Main Content
Onglets principaux
Results
Displaying 9351 - 9375 of 12191
Drybones Bay mineral exploration - EA03-006 Go to Project
Environmental Assessment (EA) - Complete
Comments on the Culmulative Effects Study.
Request for correction to the participants list submitted by the North Slave Metis Alliance.
Was distributed by the Mackenzie Valley Environmental Impact Review Board to the distribution list.
Report published by the Department of Energy, Mines and Petroleum Resources, GNWT.
Regards confidentiality of North Slave Metis Alliance information contained in Gartner Lee study.
Comments from the interested parties.
Appendix to Developers Assessment Report
(191.44 Ko)
Cameron Hills Extension Project - EA03-005 Go to Project
Environmental Assessment (EA) - Complete
Graham Veale points out that there is in fact a need for a large compressor on site.
MVEIRB Notes From Site Visit
(476.13 Ko)
Email from Joe Acorn re site visit
(108.18 Ko)
Fax to the distribution list announcing that Paramountƒ_Ts DAR is in conformity with the final TOR.
Drybones Bay mineral exploration - EA03-004 Go to Project
Environmental Assessment (EA) - Complete
NSV's comments, concerns and analysis of the cumulative effects study.
MVEIRB response to YKDFN's request for ruling on the above matters.
New Directly Affected Party - DKFN
(205.33 Ko)
DFO letter requesting clarification on the discrepancies in the drill locations specified in the LUP application and the DAR.
Note to File
(164.76 Ko)
INAC Trip Report
(833.98 Ko)
Information provided by the NSMA has been removed from the Gartner Lee study for reasons of confidentiality and is not for distribution.
MVEIRB provides NSV with advice on preparing for the public hearing.
DKFN Identification of EA Roles
(1.03 Mo)
Compilation of all previous comments on the draft cumulative effects assessment.
Mackenzie Gas Project - EA03-007 Go to Project
Environmental Assessment (EA) - Complete
Additional information supplementary to the Developer's Assessment Report for the proposed Mackenzie Valley pipeline.
Wool Bay exploration drilling - EA03-003 Go to Project
Environmental Assessment (EA) - Complete
The YKDFN request that the MVEIRB rule on their ability to submit information relevant to environmental assessments conducted in the Drybones/Wool Bay area, Akaitcho region on a confidential basis.
Study was prepared on behalf of MVEIRB to examine cumulative effects of several preliminary diamond exploration projects located near Drybones/Wool Bay, Akaitcho region.
Drybones Bay Preliminary Exploration - EA03-002 Go to Project
Environmental Assessment (EA) - Complete
A study done by Gartner Lee Limited to advise the environmental assessment process. Report determines the cumulative effects of proposed developments in the Drybones Bay/Wool Bay Area by Consolidated Goldwin Ventures, New Shoshoni Ventures, North American