Proposed natural gas production from three fields in the Mackenzie Valley and a 1220-kilometre natural gas pipeline system along the Mackenzie Valley to the existing pipeline grid in Alberta.
There are no documents at this time.
NEB MGP Hearing Order
(2.89 MB)
Re: Request for EIR consultations with Dene Tha' First Nation.
Letter from INAC to MVEIRB
(267.53 KB)
Report outlines the decisions reached by the MVEIRB during Phase I of the environmental assessment. The MVEIRB recommended that the proposed project be subject to an environmental review.
Letter from NEB to MVEIRB
(168.72 KB)
Ft. Simpson public hearing board attendance
(350.57 KB)
Mackenzie Gas Project order to Panel Review
(33.69 KB)
MVEIRB letter to INAC re: EA decision
(293.29 KB)
Submission addresses public concern and scoping issues.
Letter individual concerned with MGP impacts
(105.73 KB)
RWED letter to MVEIRB re: Comments on Draft TOR
(845.49 KB)
Letter is from Itai Katz.
| New | Total | Stage |
|---|---|---|
| Preliminary screening | ||
| 4 | Assessment/review startup | |
| 14 | Scoping | |
| 22 | Terms of Reference and workplans | |
| 2 | Developer's Assessment Report/Environmental Impact Statement | |
| Information requests | ||
| Technical or community sessions | ||
| 1 | Technical reports | |
| 26 | Public hearings | |
| Hearing follow-up | ||
| 2 | Report of Environmental Assessment/Impact Review | |
| 2 | Post Report materials (current stage) | |
| 2 | Minister's decision and final measures | |
| 12 | Other public registry materials | |
| 0 | 87 | Total Documents (See All) |
Add new comment
You need to be logged in as a registered user to post comments.