Main Content
Primary tabs
Results
Displaying 2876 - 2900 of 12199
Jay Project - EA1314-01 Go to Project
Environmental Assessment (EA) - Complete
Aquatics advisor - Neil Hutchinson resume
(240.82 KB)
Water Quality advisor - Kathy Racher CV
(167.33 KB)
Jay DAR Adequacy Review cover letter
(410.81 KB)
Jay DAR Adequacy Review
(721.04 KB)
Caribou advisor - Anne Gunn resume
(149.23 KB)
This is the cover letter for the Jay Project Factual Reports Vol 1 Proposed Dikes and Volume 2 Proposed Jay Pit Area.
This is the Jay Project Geotechnical and Hydrogeological Field Investigation Factual Report Vol 2: Proposed Jay Pit Area, Part D.
Jay Pit Factual Report - Volume 2, Part C
(21.93 MB)
Jay Pit Factual Report - Volume 2, Part B
(21.32 MB)
Jay Pit Factual Report - Volume 2, Part A
(22.98 MB)
Jay Dike Factual Report - Volume 1 Part D
(16.87 MB)
Jay Dike Factual Report - Volume 1 Part C
(38.54 MB)
Jay Dike Factual Report - Volume 1 Part B
(38.46 MB)
Jay Dike Factual Report - Volume 1 Part A
(28.84 MB)
Dominion Information Sessions Dec 11-12
(252.5 KB)
Geotech advisor CV_B Watts
(81.94 KB)
This is a response letter from Dominion Diamond to Lutsel K'e Dene First Nation regarding traditional land use and traditional knowledge reports.
DAR Table of Contents with hyperlinks
(252.11 KB)
Note to file - DAR submission and next steps
(359.22 KB)
16B_Annex_XVI_App_B_Arky_BSA_Sites
(61.6 KB)
Mackenzie Valley Highway - EA1213-02 Go to Project
Environmental Assessment (EA) - Ongoing
GNWT's comments on the Terms of Reference
(539.47 KB)
GNWT's comments on the Terms of Reference
(740.48 KB)
A cover letter for the revised Terms of Reference.