Main Content
Onglets principaux
Results
Displaying 9401 - 9425 of 12191
Drybones Bay Preliminary Exploration - EA03-002 Go to Project
Environmental Assessment (EA) - Complete
Ice Road Document
(8.42 Mo)
Pre-Hearing Conference Participation Form
(13.27 Ko)
Pre-Hearing Conference Guide
(14.25 Ko)
Letter attaches a pre-hearing conference guide and worksheet for the Consolidated Goldwin Ventures pre-hearing conference.
Email from NSMA to MVEIRB re: DRAFT CE Maps
(31.38 Ko)
Email attaches draft maps of the environmental assessment area for distribution.
Correspondence between MVEIRB and Terra Firma Consultants regarding comment period.
Fax to Distribution List
(390.28 Ko)
Fax Cover Sheet
(70.63 Ko)
Distributes the comments on the Drybones/Wool Bay Area environmental assessments to parties.
Email forwards the CGV, NAGRC and NSV Issues Summary Table to the distribution list.
Email attaches document pertaining to CGV, NAGRC, NSV - CE Comments - Process Update.
Fax package from MVEIRB
(452.24 Ko)
Summit Creek Exploration Well - EA03-001 Go to Project
Environmental Assessment (EA) - Complete
NEB as the designated regulatory agency has decided to adopt MVEIRB's recommendations.
Drybones Bay mineral exploration - EA03-004 Go to Project
Environmental Assessment (EA) - Complete
Pre-Hearing Conference Guide and Worksheet
(666.2 Ko)
Draft CE Maps
(993.42 Ko)
MVEIRB Fax Update
(1.17 Mo)
Environmental Guidelines for Ice Roads
(7.36 Mo)
EA Process Update
(111.1 Ko)
NSV Email Clarification
(190.81 Ko)
Comments on the Draft Cumulative Effects Study
(174.78 Ko)
MVEIRB Response to NSV Questions
(174.83 Ko)
NSV has questions about when the final draft of the study will be available. Weather his request to have the public hearing moved was going to be considered and weather or not he could attend the pre-hearing conference via conference call.
Application for Party Status
(1.23 Mo)
Underground Decline and Pilot Plant - EA01-002 Go to Project
Environmental Assessment (EA) - Complete
Letter from MVLWB to MVEIRB re: Permits
(994.52 Ko)