Main Content
Onglets principaux
Results
Displaying 9426 - 9450 of 12221
Drybones Bay mineral exploration - EA03-004 Go to Project
Environmental Assessment (EA) - Complete
DFO Letter Re: NSV Response to IR
(445.65 Ko)
Comments on the Draft Cumulative Effects Study
(174.78 Ko)
Comments on the Draft Cumulative Effects Study
(174.78 Ko)
Comments on the Draft Cumulative Effects Study
(174.78 Ko)
YKDFN comments on the draft cumulative effects study
Pre-Hearing Conference Guide and Worksheet
(666.2 Ko)
Draft CE Maps
(993.42 Ko)
MVEIRB Fax Update
(1.17 Mo)
Environmental Guidelines for Ice Roads
(7.36 Mo)
EA Process Update
(111.1 Ko)
NSV Email Clarification
(190.81 Ko)
Drybones Bay Preliminary Exploration - EA03-002 Go to Project
Environmental Assessment (EA) - Complete
Ice Road Document
(8.42 Mo)
Pre-Hearing Conference Participation Form
(13.27 Ko)
Pre-Hearing Conference Guide
(14.25 Ko)
Letter attaches a pre-hearing conference guide and worksheet for the Consolidated Goldwin Ventures pre-hearing conference.
Email from NSMA to MVEIRB re: DRAFT CE Maps
(31.38 Ko)
Email attaches draft maps of the environmental assessment area for distribution.
Correspondence between MVEIRB and Terra Firma Consultants regarding comment period.
Fax to Distribution List
(390.28 Ko)
Fax Cover Sheet
(70.63 Ko)
Distributes the comments on the Drybones/Wool Bay Area environmental assessments to parties.
Email forwards the CGV, NAGRC and NSV Issues Summary Table to the distribution list.
Email attaches document pertaining to CGV, NAGRC, NSV - CE Comments - Process Update.
Summit Creek Exploration Well - EA03-001 Go to Project
Environmental Assessment (EA) - Complete
NEB as the designated regulatory agency has decided to adopt MVEIRB's recommendations.
Underground Decline and Pilot Plant - EA01-002 Go to Project
Environmental Assessment (EA) - Complete
Letter from MVLWB to MVEIRB re: Permits
(994.52 Ko)