Main Content
Onglets principaux
Results
Displaying 7251 - 7275 of 12191
Screech Lake - EA0607-003 Go to Project
Environmental Assessment (EA) - Complete
Athabasca Denesuline Letter to INAC
(127.72 Ko)
Ministerial Acceptance Letter
(133.23 Ko)
Crab Lake Mineral Exploration - EA0708-005 Go to Project
Environmental Assessment (EA) - Withdrawn
Response to MVEIRB's request for comments on the issue of how to most effectively run four separate EA's in the Upper Thelon Basin.
Response to MVEIRB's request for comments on the issue of how to most effectively run four separate EA's in the Upper Thelon Basin.
Citizen response to request for comments
(25.04 Ko)
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
Tamerlane Air Quality Monitoring Undertaking
(262.73 Ko)
MVEIRB memo to Distribution list on clarification of undertakings accepted by specific parties and information on the deadlines and date of closure of the public record.
Copy of Mine Site Reclamation Policy for the NWT
(341.24 Ko)
DCC Hearing Presentation Speaking Notes
(83.05 Ko)
FRMC FINAL Hearing Presentation
(12.77 Mo)
DKFN revised FINAL hearing presentation
(11.45 Mo)
GNWT Public Hearing Presentation
(462.31 Ko)
South Boomerang Lake Mineral Exploration - EA0708-002 Go to Project
Environmental Assessment (EA) - Withdrawn
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin. From an expedition outfitter in the region.
North Boomerang Lake Mineral Exploration - EA0708-003 Go to Project
Environmental Assessment (EA) - Withdrawn
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin. From an expedition outfitter in the region.
EL Lake Mineral Exploration - EA0708-004 Go to Project
Environmental Assessment (EA) - Withdrawn
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin. From an expedition outfitter in the region.
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
Application for a Type "A" Water License
(1.49 Mo)
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
Taltson Distribution list
(62 Ko)
MVEIRB Notification to Developer
(188.69 Ko)
Issued by Mackenzie Valley Land and Water Board and reasons for decision for an EA referral
EA Referral for Deze Energy Corporation
(113.64 Ko)