Main Content
Developer's Assessment Report/Environmental Impact Statement
Displaying 94 Document(s)
The Review Board has received the outstanding adequacy responses
CanZinc's responses to the outstanding adequacy items described in the Review Board's "Reasons for Decision on the Adequacy of the Developer's Assessment Report" released on Dec 21, 2015
DAR Appendix 1 E v2 contains Liard River barge ramps for both the north and south shore of the river. Original DAR Appendix 1_E was missing the south shore barge ramp information.
This is a letter from CanZinc from September 11, 2015 regarding an Invasive Plant Management Plan.
Management Plans Hyperlinked
(101.75 KB)
Report on water sources referenced in the DAR Addendum
copy of the most recent draft wildlife management plan for the winter road from the MVLWB registry
Email update from CanZinc regarding approximate timeline for outstanding adequacy item submission
Letter from the Review Board to CanZinc in response to their January 29th letter regarding outstanding DAR adequacy items
CanZinc comments on Risk Assessor SOW
(97.91 KB)
GNWT comment on Risk Assessor SOW Feb-2-2016
(349.35 KB)
CZN Update on Adequacy items 2-Feb-2016
(46.92 KB)
Third Party Risk Assessor Scope of Work and CVs
(696.51 KB)
Letter from CanZinc to the MVEIRB regarding adequacy issues
AEMP Design Plan - 31 January 2014
(15.53 MB)
Hazardous Substances Plan (draft) September 2012
(504.93 KB)
Wildlife management plan (draft) February 2011
(401.09 KB)
Road Operations Plan (winter), 2012
(722.81 KB)
Flight Impact Management Plan, August 2012
(42.55 KB)
Contaminant Loading Management Plan, August 2012
(316.55 KB)
This is the AQEMMP referenced in Section 4.1.7 of the September 2015 DAR Addendum.
Note to file describing a teleconference between Review Board staff and Canadian Zinc.
Appendix 2
(29.12 MB)
Appendix 14
(20.63 KB)
Appendix 13
(8.68 MB)
Appendix 12
(16.15 KB)
Appendix 11
(4.75 MB)
Appendix 10
(3.95 MB)
Appendix 9
(25.75 MB)
Appendix 8
(4.49 MB)
Appendix 7
(20.7 MB)
Appendix 6
(1.65 MB)
Appendix 5
(235.47 KB)
Appendix 4
(5.51 MB)
Note to File_Final statement on airstrip
(452.33 KB)
Reasons for Decision on the adequacy of the DAR
(201.88 KB)
DAR and DAR Addendum Hyperlinked TOC
(309.33 KB)
CZN Letter to MVEIRB re Airstrip Dec 11 2015
(26.89 KB)
Mapping Summary Report for the Prairie Creek All-Season Road, prepared by Tetra Tech EBA as part of the DAR adequacy review requirements
Parks Canada response to MVEIRB re Airstrip
(51.46 KB)
Letter to Parks Canada_RE Airstrip_6Nov2015
(116.27 KB)
CanZinc response to MVEIRB 2-Oct-2015 letter
(56.85 KB)
Letter to CanZinc_DAR AddendumAdequacy
(145.07 KB)
App E - Tera Tech Wildlife & Veg Report
(62.73 MB)
App A - Allnorth Road Eng
(23.62 MB)
DAR Addendum
(625.92 KB)
App F Tetra Tech Terrain
(58.62 MB)
Letter to CanZinc_DAR Addendum_9Sept2015
(101.61 KB)
Golder Caribou Occupancy Survey 25 JUN 2014
(14.06 MB)
2007 Wildlife Road and Alternate Route Report
1994 Prairie Creek Project Vegetation and Wildlife Initial Environmental Evaluation
1982 Beak Wildlife Studies Addendum
Beak 1981 Vegetation and Wildlife Studies
App G - Analytical Certificates
(548.79 KB)
App D - Golder Air Quality Assessment
(886.27 KB)
App C - Hatfield aquatics
(3.84 MB)
App B - Tetra Tech flood estimation
(399.26 KB)
email 17-Aug-2015_update on progress
(69.03 KB)
emails regarding clarification for items in the Adequacy Review for the CanZinc project
Note to File_update for work plan
(101.76 KB)
This letter is to CanZinc in response to the items raised in its June 16, 2015 letter regarding the Adequacy Review.
CanZinc letter to MVEIRB RE: Adequacy Review
(808.04 KB)
Note to File_Adequacy Review Meeting_15June2015
(101.26 KB)
This is an email string submitted by Canzinc that includes the Tetratech response to CanZinc regarding DAR content.
Note to File May 28 Telecon with CZN
(101.64 KB)
This is an email from Can Zinc to the Review Board that clarifiees questions regarding the DAR.
EA1415-01_CanZinc DAR Adequacy Review_Final
(763.07 KB)
Adequacy Review cover letter
(158.92 KB)
CanZinc's response to the Review Board's questions regarding the inclusion of engineering technical reports.
These are the CVs for the Review Board's technical consultant, Knight Piesold Ltd, for the CanZinc Prairie Creek all season road EA
Work Plan_7May2015
(225.4 KB)
Letters from the GNWT groups regarding participation in the EA including the KTFN, DFN, ADK and Metis local 67.
GNWT Letters to Aboriginal Groups
(147.39 KB)
Caribou Occurrence
(7.46 MB)
Appendix 3
(3.03 MB)
Appendix 1_I
(22.98 MB)
Appendix 1_H
(2.31 MB)
Appendix 1_G
(288.72 KB)
Appendix 1_F
(507.41 KB)
Appendix 1_E
(6.77 MB)
Appendix 1_D
(29.33 MB)
Appendix 1_C
(526.92 KB)
Appendix 1_B
(28.56 MB)
Appendix 1_A
(47.07 MB)
EA1415-01_DAR_Appendices 2-14 Vol 3
(107.76 MB)
EA1415-01_ DAR Appendix 1 Vol 2
(137.51 MB)
EA1415-01 Developer's Assessment Report
(14.48 MB)
This is a letter from Canadian Znc Corporation to the Review Board re projected DAR submission date.