Main Content
Onglets principaux
Results
Displaying 3726 - 3750 of 12131
Gahcho Kue Diamond Mine - EIR0607-001 Go to Project
Environmental Impact Review (EIR) - Complete
This is a letter from the Gacho Kue Panel to Lutsel K'e Dene First Nation (LKDFN) responding to LKDFN's letter of September 17th requesting that the technical hearings be in Lutsel K'e.
Draft FIsh Out Plan October 2012
(637.83 Ko)
Wildlife Monitoring Plan, Part 3: Conclusion of Appendix A (which is Appendix C of Caribou Monitoring Plan V2) Appendix B Species at Risk; Appendix C Wildlife Effects Mitigation and Management Plan Appendix D Complete List of Caribou Effects Pathways Assessed in the EIS and Expected Types of Monitoring and Applicable Monitoring Programs; Appendix E Linkage Diagrams for Proposed Effects from the Gahcho Ku‚ Project Generated During Technical and Community Scoping Sessions (MVEIRB 2006); and Appendix F Comments on Caribou Monitoring from the Diamond Mine Wildlife Monitoring Workshops, 2009 and 2010.
This technical memorandum (memo) submitted by De Beers provides information that is necessary to complete a Navigable Waters assessment, as outlined in the Transport Canada Round 2 Information Requests TC-1 and TC-2.
Part 2: Continuation of Appendix A including Conceptual Caribou Monitoring Plan V1 (Draft- July 2012) and V2 (Draft-August 2012)
Part 1: Wildlife Monitoring Plan and beginning of Appendix A: Materials from Wildlife Monitoring Plan Group Meetings and Workshop
Wildlife Ecological Risk Assessment
(10.24 Mo)
Human Health Risk Assessment
(9.77 Mo)
This document provides information to complete a Navigable Waters assessment, as requested in the Transport Canada Round 2 Information Requests TC-1 and TC-2.
This document provides information to complete a Navigable Waters assessment, as requested in the Transport Canada Round 2 Information Requests TC-1 and TC-2.
This document provides information to complete a Navigable Waters assessment, as requested in the Transport Canada Round 2 Information Requests TC-1 and TC-2.
2012 EIS Supplement errata Table 8.II.3
(46.64 Ko)
This is a document submitted by De Beers Canada titled "Determination of Natural Winter Mitigation of Road Dust Emissions from Mining in Northern Canada"
Air Quality Assessment Update - Appendix II - September 2012
Sahtu Unconventional Oil Project - EA1213-01 Go to Project
Environmental Assessment (EA) - Withdrawn
This is a letter to Distribution providing notification of MGM Energy Corp.'s East MacKay/Sahtu Unconventional Oil Project referral to environmental assessment.
This letter is a notice of referral to environmental assessment sent to MGM Energy Corp. from the Sahtu Land and Water Board for the East MacKay/Sahtu Unconventional Oil Project.
Referral to Environmental Assessment by SLWB
(499.72 Ko)
Giant Mine Remediation Project - EA0809-001 Go to Project
Environmental Assessment (EA) - Complete
Closing Statement- DFO
(129.41 Ko)
Closing comments- NSMA
(595.5 Ko)
Closing comments- YKDFN
(135.99 Ko)
Letter from Mike Mitchell
(103.17 Ko)
Community hearing presentation- Terry Pamplin
(104.88 Ko)
Taltson Hydroelectric Expansion Project - EA0708-007 Go to Project
Environmental Assessment (EA) - Withdrawn
The following document is a letter from the Review Board to Deze Energy Corporation regarding a definitive prediction for further information on the Taltson Hydroelectric Expansion Project.
Nechalacho Rare Earth Element Project - EA1011-001 Go to Project
Environmental Assessment (EA) - Complete
Avalon's Response to Round 2 Information Requests
(1002.88 Ko)
NICO Project - EA0809-004 Go to Project
Environmental Assessment (EA) - Complete
This letter provides clarification regarding GNWT verbal comments on Wildlife Effects Monitoring commitments made by Fortune at the Public Hearing.