Main Content
EQC Report
(1.3 MB)
EQC Report
(1.3 MB)
Nitrogen Response Plan
(4.41 MB)
Nitrogen Response Plan
(4.41 MB)
TDS Response Plan
(26.83 MB)
TDS Response Plan
(26.83 MB)
An update to the existing hydrodyanamic report including: TDS, nutrients, major ions, metals, and metalloids.
An update to the existing hydrodyanamic report including: TDS, nutrients, major ions, metals, and metalloids.
an initial assessment of the long-term water storage, release rate, and water quality conditions (in particular with respect to nitrate and ammonia) within, and discharging from, the North Pile.
an initial assessment of the long-term water storage, release rate, and water quality conditions (in particular with respect to nitrate and ammonia) within, and discharging from, the North Pile.
Mine Site Water Quality Report
(34.22 MB)
Mine Site Water Quality Report
(34.22 MB)
Water Balance Report
(1.03 MB)
Water Balance Report
(1.03 MB)
Underground Model Memo
(6.07 MB)
Underground Model Memo
(6.07 MB)
Snap Lake Community Engagement Report
(26.95 MB)
Snap Lake Community Engagement Report
(26.95 MB)
Water Licence Concordance Table
(295.37 KB)
Water Licence Concordance Table
(295.37 KB)
The MVLWB 'Mining Industry Questionanaire'
The MVLWB 'Mining Industry Questionanaire'
A document containing links for the water licence application documents.
A document containing links for the water licence application documents.
Snap Lake Water Licence Application
(67.01 KB)
Snap Lake Water Licence Application
(67.01 KB)