This proposed project is a 1220-kilometre natural gas pipeline system along the Mackenzie Valley which will connect natural gas production from three fields in the Mackenzie Delta to the existing pipeline grid in Alberta.

After the environmental assessment of this project was completed it was referred by the Review Board to an environmental review. Because of the transboundary nature and scale of the project, the review was conducted by the Joint Review Panel, set up under the Inuvialuit Final Agreement, the Canadian Environmental Assessment Act and the Mackenzie Valley Resource Management Act. The Joint Review Panel published its completed report on December 30, 2009, which may be downloaded here.

There are no documents at this time.

Volume 1: Respecting all voices: Our journey to a decision. Part 1: The project as a whole and Part 2: Production, gathering and processing systems
Volume 1: Respecting all voices: Our journey to a decision. Part 3: Production, The transmission pipelines and Part 4: Our decision
Volume 2: Technical considerations: Implementing the decision. Chapter 1: Introduction, Chapter 2: Regulatory review process, Chapter 3: Environmental and socio-economic matters, and Chapter 4: Development fields
Volume 2: Technical considerations: Implementing the decision.Chapter 5: Routing and land matters, Chapter 6: Facilities, Chapter 7: Economic feasibility, Chapter 8: Toll, tariff and access provisions, Chapter 9: Consultation, Chapter 10: National Energy Board lifespan regulation, Chapter 11: Disposition, and Appendices
The Federal Minister and Responsible Ministers, under the Mackenzie Valley Resources Management Act (MVRMA), have made a decision on the Environmental Impact Review of the Mackenzie Gas Project which was made under subsection 135(1) of the MVRMA This is a combined response is under the authority of the MVRMA and the Canadian Environmental Assessment Act (CEAA).
Joint Review Panel: Report of Environmental Review Executive Summary - French
Joint Review Panel: Report of Environmental Review Volume I
Joint Review Panel: Report of Environmental Review Volume I, Figure 2-14
Joint Review Panel: Report of Environmental Review Volume I, Figure 2-16
Joint Review Panel: Report of Environmental Review Volume II
Joint Review Panel: Report of Environmental Review Executive Summary - English
A joint letter from the Partners of the Joint Review Panel Agreement sent to the JRP ammending Section 4.9 (reporting requirements) of the "Agreement for the Environmental Impact Review of the Mackenzie Gas Project".
Agreement between the Minister of the Environment, MVEIRB and the Inuvialuit to conduct an environmental review of the Mackenzie Gas Project, including the creation of the joint review panel. Agreement gives effect to the Cooperation Plan (see Additional
Terms of Reference (391.42 KB)
The document sets out the terms of reference for the Environmental Impact Review of the Mackenzie Gas Project. It includes background and rationale for the establishment of the Joint Review Panel.
Cooperation Plan (1.02 MB)
Sets out a "made in the North" approach to conducting a joint environmental review designed to satisfy the regulatory requirements of the Canadian Environmental Assessment Act, Mackenzie Valley Resource Management Act and the Western Arctic

New Total Stage
    Preliminary screening
    Assessment/review startup
    Scoping
    Terms of Reference and workplans
    Developer's Assessment Report/Environmental Impact Statement
    Information requests
    Technical or community sessions
    Technical reports
    Public hearings
    Hearing follow-up
  6 Report of Environmental Assessment/Impact Review
    Post Report materials
  5 Minister's decision and final measures
  4 Other public registry materials
0 15 Total Documents (See All)