Prairie Creek Mine - EA0809-002 Go to Project
Environmental Assessment (EA) - Complete
Scoping Submission from Fort Simpson
(135.93 Ko)
Introduction to environmental assessment presentation provided by Jessica Simpson, Review Board staff, at the Scoping Sessions for the Prairie Creek Mine in the Dehcho Region, September 30-October 3, 2008.
The introductory presentation by Review Board staff for each of the scoping sessions for the Prairie Creek Mine environmental assessment.
A list of Prairie Creek Mine Components
(21.57 Ko)
October 9th Technical Issues Scoping Session
(59.34 Ko)
This is the Presentation given by Canadian Zinc Corporation during the community scoping meeting September 30 to October 3, 2008 regarding the potential Environmental Impacts to Prairie Creek Mine.
This is the Project Description Presentation given by Canadian Zinc Corporation during the scoping meetings in Nahanni Butte, Fort Liard, Fort Simpson and Wrigley, September 30 to October 3, 2008.
Summary of Project Description
(29.66 Ko)
LKFN Letter of Support for Prairie Creek Mine
(182.26 Ko)
Note to File regarding a September 29/08 site visit to Prairie Creek Mine with MVEIRB staff, a CanZinc representative and INAC staff in attendance.
MOU Between Parks Canada and CZN
(164.58 Ko)
Canadian Zinc's response to the request from the Review Board for identification of previously existing information it feels is relevant to the current environmental assessment of the Prairie Creek Mine.
Canadian Zinc Corp. EA Scoping Position
(34.5 Ko)
Evening Agenda for Fort Simpson Scoping Session
(495.16 Ko)
Daytime Agenda for Dehcho Scoping Sessions
(509.3 Ko)
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
INAC has expressed an interest in conducting a freeze optimization study, as described in Undertaking #1, submitted prior to the scoping hearing for Giant Mine. This correspondence includes a request from the Review Board for additional information o
Letter from the NWT Mining Heritage Society regarding heritage buildings and materials. This letter details various interests that the Mining Heritage Society holds at the Giant Mine site. This includes buildings, equipment and a potential transfer of l
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
Note to File regarding a September 15/08 meeting between MVEIRB staff and Deze' Energy Corp. representatives. Main discussion topics: delay of the DAR until late November, questions pertaining to DAR content, and project design changes.
North Boomerang Lake Mineral Exploration - EA0708-003 Go to Project
Environmental Assessment (EA) - Withdrawn
Notice of Receipt of REA
(232.32 Ko)
South Boomerang Lake Mineral Exploration - EA0708-002 Go to Project
Environmental Assessment (EA) - Withdrawn
Notice of Receipt of REA
(233.53 Ko)
EL Lake Mineral Exploration - EA0708-004 Go to Project
Environmental Assessment (EA) - Withdrawn
Notice of Receipt of REA
(232.05 Ko)
Crab Lake Mineral Exploration - EA0708-005 Go to Project
Environmental Assessment (EA) - Withdrawn
Notice of Receipt of REA
(232.5 Ko)
Yellowknife Gold Project (2008) - EA0809-003 Go to Project
Environmental Assessment (EA) - Ongoing
PowerPoint presentation from Tyhee NWT Corp. regarding the 2008 Yellowknife Gold Project in preparation for the upcoming scoping sessions October 16th/17th.
MVEIRB Letter to YKDFN Regarding Scheduling
(33.51 Ko)
YGP Scoping Scheduling Letter
(77.82 Ko)