Main Content
Primary tabs
Results
Displaying 11576 - 11600 of 12202
Underground Decline and Pilot Plant - EA01-002 Go to Project
Environmental Assessment (EA) - Complete
Information Request from GNWT - RWED
(134.04 KB)
Letter includes two information requests as well as a reiteration of concern of work plan timeline. The information requests concern: Draft Reclamation Costing Model for Prairie Creek Minesite, and Surface Lease 'Overhold Tenancy'.
Letter from NNPR to MVEIRB re: EA Report
(10.5 KB)
Letter supports the idea that MVEIRB conduct the Conformity Analyses between the Environmental Assessment Report produced by Canadian Zinc and the Terms of Reference produced by MVEIRB.
Letter provides MVEIRB's decision on the conformity of the Environmental Assessment Report submitted by Canadian Zinc to the Terms of Reference.
Letter from CZN to MVEIRB re: EA work plan
(76.18 KB)
Letter concerning Canadian Zinc's previously submitted Environmental Assessment Report. Also Includes Milestone Completion Timetable for EA 01-002 and EA 01-003.
Letter thanks developer for Environmental Assessment Report and states that the timelines of 01-002 and 01-003 timelines are being brought together to overcome some time restraints.
Letter from INAC to MVEIRB re: timeline
(81.75 KB)
Includes: Cover letter, EA report, Safety & Procedures Manual, Land Overlaps Map, Location Map, Claims Map, Pilot Plant Flowsheet, Pilot Plant Location Drawing, Site Plan and Metallurgical Studies Bibliography.
Snap Lake Diamond Mine - EA01-004 Go to Project
Environmental Assessment (EA) - Complete
DFO preferences for receiving requests and providing feedback on issues.
Email from MVEIRB Legal Counsel
(80.61 KB)
Email from Environment Canada
(38.46 KB)
Email regards the identification and role of expert advisors.
EA Coordinators
(44.87 KB)
Sent out by MVEIRB via fax.
Identification of areas of expertise from DFO.
Draft Terms of Reference and Work Plan
(1.17 MB)
Email regards WWF involvment in the EA of De Beers Canada Snap Lake Diamond Project.
Cameron Hills Exploratory Drilling Project - EA00-004 Go to Project
Environmental Assessment (EA) - Complete
Cameron Hills Drilling Project - August 2001
(16.04 KB)
CanTung Mine Water License Renewal - EA02-003 Go to Project
Environmental Assessment (EA) - Cancelled
Web article re: NATC to reopen CanTung Mine
(125.94 KB)