The purpose of the project is to expand and upgrade the 79 km long Howard's Pass Access Road to a two lane gravel road. The road is located in the southwestern NWT in the Mackenzie Mountains. The road starts at km 188 of the Nahanni Range Road, near Cantung, and extends north to the Yukon Border. About half of the road is in the Nahanni and Naats'ihcho'oh National Park Reserves. During construciton, proposed activities include clearing the right of way, upgrades to bridges and culverts, and extraction of borrow materials. During operations the road will be used to construct the mine in the Yukon, haul lead and zinc concentrates from the mine site south and consumables such as fuel and milling reagents from the south to the mine site.

This is the Review Board's Terms of Reference for the Howard's Pass Access Road Upgrade Project EA.

Letter from Selwyn Chihong Mining Limited re pause in work on Developer's Assessment Report.
Note to file - meeting with Selwyn Chihong - Howard's Pass access road project update
Sahtu Landu Use Planning Board conformity determination for the Howard's Pass Access Road Upgrade project
Update meeting between Selwyn and Review Board
This is the Interim Workplan for the Howard's Pass Access Road upgrade project.
This is the Review Board's Reasons for Decision on the Scope of Environmental Assessment for the HPAR Upgrade Project EA.
This is the Review Board's cover letter for the Terms of Reference, the Reasons for Decision on the Scope of EA, and the interim work plan.
This is the Review Board's Terms of Reference for the Howard's Pass Access Road Upgrade Project EA.
This document contains all the material from the Online Review of the Review Board's Draft Terms of Reference.
Additional comments from the developer on reviewer comments and Review Board staff responses.
Letter from the Naha Dehe Dene Band to the MVEIRB regarding the draft Terms of Reference for EA1516-01
Ruari Carthew is replacing Kate Mansfield as staff on this file.
The Review Board has issued the Draft Terms of Reference. The document is open for review from parties and the developer on the Online Review System.
The Review Board has issued the Draft Terms of Reference. The Draft ToR is posted on the Public Registry and is also on the Online Review System for review by parties and the developer.
This document contains the reviewers comments on the DPToR, the developer's responses, and Review Board staff responses.
Letter from Environment and Climate Change Canada acknowledging receipt of Notification pursuant to SS.79(1) of the Species at Risk Act
SCML's responses to Parties' review of the DPToR. Due to technical difficulties, the responses have not yet been uploaded to the ORS, but will be as soon as possible.
A letter from the Wildlife Conservation Society regarding clarrification of comments on the Developer's Proposed Terms of Reference.

New Total Stage
  7 Preliminary screening
  4 Assessment/review startup
  25 Scoping
  16 Terms of Reference and workplans (current stage)
  4 Developer's Assessment Report/Environmental Impact Statement
  1 Information requests
    Technical or community sessions
    Technical reports
    Public hearings
    Hearing follow-up
    Report of Environmental Assessment/Impact Review
    Post Report materials
    Minister's decision and final measures
  2 Other public registry materials
0 59 Total Documents (See All)