Main Content
Onglets principaux
Results
Displaying 7276 - 7300 of 12221
Screech Lake - EA0607-003 Go to Project
Environmental Assessment (EA) - Complete
Luksenberg letter to INAC
(52.14 Ko)
LKFN Letter to INAC
(145.12 Ko)
CZN Letter to INAC
(122.38 Ko)
CPAWS Letter to INAC
(94.7 Ko)
Bayswater Letter to INAC
(155.79 Ko)
Athabasca Denesuline Letter to INAC
(127.72 Ko)
Ministerial Acceptance Letter
(133.23 Ko)
Crab Lake Mineral Exploration - EA0708-005 Go to Project
Environmental Assessment (EA) - Withdrawn
Response to MVEIRB's request for comments on the issue of how to most effectively run four separate EA's in the Upper Thelon Basin.
Response to MVEIRB's request for comments on the issue of how to most effectively run four separate EA's in the Upper Thelon Basin.
Citizen response to request for comments
(25.04 Ko)
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
Tamerlane Air Quality Monitoring Undertaking
(262.73 Ko)
MVEIRB memo to Distribution list on clarification of undertakings accepted by specific parties and information on the deadlines and date of closure of the public record.
Copy of Mine Site Reclamation Policy for the NWT
(341.24 Ko)
DCC Hearing Presentation Speaking Notes
(83.05 Ko)
FRMC FINAL Hearing Presentation
(12.77 Mo)
DKFN revised FINAL hearing presentation
(11.45 Mo)
GNWT Public Hearing Presentation
(462.31 Ko)
South Boomerang Lake Mineral Exploration - EA0708-002 Go to Project
Environmental Assessment (EA) - Withdrawn
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin. From an expedition outfitter in the region.
North Boomerang Lake Mineral Exploration - EA0708-003 Go to Project
Environmental Assessment (EA) - Withdrawn
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin. From an expedition outfitter in the region.
EL Lake Mineral Exploration - EA0708-004 Go to Project
Environmental Assessment (EA) - Withdrawn
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin. From an expedition outfitter in the region.
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
Application for a Type "A" Water License
(1.49 Mo)