sahtu Unconventional Oil Project - EA1213-01 Go to Project
Environmental Assessment (EA) - Withdrawn
Land Use Permit and Water Licence Application
(206.63 KB)
Yellowknife Gold Project (2008) - EA0809-003 Go to Project
Environmental Assessment (EA) - Ongoing
This letter explains the content and purpose of the Yellowknife Gold Project Feasibility Study and separates it from the DAR.