Main Content
This letter from the Minister of Indian Affairs and Northern Development acknowledges the closure of the environmental assessment for the Bayswater Uranium Corporation's El Lake Mineral Exploration Project.
This letter confirms that the Office of the Minister of Indian and Northern Affairs Canada has received notification from the Review Board that the Bayswater Uranium Corp. environmental assessment has been completed.
Notice from the Review Board to the Minister of Indian and Northern Affairs Canada of the closure of EA's 0708-004 and 0708-005 ( EL Lake and Crab Lake) due to the developer, Bayswater Uranium Corporation, withdrawal of its land use permit applications.\r\n
Notice to the Review Board and Mackenzie Valley Land and Water Board that Bayswater Uranium Corporation has officially withdrawn its applications for both its El Lake (EA0708-004) and Crab Lake (EA0708-005) land use permits.
Attachment to letter from Review Board to Indian and Northern Affairs Canada re: evidence on the public records of EAs 0708-002 through -005 that may be of assistance in focusing the proposed studies and consultations for the Upper Thelon Land and Resourc
A letter from the Review Board to Indian and Northern Affairs Canada identifying evidence gathered during EAs 0708-002 through -005 that may be of assistance in defining the scope of studies and consultations required for the proposed Upper Thelon Land an
Notice of Receipt of REA
(232.05 KB)
Transmittal letter from Review Board to Minister of INAC for the Report of Environmental Assessment.
Report of Environmental Assessment
(1.52 MB)
Note to File- Public Record Closed
(9.17 KB)
Comments forwarded by the Beverly and Qamanirjuaq Caribou Management Board to the MVEIRB in relation to the Uravan (South and North Boomerang Lake) and Bayswater Uranium (El Lake and Crab Lake) EAs in the Akaitcho Territory. Comments originally sent
YKDFN Thelon Letter May 29 08
(55.06 KB)
LKFN Submission May 30 08
(32.5 KB)
WWF Submission May 29 08
(62.15 KB)
This is a submission from Treaty 8 Tribal Corp. describing its views regarding this development. (Please note that the same PDF inludes seperate submissions for four different environmental assessments.)
INAC submission
(40.02 KB)
GNWT submission
(73.87 KB)
Extension to further submissions deadlines
(39.47 KB)
BQCMB submission
(953.59 KB)
A request from Joe Murdock on behalfe of the Lutsel K'e Dene First Nation, requesting the Review Board grant an extension period for parties to comment on the Uravan and Bayswater proposed developments.
David Pelly submission
(1.92 MB)
Alex Hall of Canoe Arctic submission
(166.14 KB)
Request for further submissions
(71.03 KB)
Party Status Letter
(35.79 KB)
Evidence Transfer- Reasons For Decision
(261.41 KB)
INAC evidence transfer response
(127.08 KB)
BQCMB
(67.38 KB)
ADNT evidence transfer response
(120.71 KB)
This is the response from the Treaty 8 Tribal Corp to the Review Board's evidence transfer and scoping questions.
Canoe Arctic Inc evidence transfer response
(12.88 KB)
Evidence Transfer and Scoping Questions
(222.09 KB)
NWTMN comments on draft work plans
(32.99 KB)
NWT Treaty 8 comments on draft workplans
(46.66 KB)
INAC comments on draft work plan
(37.92 KB)
GNWT comments on draft workplans
(70.07 KB)
Fort Resolution Metis Council letter to MVEIRB dated January 30, 2008, regarding Bayswater Uranium files.
BQCMB comments on draft workplans
(220.49 KB)
The attached preliminary screening comments were provided by the Beverly and Qamanirjuaq Caribou Management Board to the MVLWB on August 10, 2007 in reference to the Bayswater Uranium exploration applications.
An audio recording of this meeting hosted by the Review Board on February 5, 2008, is available at the Review Board's offices. It is held in the public record of EA0708-002 Uravan South Boomerang Lake EA, as PR#32.
Preliminary screening documents
(9.06 MB)
Proposed agenda and details for a draft workplan information meeting / teleconference for EAs of Uravan Minerals Boomerang Lake South and North, and Bayswater Uranium El Lake and Crab Lake proposed mineral exploration programs.
Comments received by the Review Board on the draft Workplan for Bayswater Uranium's EL Lake mineral exploration program EA, on January 29, 2008.
El Lake project description
(3.46 MB)
EL Lake Draft Workplan
(705.41 KB)
A request from Bayswater Uranium Corporation for an extension of the December 17 deadline to submit a project description summary, to January 18, 2008, for the EL Lake mineral exploration program.
Acceptance of request for extension
(29.14 KB)
INAC status report on Upper Thelon
(309.68 KB)
Request for project description summary
(166.21 KB)
FRMC resolution opposing uranium exploration
(123.71 KB)
Developer's comments on how to structure EAs
(33.18 KB)
A consolidation by the Review Board of the responses received to the Oct. 3, 2007 "Call for Comments" on how to structure the four uranium exploration EAs currently ongoing. Comments from 12 organizations and individuals received.
The response addresses the issue of how to most effectively run four separate EA's in the Upper Thelon Basin. Comments include preference for separate public hearings for each developer, evidence transfer from the Ur Energy public record and a Terms of Re
Comments include support for a resource development and conservation plan for the Thelon Basin as a prerequisite for further mineral development in the area and concerns regarding consultation and the lack of benefits for the Athabasca Denesuline.
INAC response to MVEIRB request for comments
(95.27 KB)
The response addresses the issue of how to most effectively run four separate EA's in the Upper Thelon Basin. The recommendations by Environment Canada include the transfer of evidence from the UR-Energy EA and developer specific public hearings.
The response addresses the issue of how to most effectively run four separate EA's in the Upper Thelon Basin. One of the recommendations by the DKFN is to apply First Nations evidence gathered from the UR-Energy project to the four upcoming environmental
The response includes support for the transfer for UR Energy file information subject to party identification of relevant material, the deferment of an EA process until adequate progress occurs for a land and resource management plan in the Upper Thelon B
GNWT Response to Request for Comments
(82.35 KB)
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
WWF response to call for comments
(41.47 KB)
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin.
The response is to MVEIRB's request for comments on the above topic to address the issue of simultaneously conducting four separate EA's in the Upper Thelon Basin. From an expedition outfitter in the region.
Document identifying different options for the conduct of the four EAs currently underway on projects in the Upper Thelon River basin. Deadline for comments is Nov. 2, 2007. PLEASE NOTE: INTERESTED PARTIES SHOULD ONLY REPLY ONCE TO THIS REQUEST FOR
Notice of Lead EAO
(150.18 KB)
referral letter and PS report from MVLWB
(311.88 KB)
Staff report of MVLWB on MV2007C0010
(1.09 MB)
Letter from the MVEIRB to a distribution list of groups potentially interested in participating in the E1 Lake environmental assessment, noting that an EA has been started on this file, with a form for interested groups to fill out in order to stay on the
notice to developer of referral to EA
(64.18 KB)
Land Use Permit Application
(819.19 KB)