Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
This portion of the "NSMA grouped submissions for Taltson" sent in by NSMA is unreadable on the public registry submission dated January 29, 2010. This is clearer version of the same document.
NSMA grouped submissions for Taltson Project
(18.03 Mo)
Carter Family Submission- Appendices
(8.04 Mo)
Carter Family Written Submission
(282.7 Ko)
Notice: Partial Closure of Public Registry
(516.45 Ko)
Undertaking submission from Deze Energy to the Review Board given to the proponent at the public hearing in Dettah January 14 and 15, 2010.
Undertaking from Deze Energy Cover Letter
(63.72 Ko)
Undertaking submission from DFO
(4.42 Mo)
This is a submission from Indian and Northern Affairs Canada pursuant to an undertaking from the hearing. It explains the process for issuing a license of occupation.
Note to File re: Carter extension request
(19.37 Ko)
Chandler and Lalonde 1998 Paper
(390.89 Ko)
Letter from R. Kesselring
(45.75 Ko)
INAC Clarification re: Access to Crown Land
(120.36 Ko)
YKDFN Hearing Presentation Summary
(62.52 Ko)
Comments from Marc Choyt supporting LKDFN
(43.18 Ko)
This cover letter is related to three documents on transmission line routing alternatives, submitted by Deze as an undertaking from the hearing. (The supporting documents are posted separately on this page).
This is the third of three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
This is a summary of the first of the three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
This report is number two of three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
This report is one of three documents on transmission line routing alternatives submitted by Deze as an undertaking from the hearing.
October 2009 Caribou Workshop Report
(6.87 Mo)
This is the second of three attachments to the GNWT's Jan. 27, 2010 response to the information request issued January 21, 2010. It is a draft technical report on the Bathurst caribou herd decline.
GNWT Caribou Presentation
(4.08 Mo)
This is the covering letter for the GNWT's Jan. 27, 2010 response to the information request issued January 21, 2010. (The three attachments are posted on this page as seperate documents due to their large file size).
Prairie Creek Mine - EA0809-002 Go to Project
Environmental Assessment (EA) - Complete
DAR submission date - Review Board request
(603.82 Ko)