A 2D linear seismic data acquisition program to be conducted along the Mackenzie River. The project would include a seismic energy source being towed by barge along the Mackenzie and issues of how the ensuing acoustic output may impact river biota was of key importance.
There are no documents at this time.
INAC has decided to accept, with the proposed modifications, MVEIRBs REA for the Mackenzie River Delta Seismic Program.
Minister of Indian Affairs and Northern Development has decided to adopt the REA with the modifications.
Letter from NEB to MVEIRB Re: REA
(384.53 KB)
MVEIRB informs the RM that they have changed the wording of revised measure 1.
DCFN express concerns and dissatisfaction with the level of consultation they received during the consult to modify process and review of the REA.
MVEIRB sets up a meeting to deal with the substance of the consultation requests.
Evaluation of the Potential Impacts of Seismic Surveys on the Behaviour and Auditory physiology of Fish in the Mackenzie River.
Letter NEB to MVEIRB Re: Consult to Modify
(104.04 KB)
WesterGeco requests to change application so their proposed project runs fro June 2005 until august 2005
INAC received MVEIRB's reply to the request for consult to modify and discussion of beginning the process.
Due to uncertainties in the process WesternGeco wishes to defer its project through 2004 and is therefore requesting an extension on its application until the end of 2005.
NEB informs WesternGeco that they have entered into the consult to modify process with MVEIRB.
INAC would like to initiate the consult to modify process with MVEIRB
NEB requests a meeting with MVEIRB regarding possible modification to the recommended measures.
Chief Bertrand expresses surprise that NRS is still an option bcause they have not been contacted or consulted during the process.
Letter from INAC to MVEIRB Re: WesternGeco
(90.56 KB)
NEB forwards a copy of its original request for comments and WesternGecos responses to MVEIRB.
Letter from INAC to MVEIRB
(84.21 KB)
NEB fax requesting WesternGeco's comments on MVEIRB's REA.
Report of Environmental Assessment
(4.74 MB)
| New | Total | Stage |
|---|---|---|
| 21 | Preliminary screening | |
| 25 | Assessment/review startup | |
| Scoping | ||
| 9 | Terms of Reference and workplans | |
| 7 | Developer's Assessment Report/Environmental Impact Statement | |
| 6 | Information requests | |
| 2 | Technical or community sessions | |
| 8 | Technical reports | |
| Public hearings | ||
| Hearing follow-up | ||
| 1 | Report of Environmental Assessment/Impact Review | |
| 12 | Post Report materials | |
| 3 | Minister's decision and final measures | |
| 44 | Other public registry materials | |
| 0 | 138 | Total Documents (See All) |
Add new comment
You need to be logged in as a registered user to post comments.