Displaying 3776 - 3800 of 12191
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
This is a technical memorandum submitted by De Beers.
The following document is a letter from the Gahcho Kue panel to Aboriginal parties regarding Traditional Knowledge studies submission dates.
Finalized Gahcho Kue diamond project hearing dates and locations.
This is a letter describing the Gacho Kue Panel's request that Traditional Knowledge (TK) Reports be submitted by the same due date as Technical Reports (October 22 2012).
This is a letter from the Gacho Kue Panel to Lutsel K'e Dene First Nation (LKDFN) responding to LKDFN's letter of September 17th requesting that the technical hearings be in Lutsel K'e.
Draft FIsh Out Plan October 2012
(637.83 Ko)
Wildlife Monitoring Plan, Part 3: Conclusion of Appendix A (which is Appendix C of Caribou Monitoring Plan V2) Appendix B Species at Risk; Appendix C Wildlife Effects Mitigation and Management Plan Appendix D Complete List of Caribou Effects Pathways Assessed in the EIS and Expected Types of Monitoring and Applicable Monitoring Programs; Appendix E Linkage Diagrams for Proposed Effects from the Gahcho Ku‚ Project Generated During Technical and Community Scoping Sessions (MVEIRB 2006); and Appendix F Comments on Caribou Monitoring from the Diamond Mine Wildlife Monitoring Workshops, 2009 and 2010.
This technical memorandum (memo) submitted by De Beers provides information that is necessary to complete a Navigable Waters assessment, as outlined in the Transport Canada Round 2 Information Requests TC-1 and TC-2.
Part 2: Continuation of Appendix A including Conceptual Caribou Monitoring Plan V1 (Draft- July 2012) and V2 (Draft-August 2012)
Part 1: Wildlife Monitoring Plan and beginning of Appendix A: Materials from Wildlife Monitoring Plan Group Meetings and Workshop
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
Closing comments- Developer
(259.06 Ko)
The following document contains Environment Canada's final comments regarding the Review Board's environmental assessment of the Giant Mine Remediation Project.
This is a Note to File regarding the participation of Board member John Curran in this environmental assessment.
Closing Statement- DFO
(129.41 Ko)
Closing comments- NSMA
(595.5 Ko)
Closing comments- YKDFN
(135.99 Ko)
Letter from Mike Mitchell
(103.17 Ko)
NICO Project - EA0809-004 Go to Project
Environmental Assessment (EA) - Complete
Letter from community member Oct 11 hearing
(23.35 Ko)
The following document lists suggested mitigation presented during the public heraings related to the Tlicho Government's TK presentation of the TK Report.
Nechalacho Rare Earth Element Project - EA1011-001 Go to Project
Environmental Assessment (EA) - Complete
The following document is Transport Canada's response to a Round 2 information request related to the environmental assessment of Avalon Rare Metals Inc.'s Thor Lake Rare Earth Element Project.
Avalon's Response to Round 2 Information Requests
(1002.88 Ko)
Sahtu Unconventional Oil Project - EA1213-01 Go to Project
Environmental Assessment (EA) - Withdrawn
This is a letter to Distribution providing notification of MGM Energy Corp.'s East MacKay/Sahtu Unconventional Oil Project referral to environmental assessment.
This letter is a notice of referral to environmental assessment sent to MGM Energy Corp. from the Sahtu Land and Water Board for the East MacKay/Sahtu Unconventional Oil Project.
Referral to Environmental Assessment by SLWB
(499.72 Ko)
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
The following document is a letter from the Review Board to Deze Energy Corporation regarding a definitive prediction for further information on the Taltson Hydroelectric Expansion Project.