Main Content
Tyhee Letter of Clarification to Review Board
(120.65 KB)
Yellowknife Gold Project Note to File 004
(69.28 KB)
Tyhee YGP Note to File - 003
(43.29 KB)
Final YGP Scoping Session Meeting Report
(408.03 KB)
Document contains INAC's 2007 Mine Site Closure and Reclamation Guidelines, to assist with closure and reclamation planning, as part of INAC's scoping submission for the YGP 2008 EA
Document contains INAC's Minesite Reclamation Policy for the Northwest Territories as part of INAC's scoping submission for the YGP 2008 EA
INAC Spill Guidelines
(1.24 MB)
INAC submission attachment for the YGP 2008 EA. This document contains an engineering assessment of various tailings remediations at the historic Discovery minesite, as well as suggested monitoring and maintenance plans.
INAC Scoping Submission YGP EA 2008
(398.95 KB)
GNWT Scoping Submission YGP 2008 EA
(140.68 KB)
Scoping Submission from Mining Watch Canada for the EA of Tyhee NWT Corp.'s Yellowknife Gold Project
Scoping submission from Environment Canada for the EA of Tyhee NWT Corp.'s Yellowknife Gold Project
YKDFN Scoping Submission YGP EA 2008
(1.15 MB)
Scoping submission from Tyhee Development Corp for the EA of Tyhee's Yellowknife Gold Project
NSMA Scoping Submission YGP EA 2008
(84.14 KB)
DFO Scoping Submission YGP EA 2008
(2.52 MB)
Review Board staff gave this brief EA process presentation at the issues scoping session in Yellowknife on October 17th, 2008.
Draft meeting report from the issues scoping session for Tyhee NWT Corp.'s Yellowknife Gold Projec- on October 16, 17, 2008.
This is a place-holder for an audio file of the October 17th 2008 technical scoping session for the EA of Tyhee NWT Corp.'s 2008 Yellowknife Gold Project. The file is too large to post on the public registry, but the Review Board office can provide electronic copies.
2005 Schedule 2 DFO-EC Info Request for YGP-TIA
(787.29 KB)
Tyhee YGP Note to File - 002
(318.2 KB)
PowerPoint presentation from Tyhee NWT Corp. regarding the 2008 Yellowknife Gold Project in preparation for the upcoming scoping sessions October 16th/17th.
YKDFN Scoping Scheduling Letter
(222.02 KB)
MVEIRB Letter to YKDFN Regarding Scheduling
(33.51 KB)
YGP Scoping Scheduling Letter
(77.82 KB)
Various parties submitted comments during the Mackenzie Valley Land and Water Board's Preliminary Screen of the 2008 Yellowknife Gold Project. This document compiles those comments for consideration during the scoping process.
2005 Tyhee YGP EA ToR
(227.32 KB)
YGP Comparative Summaries from Tyhee
(191.63 KB)
YGP Scoping Sessions Scheduling Letter
(26.06 KB)