Proposed natural gas production from three fields in the Mackenzie Valley and a 1220-kilometre natural gas pipeline system along the Mackenzie Valley to the existing pipeline grid in Alberta.

There are no documents at this time.

Notification of NEB notification hearing process to be coordinated with EIR by the JRP.
Re: Request for EIR consultations with Dene Tha' First Nation.
Re: Approval of agreement for MVEIRB and Ministry of the Environment to conduct EIR through a joint review panel.
Report outlines the decisions reached by the MVEIRB during Phase I of the environmental assessment. The MVEIRB recommended that the proposed project be subject to an environmental review.
Re: approval of NEB to enter agreement with MOE to establish a review panel to conduct further EA of MGP.
Media Advisory stating that the Mackenzie Gas Project's proposed pipeline has been referred to an Environmental Impact Review.
Concerning MVEIRB referral of MGP to EIR.
Submission addresses public concern and scoping issues.
Personal letter from Gwich'in woman Alestine Andre

New Total Stage
    Preliminary screening
  4 Assessment/review startup
  14 Scoping
  22 Terms of Reference and workplans
  2 Developer's Assessment Report/Environmental Impact Statement
    Information requests
    Technical or community sessions
  1 Technical reports
  26 Public hearings
    Hearing follow-up
  2 Report of Environmental Assessment/Impact Review
  2 Post Report materials (current stage)
  2 Minister's decision and final measures
  12 Other public registry materials
0 87 Total Documents (See All)