Main Content
Onglets principaux
Results
Displaying 7301 - 7325 of 12131
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
Media release
(414.27 Ko)
Pine Point Pilot Project - EA0607-002 Go to Project
Environmental Assessment (EA) - Complete
Katlodeeche First Nation Party Status
(27.66 Ko)
Notice of October 16 Public Hearing
(29.72 Ko)
DKFN questions about Injection wells
(74.77 Ko)
Following up on an undertaking from the Technical Sessions in July, the Review Board staff identified specific topographic and drainage basin images from material already on the public record - from a study done by Beak Consultants for Western Mines in 19
Second Round IR responses received from Tamerlane Ventures on August 15, 2007. Responses to IR # 35 and #38 are not included, and some other IRs cite forthcoming information. The Review Board has requested better quality map images to accompany this infor
Article 4 of 4 on boom bust effects
(3.57 Mo)
Article 3 of 4 on boom bust effects
(189.99 Ko)
Article 2 of 4 on boom bust effects
(2.91 Mo)
Article 1 of 4 on boom bust effects -
(1.29 Mo)
Second Round of IR's
(147.23 Ko)
Comments received on August 9, 2007 from the Deninu Kue First Nation, calling for a public hearing in the community of Fort Resolution for the Pine Point Pilot Project EA.
Letter of August 9, 2007 from the FRMC to the Review Board identifying two general areas of concern that they feel merit further study: Woodland Caribou and impacts of mining on water and aquatic life in the Great Slave Lake near the proposed project.
correspondence from Environment Canada and the GNWT related to their opinion on the need for site specific air quality assessment
Correspondence between the Katlodeeche First Nation and the federal minister relating to concerns from the KFN about EA timelines.
A traditional knowledge study, confirmed for public release by the KFN on August 8, 2007. Note also that the cover letter requests that the KFN be allowed to defer comments on the need for public hearings until after a meeting with the Deninu K'ue First N
North Boomerang Lake Mineral Exploration - EA0708-003 Go to Project
Environmental Assessment (EA) - Withdrawn
Letter notifies the developer of the referral of their project to EA.
Attached is the form to remain on distribution list for this EA and a copy of the initial distribution list.
Letter from MVLWB to MVEIRB re: Referral to EA
(404.39 Ko)
South Boomerang Lake Mineral Exploration - EA0708-002 Go to Project
Environmental Assessment (EA) - Withdrawn
Notification to the developer that their proposed Boomerang Lake Mineral Exploration project (amendment) has bee referred to EA by MVEIRB under its own motion.
Letter from MVEIRB to MVLWB
(164.56 Ko)
MVLWB Screening Report
(1.08 Mo)
Letter requests that MVLWB hold off on their decision on this file until MVEIRB has had an opportunity to review the file.
Great Bear Lake Exploration Project - OBD0708-001 Go to Project
Other Board Decision - Complete
PAS Response to IR 1.3
(123.98 Ko)
SRRB IR Responses
(43.5 Ko)